Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
Refer Docs
EMD Value
₹4.9 L
Closing Date
22 Dec 2026, 4:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
EXECUTIVE ENGINEER, CDLKO-09, UPAVP, LUCKNOW
EXECUTIVE ENGINEER, CDLKO-09, UPAVP, VRINDAVAN YOJNA, LUCKNOW
CONSTRUCTION OF 33/11 KVA ELECTRIC SUB STATION, BOUNDARY WALL AND STAFF QUARTER IN SECTOR-09, OF AWADH VIHAR YOJNA LUCKNOW
2026_UPHDB_1212156_1
3301/Y-12/200 DATE-18.11.2026
Open Tender
Civil Works - Buildings
Percentage
SECTOR-9, AWADH VIHAR YOJNA
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,310
EXECUTIVE ENGINEER, CDLKO-09, UPAVP, LUCKNOW
₹4.9 L
Yes
25 Nov 2026
25 Nov 2026
23 Dec 2026
25 Nov 2026
22 Dec 2026
25 Nov 2026
90 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Main Building Cum Control Room-Civil Work
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
2.8.1
All kinds of soil. | 292.43 | CUM | 205.62 | ₹60,129.46 |
| 2 | Earth work in cutting or in embankment in ordinary soil, excavation to be in the regular pits not exceeding 0.5m in depth and earthwork in mbankment to be in 20cm. layers, including ramming and dessing the surface to required levels & slopes & also including 1.5 lift & 30m. lead. The earth from cutting to be used in making embankment or to be deposited as spoil banks within 30m. Distance as directed by the engineer incharge (Including Royalty). & Also including cartage up to 5 Km from out side the site of work & including cost of earth, watering, dressing & compacting the soil to achieve 95% proctor density. | 36.9 | CUM | 532.3 | ₹19,641.87 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering All work up to plinth level: 1:4:8 (1 Cement: 4 coarse sand (zone-III) derived from natural sources: 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 111.51 | CUM | 5,381.16 | ₹6,00,053.15 |
| 4 | Centering and Shuttering including strutting, propping etc. and removal of form for form for Foundations, footings, bases of columns, etc. for mass concrete. | 143.91 | Sqm | 309.78 | ₹44,580.44 |
| 5 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 31.85 | CUM | 1,120 | ₹35,672 |
| 6 | Providing and Injecting chemical emulsion for pre-constructional anti termite treatment and creating and chemical varrier under and around the coloumn pits wall, trenches, basement, excavation top surface of plinth filling junction of wall and floor along the external of the building expention joints surrounding of pipes and conduits etc complete plinth area of the building at the ground floor only shall be measured as per IS 6313 (part-II 1981) aldrine emulsifiable concrete or any other apporoved material such as hepthachlor or cholordance will be used. The rate of application 5 Lit/per sqm of chemical emulsion shall be as follows- 1- Treatment for masonary and foundation. 2- Back fill in immediate contact with foundation 7.50 Lit per sqm. 3- Treatment of top surface of plinth filling 5 Lit per sqm. 4- Treament of soil along external perimeters of building 7.50 lt/sqm. 5- Treatment of soil under appron along external perimeter 5 lit per sqm. | 396.76 | SQM | 135 | ₹53,562.6 |
| 7 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement: 1.5 coarse sand(zone-III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources). for plinth and lintels of doors and window | 23.5 | CUM | 9,088.8 | ₹2,13,586.8 |
| 8 | Centering and Shuttering including strutting, propping etc. and removal of form for Lintel, beams, plinth beams, girders, bressumers and cantilevers. | 191.79 | Sqm | 581.72 | ₹1,11,568.08 |
| 9 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral staircases above plinth level up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement: 1.5 coarse sand incuding manufactured sand derived from Recycled Concrete Aggregate (RCA) upto 20%: 3 graded stone aggregate 20 mm nominal size including Recycled Concrete Aggregate (RCA) upto 20%) For Slab | 50.82 | CUM | 8,953.88 | ₹4,55,036.18 |
| 10 | Centering and Shuttering including strutting, propping etc. and removal of form for Suspended floors, roofs, landings, balconies and access platform | 511.66 | Sqm | 732.49 | ₹3,74,785.83 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.80 MB
technicalbid.pdf
Tender Documents • 6.70 MB
financialbid.pdf
Tender Documents • 7.59 MB
BOQ_2304947.xls
BOQ • 0.72 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .