Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.9 CrAdmitted-Finance | ₹5.9 Cr | L1 | Admitted-Finance |
| Sl No | Description | Qty | Unit | kmv projects limited L1 |
|---|---|---|---|---|
| 1.00Landscape & Horticulture work | ||||
| 2.00 | Trenching in ordinary soil upto a depth of 60cm including removal and stacking of serviceable materials and then disposing of by spreading and neatly levelling with in a lead of 50m and making up the trenched area to proper levels by filling with earth or earth mixed with sludge or/ and manure before and after flooding trench with water (excluding cost of imported earth, sludge or manure) | 2,880 | Cum | 78 ₹2,24,640 Lowest |
| 3.00 | Supplying and stacking of good earth at site including royalty and carriage upto 5 k m lead complete (earth measured in stacks will be reduced by 20% for payment). | 4,050 | Cum | 655 ₹26,52,750 Lowest |
| 4.00 | Supplying and stacking sludge at site including royalty and carriage upto 5 km lead complete (sludge measured in stacks will be reduced by 8% for payment). | 282 | Cum | 390 ₹1,09,980 Lowest |
| 5.00 | Rough dressing the trenched ground including breaking clods | 11,250 | Sqm | 2 ₹22,500 Lowest |
| 6.00 | Uprooting weeds from the trenched area after 10 to 15 days of its flooding with water including disposal of uprooted vegetation. | 11,250 | Sqm | 5 ₹56,250 Lowest |
| 7.00 | Fine dressing of the ground. | 11,250 | Sqm | 4 ₹45,000 Lowest |
| 8.00 | Spreading of sludge, dump manure or / and good earth in required thickness (Cost of sludge, dump manure orl and good earth to be paid separately) | 281.25 | Cum | 52 ₹14,625 Lowest |
| 9.00 | Preparation of beds for hedging and shrubbery by excavating 60cm deep and trenching the excavated base to a furthe r depth of 30cm, refilling the excavated earth after breaking clods and mixing with sludge or manure in the ratio of 8:1 (8 parts of stacked volume of earth after reduction by 20% : one part of stacked volume of sludge or manure after reduction by 8%), flooding with water, filling with - earth if necessary, watering and finally fine dressing , levelling etc. including stacking and disposal of materials declared unserviceable and surplus earth by spreading and levelling as directed, within a lead of 50m lift upto 1.5 m complete (cost of sludge , manure or extra earth to be paid for separately) . | 281.25 | Cum | 223 ₹62,718.75 Lowest |
| 10.00 | Digging holes in ordinary soil and refilling the same with the excavated earth mixed with manure or sludge in the ratio of 2:1 by volume (2 parts of stacked volume of earth after reduction by 20% : 1 part of stacked volume of manure after reduction by 8%) flooding with water, dressing including removal of rubbish and surplus earth, if any, with all leads and lifts (cost of manure, sludge or extra good earth if needed to be paid for separately) | 544 | Each | 146 ₹79,424 Lowest |
Tender Value
Refer Docs
EMD Value
₹5.6 L
Closing Date
7 Sept 2022, 5:00 pmClosed
NODAL OFFICER
e-Procurement Cell, Jharkhand State Building Construction Corporation Ltd., Beside Jharkhand Mantralaya Dhurwa, Ranchi-834004.
Supply, Installation, and Commissioning of Passenger Lifts and Landscaping work in New Campus of Binod Bihari Mahato Koylanchal University, Dhanbad
2022_JSBCC_61067_2
JSBCCL/100/2022-23
Open Tender
Civil Works - Buildings
Item Rate
180 days
Dhanbad
Please refer Tender documents.
4 documents required · 4 mandatory
₹10,000
Yes
JSBCCL
₹5.6 L
13 Oct 2022
1 Sept 2022
9 Sept 2022
1 Sept 2022
7 Sept 2022
1 Sept 2022
Amount
Landscape & Horticulture work
Trenching in ordinary soil upto a depth of 60cm including removal and stacking of serviceable materials and then disposing of by spreading and neatly levelling with in a lead of 50m and making up the trenched area to proper levels by filling with earth or earth mixed with sludge or/ and manure before and after flooding trench with water (excluding cost of imported earth, sludge or manure)
Supplying and stacking of good earth at site including royalty and carriage upto 5 k m lead complete (earth measured in stacks will be reduced by 20% for payment).
Supplying and stacking sludge at site including royalty and carriage upto 5 km lead complete (sludge measured in stacks will be reduced by 8% for payment).
Rough dressing the trenched ground including breaking clods
Uprooting weeds from the trenched area after 10 to 15 days of its flooding with water including disposal of uprooted vegetation.
Fine dressing of the ground.
Spreading of sludge, dump manure or / and good earth in required thickness (Cost of sludge, dump manure orl and good earth to be paid separately)
Preparation of beds for hedging and shrubbery by excavating 60cm deep and trenching the excavated base to a furthe r depth of 30cm, refilling the excavated earth after breaking clods and mixing with sludge or manure in the ratio of 8:1 (8 parts of stacked volume of earth after reduction by 20% : one part of stacked volume of sludge or manure after reduction by 8%), flooding with water, filling with - earth if necessary, watering and finally fine dressing , levelling etc. including stacking and disposal of materials declared unserviceable and surplus earth by spreading and levelling as directed, within a lead of 50m lift upto 1.5 m complete (cost of sludge , manure or extra earth to be paid for separately) .
Digging holes in ordinary soil and refilling the same with the excavated earth mixed with manure or sludge in the ratio of 2:1 by volume (2 parts of stacked volume of earth after reduction by 20% : 1 part of stacked volume of manure after reduction by 8%) flooding with water, dressing including removal of rubbish and surplus earth, if any, with all leads and lifts (cost of manure, sludge or extra good earth if needed to be paid for separately)
Filling mixture of earth and sludge or manure in the desired proportion in trenches, flooding with water and levelling (cost of supplying earth and sludge or manure and mixing excluded).
Flooding the ground with water including making kiaries and dismantling the same.
Complete maintenance of the entire garden features having as per yard stick in the garden area i.e. lawn trees, shrubs,herbs, edge, flower beds, foliages, creepers etc. including hoeing pruning replacement of plants, gap filling, watering, mowing of lawn, grass cutting by lawn mover and brush cutter, removal of garden waste, applying insecticide, pesticide & fertilizers(whenever required) top dressing of lawn with good earth and manure and maintenance of other garden related works as directed by officer-in-charge (Cost of Good Earth, Manure, Fertilizer, Insecticide, Pesticide, lawn mover and brush cutter with fuel & other T & P material/articles shall be provided by the department.)
TREE PLANTATION
Providing and stacking of Casuarina equisetifolia of height 150-165 cm in big poly bags of size 25 cm as per direction of the officer-in-charge.
Providing and stacking of Delonix regia (Gulmohar) of height 150-165 cm. in big poly bags of size 25 cm as per direction of the officer-in-charge.
Providing and stacking of Alstonia scholaris of height 150-165 cm. in bag of size 25 cm as per direction of the officer-in-charge.
Providing and stacking of Mimusops elengi (Maulsri) of height 150-165 cm. in big poly bag of size 25 cm as per direction of the officer-in-charge.
Providing and stacking of Plumeria alba of height 165-180 cm. with 3-4 branches and thick stem in big size HDPE bags as per direction of the officer-in-charge.
Providing and stacking of Saraca indica (Sita Ashok) of height 105-120 cm. in big poly bags of size 25 cm as per direction of the officer-in-charge.
Providing and stacking of Terminalia arjuna of height 150-165 cm. in big polybags of size 25 cm as per direction of the officer-in-charge.
NON-SCHEDULE ITEMS
Landscape & Horticulture work
Providing and stacking plant of Lagerstroemia speciosa of height 9 ft. in bag of size 25 cm as per direction of the officer-in-charge.
Providing and stacking of Albizia procera plant of height 9 ft. in bag of size 25 cm as per direction of the officer-in-charge.
Providing and stacking of Callistemon specious plant of height 9 ft. in bag of size 25 cm as per direction of the officer-in-charge.
Providing and stacking of Syzigium cumini plant of height 9 ft. in bag of size 25 cm as per direction of the officer-in-charge.
Providing and stacking of Lagerstroemia indica plant of height 9 ft. in bag of size 25 cm as per direction of the officer-in-charge.
Providing and stacking of Casia fistula plant of height 9 ft. in bag of size 25 cm as per direction of the officer-in-charge.
Providing and stacking of Chukrasia tabularis plant of height 9 ft. in bag of size 25 cm as per direction of the officer-in-charge.
Providing and stacking of Royal Palm of height 9 ft. in bag of size 25 cm as per direction of the officer-in-charge.
Providing and stacking of Azadirahtata indica plant of height 9 ft. in bag of size 25 cm as per direction of the officer-in-charge.
Providing and stacking of Veriegated bauhina plant of height 9 ft. in bag of size 25 cm as per direction of the officer-in-charge.
Providing and stacking of Samanea saman plant of height 9 ft. in bag of size 25 cm as per direction of the officer-in-charge.
Providing and stacking of Conocarpus plant plant of height 6 ft. in bag of size 33 cm as per direction of the officer-in-charge.
GROUND COVER PLANTATION
Providing and stacking of Abelia variegated as per direction of the officer-in-charge. (GROUND COVER PLANTATION)
Providing and stacking of Acalypha hispaniole as per direction of the officer-in-charge. (GROUND COVER PLANTATION)
Providing and stacking of Ajuga ( ajuga reptans ) as per direction of the officer-in-charge. (GROUND COVER PLANTATION)
Providing and stacking of White veriegated ( alternenthera ) as per direction of the officer-in-charge. (GROUND COVER PLANTATION)
FOUNTAINS
Design, Supply & Installation of "three stage jet fountain"
Design, Supply & Installation of "three stage jet fountain"
Design, Supply & Installation of "three stage jet fountain"
Design, Supply & Installation of "three stage jet fountain"
Supply & Installation of Cast iron Royal Bench (with FRP Strips)
PASSENGER LIFT
Add 18% GST
Add 1% Labour cess 1%
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .