| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹11.4 LAdmitted-Fee/PreQual/Technical/Finance | -23.88% | ₹11.4 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹11.7 L+₹28,199.20 (2.47%)Admitted-Fee/PreQual/Technical/Finance | -22.00% | ₹11.7 L+₹28,199.20 (2.47%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹12.5 L+₹1.1 L (9.34%)Admitted-Fee/PreQual/Technical/Finance | -16.77% | ₹12.5 L+₹1.1 L (9.34%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹13.9 L+₹2.5 L (21.5%)Admitted-Fee/PreQual/Technical/Finance | -7.50% | ₹13.9 L+₹2.5 L (21.5%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹15 L
EMD Value
₹30,000
Closing Date
12 Aug 2026, 4:00 pmClosed
exen r and b watergam
ofc of xen r and b rafiabad
Construction of Niabat Office at watergam
2026_PWDJK_318607_2
e nit 35 of 2026-27 dated 30/07/2026
Open Tender
Civil Works
Percentage
120 days
rafiabad
NIT
2 documents required · 2 mandatory
₹600
exen r and b rafiabad
₹30,000
21 Aug 2026
30 Jul 2026
13 Aug 2026
30 Jul 2026
12 Aug 2026
30 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 2 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge: (i/c equivalent design mix) | 7.9 | M³ | 1,064.55 | ₹8,409.95 |
| 3 | Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunk and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. Beyond 60 cm girth upto and including 120 cm girth. | 2 | No. | 1,683 | ₹3,366 |
| 4 | Earth work in excavation by mechanical means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including dewatering (if any), getting out excavated earth and disposal of surplus excavated earth up to all leads and lifts. Complete Job | 55.57 | M³ | 256.85 | ₹14,273.15 |
| 5 | Providing and laying in position dry Nallah soling / Boulder filling with hand packing including carriage by Mechanical Transport / Manual Head Load (if any). Complete job | 7.02 | M³ | 1,000 | ₹7,020 |
| 6 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering. All work upto plinth level with: 1:4:8 Mix (1 cement : 4 coarse sand : 8 graded stone aggregate 20 mm nominal size) including carriage of ingrediants (mechanical / manual). Complete Job | 7.02 | M³ | 5,202.9 | ₹36,524.36 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form work for: (a) Raft/Foundation/Plinth- upto plinth level | 113.37 | M² | 286.35 | ₹32,463.5 |
| 8 | (b) Suspended floors, roofs, landings, balconies and access platforms | 44.58 | M² | 718.2 | ₹32,017.36 |
| 9 | Providing and laying in position Reinforced cement concrete of specified grade including curing but excluding the cost of centering, shuttering and reinforcement with: 1:1.5:3 Mix (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) including carriage of ingrediants (mechanical / manual). Complete Job | 8.64 | M³ | 7,788.4 | ₹67,291.78 |
| 10 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 6.11 | M³ | 9,821.85 | ₹60,011.5 |
| 11 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering. All work upto plinth level with: 1:3:6 Mix (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) including carriage of ingrediants (mechanical / manual). Complete Job | 25.73 | M³ | 5,733.6 | ₹1,47,525.53 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.39 MB
BOQ_1051813.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .