Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | l1₹8.2 LAccepted-AOC | ₹8.2 L | l1 | Accepted-AOC l1 |
| 2 | l2₹8.3 LRejected-AOC | ₹8.3 L | l2 | Rejected-AOC l2 |
| 3 | l3₹8.3 LRejected-AOC | ₹8.3 L | l3 | Rejected-AOC l3 |
| 4 | Rejected-Technical | - | - | Rejected-Technical not qualified |
| 5 | Rejected-Technical | - | - | Rejected-Technical not qualified |
| Sl No | Description | Qty | Unit | M/s Rakesh Kumar L3 | SUSHIL WORKS & CONTRACTOR L2 | AJAB SINGH CONTRACTOR AND SUPPLIERS L1 |
|---|---|---|---|---|---|---|
| 0.00Laying and Jointing PVC Pipe. Heading | ||||||
| 1.00 | Earth work in excavation of foundation including all lead, lift and manual compaction. | 110.58 | cum | 140 ₹15,481.20 | 130 ₹14,375.40 | 128 ₹14,154.24 |
| 2.00 | C.C. 1:3:6 in foundation with crushed aggregate & coarse sand with all cost of material, T&P and labour complete. | 17.37 | cum | 5,650 ₹98,140.50 | 5,650 ₹98,140.50 | 5,600 ₹97,272 |
| 3.00 | 1" Class Brick work in 1:4 cement and coarse sand mortar including cost of material, T&P and labour complete ete. | 64.23 | cum | 5,250 ₹3.4 L | 5,240 ₹3.4 L | 5,200 ₹3.3 L |
| 4.00 | Ordinary centering and shuttering for R.C.C. work including placing in position with all cost of material, labour and T&P etc. complete. | 12.35 | sqm | 820 ₹10,127 | 820 ₹10,127 | 815 ₹10,065.25 |
| 5.00 | S/Fixing reinforcement for R.C.C. including bending, binding and placing in position with all cost of material, T&P and labour complete. | 0.46 | MT | 90,400 ₹41,764.80 | 90,120 ₹41,635.44 | 89,000 ₹41,118 |
| 6.00 | R.C.C. 1:1:2 in slab with crushed stone ballast and coarse sand including cost of material, T&P and labour complete. | 2.74 | cum | 7,550 ₹20,687 | 7,550 ₹20,687 | 7,500 ₹20,550 |
| 7.00 | C.C. 1:2:4 in slab wearing coat with all cost of material, T&P and labour complete. | 1.57 | cum | 6,100 ₹9,577 | 6,100 ₹9,577 | 6,000 ₹9,420 |
| 8.00 | Struck deep cement pointing in 1:2 C.M. i/c. cost of all material, labour, T&P etc. complete. | 94.42 | sqm | 110 ₹10,386.20 | 104 ₹9,819.68 | 100 ₹9,442 |
| 9.00 | Premould joint filler/tharmocol 25mm thick including supply of all materials, labour and completion of work. | 4.38 | sqm | 508 ₹2,225.04 | 508 ₹2,225.04 | 500 ₹2,190 |
Tender Value
₹8.4 L
EMD Value
₹16,720
Closing Date
22 Dec 2025, 12:00 pmClosed
EXECUTIVE ENGINEER
RCD RAMPUR
lot no 05
2025_UPIDC_1099612_5
04/EE/2025-26
Open Tender
Civil Works
25 days
Rampur
Please refer Tender documents.
2 documents required · 2 mandatory
₹354
₹16,720
22 Jan 2026
17 Dec 2025
22 Dec 2025
17 Dec 2025
22 Dec 2025
17 Dec 2025
Amount
Laying and Jointing PVC Pipe. Heading
Earth work in excavation of foundation including all lead, lift and manual compaction.
C.C. 1:3:6 in foundation with crushed aggregate & coarse sand with all cost of material, T&P and labour complete.
1" Class Brick work in 1:4 cement and coarse sand mortar including cost of material, T&P and labour complete ete.
Ordinary centering and shuttering for R.C.C. work including placing in position with all cost of material, labour and T&P etc. complete.
S/Fixing reinforcement for R.C.C. including bending, binding and placing in position with all cost of material, T&P and labour complete.
R.C.C. 1:1:2 in slab with crushed stone ballast and coarse sand including cost of material, T&P and labour complete.
C.C. 1:2:4 in slab wearing coat with all cost of material, T&P and labour complete.
Struck deep cement pointing in 1:2 C.M. i/c. cost of all material, labour, T&P etc. complete.
Premould joint filler/tharmocol 25mm thick including supply of all materials, labour and completion of work.
Supplying & fixing of P.V.C. Pipe 75 mm dia and 0.50 mtr.long with all cost of material, T&P and labour complete.
S/Laying dry brick on edge soling i/c. cost of all material, labour, T&P etc. complete.
Fixing R.C.C (1:1.50:3) Wheel Guard size (300x300x800) mm.
Finishing wall with one coat of water proof cement paint weather coat of approved quality on previously new surface with the paint to give an even shade including supply of all materials, labour, T&P ete required for proper completion of the work.
C.C. (1:6:12) cement, sand and coarse aggregate with 20-40 mm size filling in abutment along to road i/c. cost of all material, labour. T&P etc..complete
Supply and laying two layer of tarfelt over abutment cap as per direction of the Engineer in charge including necessary overlap including supply of all materials, labour and T&P etc. required proper completion of work.
Earth work in embankment (land wing wall filling, wing wall filling and embankment strengthing) in ordinary soil, earth work in embankment to be in 20 cm. layers, including ramming and dressing the surface to the required levels and slopes and also including 1.50 m lift and 600 m. lead. The earth from cutting to be used in making embankment or to be deposited as spoil bank withen 30 m distance as directed by Engineer in charge & also including all cost of borrwed earth from pvt. land, material, labour & T&P etc. complete.
Earth work in removing of Diversion including cost of labour, all T&P, leads and lift etc. complete.
SUSHIL WORKS & CONTRACTOR (BID ID -5769342)
M/s Rakesh Kumar (BID ID -5768946)
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.30 MB
BOQ_2025673.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid