Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | H-1₹5.9 CrAccepted-Finance | ₹5.9 Cr | H-1 | Accepted-Finance H-1 |
| 2 | H-2₹18.7 Cr+₹12.9 Cr (219.5%)Rejected-Finance 115 116 GANESH NAGAR HOSHANGABAD ROAD BHOPAL M P 462026 IN | BHOPAL | BHOPAL | MADHYA PRADESH | 462026 | ₹18.7 Cr+₹12.9 Cr (219.5%) | H-2 | Rejected-Finance H-2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical Technically Non-responsive |
| 4 | Rejected-Technical | - | - | Rejected-Technical Technically Non-responsive |
Tender Value
Refer Docs
EMD Value
₹2 L
Closing Date
14 Apr 2025, 3:00 pmClosed
GM Technical
1st and 2nd Floor, Tower A, World Trade Center, Nauroji Nagar-New Delhi-29
Consultancy Services of Authority Engineer for Improvement Construction To 2-Lane with Paved Shoulder of old NH-40 new NH-206 from Km 37.550 to Km 45.760 Design Km 0.000 to Km 7.760, Package-III Pynursla Bypass on EPC mode
2025_NHIDC_853302_1
NHIDCL/Megh./S-D (Pkg-III)/Pynursla Bypass/AE/2025
Open Tender
Consultancy
Item Rate
4749 days
Shillong
As per Tender Document
5 documents required · 5 mandatory
₹5,900
MD, NHIDCL
₹2 L
NHIDCL HQ, New Delhi
15 Jul 2025
13 Mar 2025
15 Apr 2025
13 Mar 2025
14 Apr 2025
5 Apr 2025
13 Mar 2025 - 28 Mar 2025
28 Mar 2025
Amount
Professional Staff
Team Leader Cum Senior Highway Engineer 1 No.
Resident cum Highway Engineer 1 No.
Bridge/Structural Engineer 1 No.
Senior Pavement Specialist 1 No.
Senior Quality Cum Material Expert 1 No.
Road Safety Expert 1 No.
Sub Professional Staff
Survey Engineer, 1 Nos.
Assistant Highway Engineer, 1 Nos.
Assistant Bridge Engineer, 1 Nos.
Assistant Quality cum Material Engineer, 1 Nos.
Quantity Surveyor, 1 Nos.
Support Staff inclusive of per DIEM allowance
Office Manager (1 No)
Accountant Cum Cashier (1 No)
Steno cum Computer operator (1 No)
Office Boy (1 No)
Transportation : The vehicles provided by the Consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc. for all complete approx. 3000km/month run
Scorpio or equivalent vehicle (not more than 3 years old) (1 nos during Construction Period .)
Bolero or equivalent 4x4 vehicle (not more than 3 years old) (2 nos during Construction Period and 1 nos during Maintenance Period.)
Duty Travel to Site(Fixed Costs): Professional and Sub-Professional Staff. The employer may require the key personnel to visit the Employer's Site Offices/Regional Office. The quoted amount against remuneration should include travel fare for 30 round trip to Employer's Head Office and 30 round trip to Employer's regional office. (including Hotel Charges, travel costs etc. complete)
Office Rent (Fixed Costs) The rent cost includes electricity and water charges, maintenance, cleaning, repairs, etc.
One Office of Minimum 200 sqm area shall be rented at one location in midway of project during Construction Period
Office Supplies, Utilities and Communication (Fixed Costs): e.g. Office Supplies, Drafting Supplies, Computer Running Costs, Domestic and International Communication etc.
During Construction Period
During Maintenance Period
Office Furniture and Equipment (Rental) : The cost shall include rental charges towards all such furniture and equipment as required for proper functioning of office. Office furniture shall include executive tables, chairs, visitor chairs, steel almirahs, computer furniture, conference table etc. Office equipment shall include as a minimum of telephone (2 external & 10 internal lines), photocopier (15ppm, 12000 copies per month with A3 & A4 input), PCs (8 No., Intel Core i3, 19’’ colour TFT, Cache-6MB, RAM-2 GB, HDD-250 GB, DVD Writer, Key board, optical scroll mouse, MS- Windows 8/10, pre-loaded anti-virus etc.), laser/colour printers (3 no., 14 ppm, 266 MHZ, 5000 pages per month, 600x600 dpi or better etc.), Engineering Plan printer (1 no.), binding machine (1 no.), plotter A0 size, overhead projector, AC (4 no., 1.5 Ton), Water Coolers (as required)etc.
During Construction Period
During Maintenance Period
Reports and Document Printing
Monthly reports
Half yearly Reports
Various other reports as provided in the Concession Agreement such as Completion Report
Cost towards Road Survey Equipment (Network Survey Vehicle/Falling Weight Deflectometer/Mobile Bridge Inspection Unit/Retro Reflectometer) including all required manpower, software & report processing etc.
Surface defects detection and roughness measurement using Network Survey Vehicle (7.76 kms x 8 times)
Pavement strength measurement using FWD (7.76 kms x 4 times)
Bridge inspection using Mobile Bridge Inspection Unit (7.76 kms x 8 times)
Road signs inspection using Retro Reflectometer (7.76 kms x 8 times)
Contigencies A fixed amount of Indian Rupees Ten Lakh (Rs 10,00,000/-) shall be included in the Financial Proposal
Manglam Infra & Engineering Limited (BID ID -3200806)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .