Tender Value
₹9.2 Cr
EMD Value
₹6.1 L
Closing Date
12 Jan 2026, 3:30 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
Above/Below/Par
WORKS
14 conditions · 2 needing a document upload
10.2 - Financial Eligibility Criteria: The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less; where V= Advertised value of the tender in crores of Rupees. N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, as provided at Page 41 of tender documents, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
10.1 Technical Eligibility Criteria: (a)The tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i)Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or (ii)Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or (iii)One similar work costing not less than the amount equal to 60% of advertised value of the tender. (b) (1)In case of tenders for composite works (e.g. works involving more than one distinct component, such as Civil Engineering works, S&T works, Electrical works, OHE works etc. and in the case of major bridges - substructure, superstructure etc.), tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i)Three similar works each costing not less than the amount equal to 30% of advertised value of each component of tender, or (ii)Two similar works each costing not less than the amount equal to 40% of advertised value of each component of tender, or (iii)One similar work each costing not less than the amount equal to 60% of advertised value of each component of tender. Note for b(1): Separate completed works of minimum required values shall also be considered for fulfillment of technical eligibility criteria for different components. (b)(2)In such cases, what constitutes a component in a composite work shall be clearly pre- defined with estimated tender cost of it, as part of the tender documents without any ambiguity. (b) (3) To evaluate the technical eligibility of tenderer, only components of work as stipulated in tender documents for evaluation of technical eligibility, shall be considered. The scope of work covered in other remaining components shall be either executed by tenderer himself if he has work experience as mentioned in clause 7 of the Standard General Conditions of Contractor through subcontractor fulfilling the requirements as per clause 7 of the Standard General Conditions of Contract or jointly i.e., partly himself and remaining through subcontractor, with prior approval of Chief Engineer in writing. However, if required in tender documents by way of Special Conditions, a formal agreement duly notarised, legally enforceable in the court of law, shall be executed by the main contractor with the subcontractor for the component(s) of work proposed to be executed by the subcontractor(s), and shall be submitted along with the offer for considering subletting of that scope of work towards fulfilment of technical eligibility. Such subcontractor must fulfill technical eligibility criteria as follows: The subcontractor shall have successfully completed at least one work similar to work proposed for subcontract, costing not less than 35% value of work to be subletted, in last 5 years, ending last day of month previous to the one in which tender is invited through a works contract. Non-submission of the Completion certificate issued by the Competent Authority shall result into summarily rejection of the offer.
Defination of Similar Work :- 2.19 - Construction of any type of Bridge more than 3.0 m span.
24 conditions · 2 needing a document upload
"The said suppliers of goods and/or services would be subject to GST Act and Rules as applicable from time to time. Tenderers are requested to submit their offers as per GST Tax regime. All the bidders/tenderers should ensure that they are GST compliant and their quoted tax structure/rates are as per GST Law"
Successful tenderers are required to submit the number of labour to be employed for this particular work. Also the list showing names, along with all other details, of male and female workers employed in this work, should be submitted to office, at the time of submitting performance guarantee and before executing contract agreement. They should also ensure that 1) The payment to the contract labour should be made through bank/cheque. 2) Identity Cards should be issued to all contract workers. 3) Necessary steps should be taken to deduct provident fund from the payment made to contract labour and ensure that the same is credited to their Provident Fund account. 4)Medical facilities from ESI should be ensured, if applicable.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Tenderers are required to submit a copy of cancelled cheque in order to facilitate the payments regarding refund of EMD etc. in their proper accounts.
In addition to latest provisions of GCC, and all contents of tender documents, all other latest instructions of Railway Boards issued vide various letters received from time to time on concerned matters and related to tender, will also be applicable for the tenders as per necessity and tenderers have to co-operate with Railways and ensure the compliance
I/We agree to carry out all works with use of modern equipments of required capacity for the work without extra payment. The decision of railway engineer shall be final and binding in this regard.
It is the responsibility of contractor to arrange the payment of the labour employed for the work through bank and to deduct PF as per the provisions of Minimum Wages Act.
The quantities shown above are approximate and to give a general guideline. Railway reserves a right to increase, decrease or to delete any of the items mentioned in schedule.
As per ACS 1 to GCC April 2022, issued vide Railway Board's letter dt. 14.07.2022, PVC Clause shall be applicable only in tenders having advertised value above Rs. 2 Crores provided to the provisions as per clause 46A-1. Tenderers should take a note and quote their rates accordingly.
In case Civil work tenders, the quantity of cement required in the items where necessary, will be used by the contractor on the same rates as accepted in tender, as per the quantity mentioned against each item in USSOR/DSR, though not mentioned in tender schedule.
Tenderers are advised to quote their rates including all type of taxes and levies etc. to be paid by them. Any extra payment will not be made on account of taxes/Levies etc., in excess of Contract Agreement Value,
In case of submission of Bid Security in the form of Bank Guarantee, a scanned copy of Original BG valid for a period of 90 days beyond the validity period of tender, and addressed in favour of Sr. DFM/WCR/BPL, shall be uploaded on IREPS portal while applying for tender. And As per ACS 2 to GCC April 2022, circulated vide Railway Board letter dt. 13.12.22, original BG should be delivered in person to the Concerned Official in Office before closing date for submission of bid (i.e. Excluding the last date of submission of bid) without fail. Any failure in this connection shall lead to summary rejection of bid.
Indian Railways Standard General Conditions of Contract, April 2022 (GCC, April 2022) has been introduced and available on website with all correction slips issued up to date for inviting tender and same will be applicable for this tender. Advance Correction Slip No. 1, 2, 3, 4, 5, 6, 7, 8, 9 and 10 to Indian Railways Standard General Conditions of Contract, April - 2022 circulated by the Railway Board vide letter No. 2022/CE-I/ CT/GCC-2022/Policy dated 14.07.2022, 13.12.2022, 26.04.2023, 07.08.2023, 20.10.2023 , 21.12.2023, 25.09.2024, 20.12.2024, 09.01.2025 and 04.03.2025 are applicable to this tender. Tenderers are requested to download the same from the railways website and ensure the implementation of the latest provisions made in GCC while execution of work. After that, if any latest correction slip issued by Railway Board on any matter, will also be applicable with immediate effect, though not mentioned in original tender document.
Maintenance period will be 12 months from the date of successful completion of work.
A) Itarsi-Bhopal section: Provision of Limited Height Subway (LHS) at Budni at Km. 764/9-11 under the Jurisdiction of ADEN/M/Bhopal. B) Bhopal-Bina section: Provision of Limited Height Subway (LHS) at Km. 878/08-10 near Sanchi station under the Jurisdiction of ADEN/M/Vidisha. C) Bhopal-Bina section: Provision of Limited Height Subway (LHS) at Km. 927/00-02 near Ganj Basoda station under the Jurisdiction of ADEN/M/Vidisha.
WCR-BPL-W-25-26-C-32-125~WCR
WCR-BPL-W-25-26-C-32-125
Open
Works - General
15 Months
Bhopal, Madhya Pradesh
₹0
₹6.1 L
12 Jan 2026
20 Dec 2025
29 Dec 2025
124 items across 8 schedules · ₹10,73,70,471.06 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| 1 | 0m to 10m | Metre | 10.00 | 1,271.04 | 12,710.4 |
| 2 | All kinds of soils | cum | 1360.15 | 212.37 | 2,88,855.06 |
| 3 | Soft rock (not requiring blasting) | cum | 103.55 | 451.73 | 46,776.64 |
| 4 | Wing wall and Return wall | cum | 212.16 | 3,550.29 | 7,53,229.53 |
| 5 | Providing and laying Plain Cement Concrete 1:3:6 with graded stone aggregate of 40mm nominal size, in foundation and floors, retaining walls of bridges including mechanical mixing, vibrating, pumping bailing out water where ever required with all materials and labour complete excluding the cost of cement and shuttering as per drawings and technical specifications as directed by Engineer. | cum and but | 99.00 | 3,575.98 | 3,54,022.02 |
| 6 | Providing and fixing Weep Holes Abutments, Wing walls and Return walls etc., of new bridges with 110mm dia UPVC pipe Type A ISI marked with all contractor's men, material, transportation, all taxes as specifications and as directed by Engineer-in- Charge. | in Metre per | 144.00 | 319.74 | 46,042.56 |
| 7 | Providing and casting machine batched, machine mixed and machine vibrated Cement Concrete of specified grade as approved Design Mix, mixed in Mobile Concrete Batching/Mixing Plant at site RMC from approved plants, (Cast in-Situ/Pre- cast) in bottom/top slab, side walls, toe wall and sumps haunch filling head walls, thrust bed or any other component using 20mm graded crushed stone aggregate and coarse sand of approved quality of RCC box of size including finishing, Plasticiser approved proportions (as per IS:9103), modify workability without impairing strength and durability, complete as drawings and technical specifications directed by Engineer in charge. N o t e : Payment for cement, reinforcement and shuttering shall be made extra under relevant item. 2. Plasticiser shall invariably be used in approved proportion to increase workability with minimum possible quantity of cement for all grade of Design Concrete unless it is specifically approved citing reasons at the stage of Mix Design in that case deduction shall be made as relevant item. | cum per or any in to per as 1. Mix and per | 214.86 | 3,828.79 | 8,22,653.82 |
| 8 | All types of bridge sub-structures, e.g. pier, abutment, wing wall, retaining wall, RCC box type foundations, Abutment cap, Pier Cap, Inspection Platform & Pedestal over Pier cap, Fender wall, Diaphragm wall etc. up to above ground level | Sqm 5m | 1129.00 | 749.27 | 8,45,925.83 |
| 9 | Ordinary Portland Cement 53 grade approved brands/makes | of MT | 213.20 | 9,075.23 | 19,34,839.04 |
| 10 | Thermo-Mechanically Treated bars of grade Fe-500D or more of approved brands/makes. | Kg | 72127.00 | 118.78 | 85,67,245.06 |
| 11 | Casting and installation of single/twin RCC box of all sizes with or without common web section after supporting the track temporary girders including design pushing scheme, thrust bed, casting of RCC components, with specified grade controlled concrete, pushing it in correct position and alignment below Railway track/Road following all measures of track safety by 'Air pushing technique" as approved drawings/scheme, in all types soils with disposal of surplus earth away from vent up to 1 Km, fixing arrangement for services & utilities including parapet walls both sides, wearing course, foot paths, plaques, drainage arrangements etc. and other incidental works to complete ROB/RUB/Canal crossing in all respect as specifications to the satisfaction of Engineer- in-Charge. N o t e : (1) The rate includes items of work/supplies for complete job in respects except "cost of Reinforced cement concrete, cement, reinforcement shuttering" of (i) main RCC Box; (ii) Thrust Bed; (iii) Footpath (iv) Parapet wall and wearing Course only, which shall be paid extra under relevant items of USSOR. (2) CC Cribs as required and Temporary Girder shall be supplied by Railways at available location. (3) Transportation of Temporary Girder to site shall be paid separately under relevant item.. (4) The payment for this item shall be made for the clear inner cross section area of the parent RCC Box/Boxes and barrel length i.e. clear inner volume parent RCC Box/Boxes. | cum on of all of per of all on all the per all all & (v) The of | 236.34 | 3,539.59 | 8,36,546.7 |
| 12 | Above 150 km up to 200 km | MT | 195.00 | 959.62 | 1,87,125.9 |
| 13 | Above 200 km | MT-Km | 9750.00 | 5.11 | 49,822.5 |
| 14 | Applying Epoxy Poly-sulphate Paint three coats on existing bottom surface of deck slab including cleaning surface of dirt, dust other foreign matter, sand papering, wire brushing as required with all contractor's materials tools, machinery, scaffolding, lead, lifts etc. complete as per specifications as directed by Engineer in-charge | Sqm & and | 1392.00 | 400.85 | 5,57,983.2 |
| 15 | Structural steel plate girders | MT | 195.00 | 1,272.35 | 2,48,108.25 |
| 16 | Structural steel plate girders. | MT | 195.00 | 1,005.46 | 1,96,064.7 |
| 17 | Supply and laying of quarry dust including consolidation, supply of all materials, labour, lead, lift, tools, plants, crossing of tracks per drawing and technical specification directed by the Engineer in charge in case loose slush is encountered at site foundation before casting the foundation laying the filtering media. | cum as as of or | 73.00 | 1,033.01 | 75,409.73 |
| 18 | Providing Boulder Backing behind wing wall, return wall, retaining wall with hand packed boulders & cobbles with smaller boulders toward the back including all lead, lift, labour & other incidental charges complete work in all respect. Payment boulder/cobbles will be done extra. | cum size as for | 104.00 | 407.41 | 42,370.64 |
| 19 | For average lead up to 50m and lift up to 5m | cum | 176.00 | 113.06 | 19,898.56 |
| 20 | When distance of nearest quarry is more than 50 km and up to 100 km | cum | 176.00 | 1,395.56 | 2,45,618.56 |
| 21 | For PSC Sleeper Track with Sleeper Density of 1660 | TRM | 200.00 | 144.51 | 28,902 |
| 22 | For PSC Sleeper Track with Sleeper Density of 1660 | TRM | 200.00 | 111.16 | 22,232 |
| 23 | With Hot melt thermoplastic road marking paint | Sqm | 18.00 | 157.13 | 2,828.34 |
| 24 | JCB Backhoe Loaders 3DX Plus or similar with minimum 1.10 cum bucket capacity | Hour | 40.00 | 830.66 | 33,226.4 |
| Schedule total | ₹1,62,18,437.44 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .