| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.6 LAccepted-AOC | 1 | Accepted-AOC L1 | |
| 2 | 2₹1.8 L+₹13,974.06 (8.49%)Rejected-Finance | 2 | Rejected-Finance L2 |
Tender Value
₹1.7 L
EMD Value
₹4,213
Closing Date
10 Mar 2025, 10:00 amClosed
ASSISTANT ENGINEER
LSGD SECTION perinad GP
Annual Plan-2024-25- Perinad GP - Proj. No. 68/25-CONSTRUCTION OF COMPOUND WALL AT ANGANVADI NO - 20
2025_LSGD_742197_1
05/AE/LSGD/PRND/TNDR/2024-25
Open Tender
Civil Works - Others
Item Rate
180 days
perinad GP
Please refer Tender documents.
9 documents required · 9 mandatory
₹555
Yes
₹4,213
Yes
18 Apr 2025
27 Feb 2025
10 Mar 2025
27 Feb 2025
10 Mar 2025
27 Feb 2025
Amount
Compound wall
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
OD462301/2024-2025:60.7.1 DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
50.6.2.1:Solid block masonry using pre cast solid blocks (Factory made) of size 30x20x15 cm or nearest available size confirming to IS 2185 part I of 1979 for foundation and plinth with thickness 15cm in: CM 1:6 ( 1 cement :6 coarse sand) etc complete
13.4.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 coarse sand)
13.43.1:Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface:Water thinnable cement primer
13.44.1:Finishing walls with water proofing cement paint of required shade:New work (Two or more coats applied @ 3.84 kg/10 sqm)
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
10.25.2:Item Shifted to Sub head 14 as item 14.73 Item Shifted to head 14 as item 14.74 Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
13.52.1:Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete.On steel work
Swagath, Government Contractor (BID ID -2143991)
Bidder Name
Swagath, Government Contractor
Anandan N
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1194675.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .