Loading…
Loading…
Tender Value
₹14.9 L
EMD Value
₹29,820
Closing Date
31 Aug 2026, 6:00 pm5d left
EXEN REW BARAMULLA
EXEN REW BARAMULLA
C/O Arch of Dever Stones on Link Road near National Highway road leading to Ziyarat Sharief Tapper and Monouments Park Tapper District Baramulla Pyt. Takiya Tapper . block. Pattan under CDF Hble MLA year.2026-2027
2026_RDPR_320504_24
196 Xen/Rew/Bla/2026-27 Dated 11/08/2026
Open Tender
Civil Works
Percentage
70 days
BARAMULLA
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Rural Development and Panchayati Raj
₹29,820
11 Aug 2026
11 Aug 2026
1 Sept 2026
11 Aug 2026
31 Aug 2026
11 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming ofbottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed. All kinds of soil | 16.65 | cum | 256.85 | ₹4,276.55 |
| 2 | P/L stone soling hand packed incl. Carraige by MT for 15 km | 1.39 | cum | 1,000 | ₹1,390 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 20 mm N. size) | 0.69 | cum | 5,202.9 | ₹3,590 |
| 4 | Providing and laying in position Reinforcement cement concrete of specified grade including curing but excluding the cost of centring and shuttering. , finishing and reinforcement All work upto plinth level with:1: 1.5 : 3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm N. size) | 6.8 | cum | 7,788.4 | ₹52,961.12 |
| 5 | Providing and laying in position Reinforcement cement concrete of specified grade including curing but excluding the cost of centring and shuttering. , finishing and reinforcement All work upto plinth level with:1: 1.5 : 3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm N. size) | 3.4 | cum | 9,865.69 | ₹33,543.35 |
| 6 | Providing and laying in position Reinforcement cement concrete of specified grade including curing but excluding the cost of centring and shuttering. , finishing and reinforcement All work upto plinth level with:1: 1.5 : 3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm N. size) | 6.06 | cum | 10,377.15 | ₹62,885.53 |
| 7 | Providing and Laying chisel dressed Devri Stone of size 300 x 200 mm face with 150 mm depth in cement mortar 1 :6 ( 1 cement :6 coarse sand ) Above plinth level including curing .One face dressed ( Fine chisel dressed ) | 75.44 | sq.mtr | 10,184.5 | ₹7,68,318.68 |
| 8 | 75 mm cornice work in devri stone for pillers and Arch | 73.37 | Rm | 2,200 | ₹1,61,414 |
| 9 | Providing and Fixing of Reinforcement , i/c cutting , bending , binding and placing in position . All compelete job , i/c all carriages and cost of material involved | 2,113.78 | kgs | 123.2 | ₹2,60,417.7 |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form for , Columns , beams , piers , abutments , posts and struts etc ( for mass concrete ) | 20.07 | sq.mtr | 286.35 | ₹5,747.04 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.14 MB
BOQ_1065802.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].