| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 CrAccepted-AOC JHAWAREDI POST KARBARI IDBI BANK COMPLEX SHIMLA ROAD DEHRADUN | ₹1.9 Cr | L1 | Accepted-AOC QUALIFIED |
| 2 | L2₹2.0 Cr+₹9.8 L (5.07%)Rejected-Finance VILL UPPER NATHANPUR PO NEHRUGRAM NR AMBIWALA GURUDWARA DEHRADUN | DEHRADUN | UTTARAKHAND | 248001 | ₹2.0 Cr+₹9.8 L (5.07%) | L2 | Rejected-Finance NOT QUALIFIED |
| 3 | Not Admitted-Fee/PreQual/Technical 22 A AKASHDEEP COLONY BALLUPUR ROAD DEHRADUN | - | - | Not Admitted-Fee/PreQual/Technical Others-EARNEST MONEY IS NOT SUBMITTED IN ONLINE AND OFFLINE MODE. |
Tender Value
Refer Docs
EMD Value
₹3.9 L
Closing Date
20 Feb 2025, 12:00 pmClosed
SE
EDC,Karanprayag
Replacement of ACSR Weasel conductor by AAAC AL-59, 70 SQMM covered conductor of 11KV Collectrate Feeder from kotiyalsain sub-station to Kund against Capital (SI) Head under EDD Gopeshwar on Semi-Turnkey basis
2024_UPCL4_79126_2
34/EDC(K)/2024-25
Open Tender
Repair and Maintenance Works
Item Rate
Gopeshwar
As Per NIT
3 documents required · 3 mandatory
₹11,800
EE,EDD Gopeshwar
₹3.9 L
24 May 2025
28 Jan 2025
21 Feb 2025
28 Jan 2025
20 Feb 2025
28 Jan 2025
SUPPLY OF MATERIAL PORTION
11 KV AAAC AL-59 , 70 sq mm Covered Conductor (As per EN- 50397- 1:2006) .The conductor shall be stranded, round, non compacted and water tight. Non Compacted conductor shall comply with all the requirement of EN 50397-1- 2006. The stranded conductor shall be longitudinally water blocked by means of a water blocking material.The semi conducting screen, inner insulation and outer insulation should be extruded in one step. The outer covering insulation shall be UV-stabilized, tracking resistant black XLPE.
MVCC Accessories (As per EN - 50397-2) as below:
11 KV Tension Clamp with bail & IPC
11 KV Cable Ties for Pin Insulator.
11 KV IPC for covered to covered connections
11 KV IPC for covered to Bare connections
11 KV Mid Span Jointing Kit
IPC with Aluminium Bail for earthing
PP and Clamp for SP-33with N&B
Stay Clamp for SP-33 with N&B
PP and Clamp for SP-55 with N&B
Stay Clamp for SP-55 with N&B
Bracing Clamp Top for SP 33 with N&B
Bracing Clamp Bottom For SP 33 With N&B
Bracing Clamp Top For SP 55 With N&B
Bracing Clamp Bottom For SP 55 With N&B
LABOUR PORTION
Cartage of following material from ESC to Road site of work dist. Apprx.20 km Loading/unloading comp.
ST pole SP-33
ST pole SP-55
Small Material
Head load cartage of following material from road site to work site dist. Apprx. 0-2 km Loading/unloading comp.
ST pole SP-33
ST pole SP-55
Small Material
Fabrication of steel by cutting and drilling properly
Digging of pit for Pole as per upcl norms.(0.9*0.6*1/6 Pole Length)*Pole
Erection of new 11 KV S/P Structure on SP-55 as per upcl norms
Erection of new 11 KV D/P on SP-33 Structure as per upcl norms
Grouting of Pole as per norms (0.45*0.45*1/9 of pole length)*Pole
Digging of pit for stay as per upcl norms (0.6*0.6*1.20 Mtr)
Grouting of Stay as per norms (0.6*0.6*0.3)*stay
Erection of 11 KV stay as per upcl norms
Removing of old conductor with opening of existing jumpering and making of bundle
Laying, spreading, stringing, sagging of 11 KV line of AAAC AL-59 , 70 sq mm Covered Conductor including proper sagging with binding and jumpering as per user manual and sagging comp. work done(Inclusive of cartage and head load cartage at work site).Rollers of the appropriate diameter and quantity have to to be provided for installation.The rollers shall have a smooth clean surface, no sharp edges and shall rotate easily.To prevent the covering from damage any abrasive contact with soil or stone is not permitted. Abrasive contact of the covering with branches or similar shall be avoided.Covered conductor shall be pulled by using appropriate pulling devices ensuring that the pulling force is distributed to the conductor.Recommendations given in EN-50397-3 should be followed for storage, transport and installation of covered conductor.
11 KV AAAC AL-59 , 70 sq mm Covered Conductor (As per EN- 50397- 1:2006)
Fixing of MVCC Accessories
11 KV Tension Clamp with bail & IPC
11 KV Cable Ties for Pin Insulator.
11 KV IPC for covered to covered connections
11 KV IPC for covered to Bare connections
11 KV Mid Span Jointing Kit
IPC with Aluminium Bail for earthing
Providing and Earthing of poles (New and Existing pole)
Painting of Pole .
Back head load cartage of dismantled material from work site to work road side.Average distance 3 Km
(A) Line material
Back cartage of dismantled material from work road side to Store centre Rishikesh.Average distance 160 Km
(A) Line material
BIJENDRA KUMAR POKHRIYAL (BID ID -359630)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .