| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1st₹28.1 LAccepted-AOC | 1st | Accepted-AOC Lowest | |
| 2 | 2nd₹34.8 L+₹6.7 L (23.9%)Rejected-Finance | 2nd | Rejected-Finance Not Qualify | |
| 3 | Rejected-Technical | - | Rejected-Technical Unqualified | |
| 4 | Rejected-Technical | - | Rejected-Technical Unqualified |
Tender Value
Refer Docs
Closing Date
23 Aug 2021, 5:00 pmClosed
Executive Engineer
Executive Engineer, Mechanical Division UPJN, Haldwani
Construction of 01 No200 mm dia 150 mtr deep Tubewell and SITC of Submersible pumping plant for Ganeshpur Solar Peyjal Yojna in Vikaskhand Jaspur
2021_MDPEY_35341_1
1722 / E-Tender / 36 Dated 09-08-2021
Open Tender
Pumps/Motors
Item Rate
120 days
Jaspur
Please refer tender documents
3 documents required · 3 mandatory
₹2,950
Executive Engineer, Mechanical Division UPJN
Exempted
Haldwani
27 Sept 2023
13 Aug 2021
25 Aug 2021
13 Aug 2021
23 Aug 2021
17 Aug 2021
16 Aug 2021
Amount
Construction of Tube well by Heavy Duty DC Rig Machine in the strata of soft clay and sand rash Tarai area from G.L to 150.00MBGL to lower the assembly of 200mm dia to get sand free minimum yield of 313 lpm at 4.5 mt depression complete as per following work at site
Drilling Work
Transportation of Rig machine, Air compressor O.P. unit, T & P and other equipments up to site & back transportation after completion of work.
Installation of Rig machine, Camp equipage after site clearance.
Drilling 450mm dia size final bore from G.L. to 150.00 MBGL Including arrangemt of water, Geophysical logging of bore well & collection of strata sample at site.
Dismantling of Rig machine after completion of work. Fitting of girder, clamp and well cap with site clearance
Preparing and Lowering of tube well assembly starting from GL to 150 MBGL including cutting wellding as requried at site complete with all T & P required
Supply & lowering of Tubewell assembly.
200mm dia 7.9mm thick M.S.E.R.W. plain pipe.
200mm dia 7.9mm thick M.S.E.R.W. Slotted pipe.
200x100mm dia size M.S Girder 4Mt. Long for T.W. assembly.
200mm dia Bail plug with hook.
M.S. heavy duty D.E clamp suitable for 200mm dia.
200mm dia well cap.
Supply and shrouding of Pea-Gravel ( 2mm to 3mm) upto 150Mt.MBGL
Development by air compressor.
Development of tubewell by air compressor of suitable capacity including, transportation, installation, dismentling of compressor from site after completion of work with all T & P etc complete.
Development by O.P. unit
Development, yeild test of tubewell by operation the pumping set continuously for a desired time period and measuring the discharge and drawdown of tubewell at a suitable time interval as per the direction of engineer in charge including cost of energry
Geohydrologgical survey of site
Chemical & Bacteriological Test of water
S.I.T.C. of Solar Submersible Pumping Plant with Accessories for Tubewell
Supply of 7.5HP solar submersible AC/DC pump to deliver 250LPM water at 60Mtr head, complete with 1.0meter cable complete in all respects.
Supply of Spare pump of same duty cycle
Supply of solar pump controller (Control panel cum starter) suitable for above motor as per following parameters
Inbuilt MPPT Tracking facility ensuring overload under over voltage protection force air time of lack of radiation
Parameter display facilities
Auto reset after every fault
Dry running protection to avoid dry run of motor
Solar photo voltage poly crystalline solar module 7500wt. As per IEC standrard (for above pump)
Supply of main piping & valves comprising of the following
80mm dia MS Coloumn Pipe (20Nos x3Mt.=60Mt.)
80mm dia CI D/F Sluice valve PN-1, 2 Nos.
80mm dia CI D/F Reflux valve PN-1,1 No.
80mm dia bend90 - 1 No.
80x80x80mm dia Tee A/F-1 No.
MS Clamp-1 Set
Gauge with fitting -1 Set
Tools
Construction RCC Foundation with suitable foundation Nut, Bolts and Supply & fitting of G.I. Solar Panel mounting structure including panel mounting clamp, pole etc complete in all respect.
Installation, commissioning and setting to work and testing of entire equipment installed at site including supply of necessary fixing accessories like insulation, teflon tape etc.
Cartage upto site of work including loading and unlodading
10sq.mm x 3 core copper flexible cable
Chain Pulley block of 2 tonne capacity 4Mt. Lift spur gear tested on 2 ton load
Rubber insulation sheet 1 Mt. x 2Mt.
Safety kit with lightening arrestor, GI/Copper strip, earth kit etc.
Internal & external Electrification of Pump house.
1 Month trial running and 5 months maintenance including watch & ward
shyam engineers
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .