Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.2 LAccepted-AOC | 1 | Accepted-AOC L1 Lowest quoted amount | |
| 2 | 2₹13.5 Cr+₹13.5 Cr (116899.6%)Rejected-AOC | 2 | Rejected-AOC L2 Second lowest quoted |
| Sl No | Description | Qty | Unit | Rajan P Mathews L1 | P K MURALIDHARAN NAIR L2 |
|---|---|---|---|---|---|
| 1.00Kulanada LI | |||||
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 57.96 | cum | 205.84 ₹11,930.49 Lowest | 252.22 ₹14,618.67 |
| 1.00 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 7.95 | sqm | 768.03 ₹6,105.84 Lowest | 930.48 ₹7,397.32 |
| 1.00 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.68 | cum | 8,380.52 ₹5,656.85 Lowest | 10,016.78 ₹6,761.33 |
| 1.00 | 5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 3.38 | cum | 7,961.18 ₹26,868.98 Lowest | 9,405.95 ₹31,745.08 |
| 1.00 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 66 | kilogram | 89.83 ₹5,928.78 Lowest | 105.12 ₹6,937.92 |
| 1.01 | 10.25.2:Item Shifted to Sub head 14 as item 14.73
Item Shifted to head 14 as item 14.74
Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | 22 | kg | 142.55 ₹3,136.1 Lowest | 165.57 ₹3,642.54 |
| 1.01 | 13.33.1:Pointing on stone work with cement mortar 1:3 ( 1 cement : 3 fine sand):Flush/ Ruled pointing | 8 | sqm | 319.97 ₹2,559.76 Lowest | 367.63 ₹2,941.04 |
| 1.01 | 13.7.1:12 mm cement plaster finished with a floating coat of neat cement of mix:1:3 ( 1 cement : 3 fine sand) | 110.6 | sqm | 374.9 ₹41,463.94 Lowest | 426.99 ₹47,225.09 |
| 1.01 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 1.59 | cum | 7,379.54 ₹11,733.47 Lowest | 8,635.63 ₹13,730.65 |
Tender Value
₹1.4 L
EMD Value
₹3,610
Closing Date
29 Oct 2025, 5:00 pmClosed
Assistant Executive Engineer
MI Subdivision Aranmula
GENERAL-MI PTA - Annual Maintenance of Civil Work 2025-26-Annual Maintenance of Kulanada LI Scheme-General Civil Work
2025_Irrig_813083_1
IRR/IA/TR/1985/2025_5_4_3/1
Open Tender
Civil Works - Others
Item Rate
180 days
Kulanada
Please refer Tender documents.
7 documents required · 7 mandatory
₹555
Yes
₹3,610
Yes
18 Nov 2025
22 Oct 2025
31 Oct 2025
22 Oct 2025
29 Oct 2025
22 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1359297.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_1359297.xls
BOQ • 0.30 MB
viewsbd.pdf
Tender Documents • 1.63 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .