Tender Value
₹14.1 L
EMD Value
₹28,215
Closing Date
9 Oct 2026, 2:00 pm
Executive Engineer,KID
Irrigation Waterways Directorate Office of the Executive Engineer Kakdwip Irrigation Division Postal address Kakdwip, South 24 Parganas
Construction of Brick Paved Road at Namkhana Railway Station to Paribesh guest house PR road Connector for a length of 270 M. at Namkhana point at Mouza-Narayanpur, Block-Namkahan under Kakdwip Irrigation Division I.C. with G.S.Mela-2027
2026_IWD_5075711_25
WBIW/EE/KIDIVISION/e-NIT- 03 (e)/2026-27
Open Tender
CIVIL WORKS
Percentage
35 days
Namkhana
Please refer Tender documents.
6 documents required · 6 mandatory
₹28,215
Yes
26 Sept 2026
26 Sept 2026
9 Oct 2026
26 Sept 2026
9 Oct 2026
26 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by Engineer-in- Charge:
All kinds of soil | 945 | Sqm | 155.4 | ₹1,46,853 |
| 2 | Brick edging in full brick width and half brick depth including excavation, refilling and disposal of surplus earth lead upto 50 metres.
With common burnt clay F.P.S. (non modular) bricks of class designation 7.5 | 547 | Metre | 232.54 | ₹1,27,199.38 |
| 3 | CARRIAGE OF MATERIALS
b) Loading and Unloading of bricks/stone sets | 1,26,390 | /1000 nos | 280.84 | ₹3,54,95,367.6 |
| 4 | Carriage for bricks.
(i)Surfaced Road
Distance upto 15.00 km | 1,26,390 | 1000 Nos/K\m | 412.94 | ₹5,21,91,486.6 |
| 5 | Earthwork in excavation in all kinds of soil for making embankments, repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other mechanical means on land, including loading, transporting, unloading and stacking with all lifts bothways and head load where necessary and depositing the same on embankments, channels, filling depressions in requisite profile, levelling as per direction of the Engineer-in-charge within a lead of
E) Beyond 4.00 Km and upto 5.00 Km
NB: Measurement to be taken on the basis of stack measurement / pre-post work section measurement after deduction of void as per norms. No extra payment will be made for stacking.
Note 1: Extra rate towards compensation for earth for land owned / arranged by the contractor over rate of earthwork for land owned / arranged by the Department has been added in this derivation @ ₹43.00/m³ [Vide Ref: Page No: 87, Item No: 16(Note) of NH Schedule of Rates 2019]
Note 2: The rate of royalty for earth/soil/fine sand/silt used for filling/brick making ( including such materials derived from dredging/de-silting) as notified same as that of Ordinary Earth/Brick Earth/fuller Earth vide Gazette notification No. 581-ICE-12013(99)/6/2022-MINES SEC-Dept. of ICE, Date:- 26.09.2022 of Department of Industry, Commerce & Enterprises Mines Branch @ ₹29.00/m³ has been added in this derivation. The royalty will be paid to the agency on production of necessary documents in support of paymentmade towards the royalty.
Note 3: Extra rate towards cess for earth for land owned / arranged by the contractor over rate of earthwork for land owned / arranged by the Department has been added in this derivation @ ₹5.30/m³ [Vide Ref: Memo No: 138/3512-29/C/99 Dated; 22.06.2000 of DLR & Jt. LRC, WB] | 573.75 | cum | 392.46 | ₹2,25,173.93 |
| 6 | Supplying to site and pitching with 1st class kiln burnt or picked Jhama bricks including dressing, ramming and preparing bed to proper slope complete with necessary earth work not exceeding 300 mm. in depth and filling gaps with powdered earth or local sand etc. complete (The rate is including cost of sand).
i) With 1st class kiln burnt brick | 472.5 | Sqm | 1,013.03 | ₹4,78,656.68 |
| 7 | Labour for laying soiling with departmental bricks including carriage of departmental bricks within a lead of 150 metres preparation of bed as necessary with brick joints properly filled in and packed with brick joints properly filled in and packed with local sand or powdered earth and including necessary cushion of similar materials below the soling (and in between layers when more than one layer is used) for Kakdwip.
(d) Soling or dry pavement with one brick-on-edge laid in herring bone pattern over a layer of brick flat (thickness 125 mm plus 75 mm) . | 472.5 | %Sqm | 8,740.66 | ₹41,29,961.85 |
| 8 | Labour for taking out brick-on-edge of herring bone bond including removing debris to flank or berm sorting out serviceable materials and stacking for Kakdwip.
D) Bricks on Herring bone pattern. | 945 | %Sqm | 2,064.2 | ₹19,50,669 |
| 9 | Labour for taking out old soling edging including emoving debris for Kakdwip
(a) Single flat soling | 945 | %Sqm | 1,175.11 | ₹11,10,478.95 |
| 10 | Labour for taking out brick-on-end edging including removing debris to flank or berm sorting out serviceable materials and stacking for Kakdwip. | 547 | %Metre | 798.51 | ₹4,36,784.97 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.51 MB
Tendernotice_2.pdf
PDF • 0.26 MB
BOQ_5166553.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .