Tender Value
₹16.5 L
EMD Value
₹17,000
Closing Date
11 Jun 2026, 6:00 pm6d left
Executive Engineer, Und Irrigation Division, Jamnagar
REPAIRING OF CHECKDAM Repairing of Gajana checkdam on river Mokhavati near village Gajana Tal. Lalpur Dist. Jamnagar.
309093
04 of 2026-27
Open
Civil Works
Jamnagar
7 documents required · 7 mandatory
₹900
EXECUTIVE ENGINEER UND IRRIGATION DIVISION JAMNAGAR
₹17,000
27 May 2026
27 May 2026
27 May 2026
11 Jun 2026
27 May 2026
BILL OF QUANTITIES
(A) Percentage Rate Tender (Up to INR 10 Cr.)
Name of work : BIG CHECKDAM
Repairing of Gajana checkdam on river Mokhavati near village
Gajana Tal. Lalpur Dist. Jamnagar.
Item Description of Item (with brief Quantity Unit Rate In Amount
No. specification and reference to book of figures
specifications)
1 Dismantling C.C. foundation or flooring sorting & 8.00 Cum. 828.00
stacking useful and unuseful material in lead upto
200mt as directed etc. complete.
2(a) Excavation in all sort of strata and formations incl. 68.00 Cum. 79.00
depositing the unuseful excavated stuff as and
where directed incl sorting and stacking useful
materials as directed upto 200 mt lead and all lift
etc. complete incl. dewatering. (A) IN OVER
BURDEN HARD MURRUM.
2(b) (B) IN SOFT ROCK 58.00 Cum. 176.00
2(c) (C) IN HARD ROCK 68.00 Cum. 590.00
3 Drilling 25mm dia. holes at distant as specified 270.00 Rmt. 252.00
upto 3.00 mt. depth in checkdam foundation and
fixing anchor bars of specified diameter with
cement grout including cleaning holes as directed
etc. (Excluding cost of Bars)
4 Prov. & Laying in position cement concrete using 225.00 Cum. 3465.00
cement, sand and crushed metal coarse aggregate
by mass and machine mix for PCC/RCC including
necessary formworks compaction by vibrator,
curing as directed with all lead & lift etc
complete.(Excluding cost of steel) FOR .BODY
WALL, APRON, TRAINING WALL, SIDE WALL,
SPLAY WALL, KEY WALL, CUT OF WALL ETC.
4/E) "NOMINAL MIX" Concrete Grade 1:2:4 and
5 Providing, cutting, bending, binding and fixing in 7.30 M.T. 76574.00
position as per drawing TMT BAR, reinforcement
for R.C.C. works and anchor bars incl. cost of black
annealed 16 to 18 BWG M.S.. Wire etc. complete
with all lead and lift. (B) Fe-500
6 Cement Plaster 20mm thick in single coat to stone 35.00 Sqmt. 261.00
masonary in C.M. 1:3 incl. finishing curing
scaffolding etc. complete.
7 Earthwork / Back filling with selected earth 43.00 Cum. 141.00
brought from out side borrow area or from
excavated useful material including watering
ramming, compaction with pneumatic temping
and all lead and lift etc. complete.
8 Providing & fixing in position 100/110 mm dia 6.00 Rmt. 358.00
PVC Pipe weep holes in the retaining walls / side
wall / abt. etc.
9 Providing and laying STONE 15 LAUNCHING 210.00 Cum. 765.00
APRON by using 50% stone which having
weighing not less than 40 Kg or as specified incl.
hand packing and filling the interstices by spouls
etc. complete with all lead and lift.
I am/we are willing to carry out the work at ____________________ % below/above percent
(Should be written in figures and words) of the estimated rates mentioned above. Amount of
My/Our tender works out as under :-
Estimated Amount Rs. 16,46,975=20 Estimated Amount Rs. 16,46,975=20
Put to Tender Rs. Put to Tender Rs.
Deduct _______% Below Rs. __________ Add _______% Above Rs. __________
Net Rs. Net Rs.
(Rupees in words) ________________________ (Rupees in words) ________________________
1. The Contractor shall exhibit a board with detailed specification and details of work as
directed by the Engineer-In-Charge for which no extra payment shall be made.
2. The labour cess will be deducted as per prevailing rules i.e.1% of the work done.
3. GST and Income tax TDS will be deducted at a source while making payments of bills
4. In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per
Govt.G.R.:PRC-10/2017CementConsumption/16/CDate:11/05/2017as stated in S.O.R.
therefore in R.C.C. items where there is a change as per actual mix design the cost of
difference of cement consumption have been deducted from the rate of original item at the
rate of input rate mentioned in all the tender.
5. The rates to be quoted by the contractor must be inclusive of all duties, taxes, and other
levies except GST payable by the contractor under the contract.
Signature of Contractor Executive Engineer
Und Irrigation Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
4.pdf
BOQ.pdf
Tender Notice No.4.pdf
Download all tender documents and submit your bid