Loading…
Loading…
Tender Value
₹3.9 Cr
EMD Value
₹2.5 L
Closing Date
30 May 2026, 4:00 pmClosed
Superintending Engineer, GETCO, CO, Mehsana
Bi-Annual Contract for Laying, installation, Testing & Commissioning of OPGW Cable and accessories/ Approach cable installed by GETCO for various line above 66kV Voltage Class under Mehsana Zone
299903
MTC/032026/n-17 (Re-Invitation)
Open
Electrical
Works
Mehsana
18 documents required · 18 mandatory
₹8,850
SE (TR), GETCO, CO, Mehsana
₹2.5 L
30 Apr 2026
30 Apr 2026
30 Apr 2026
30 May 2026
30 Apr 2026
4 Estimated Cost including GST Rs. 3,88,47,252/-
6 Time period 24 Months
On line (E-tendering) tender/ offer
7 submission last date up to 16.00 hours Dt. 30.05.2026
Date of opening of Tender fee, EMD
and QR on – line bid at 16.00 Hours.
9 Date of opening of Price Bids Shall be intimated separately.
10 Prices Firm basis
11 Bid Validity 180 Days
12 Type of Tender Percentage Basis on FIRM PRICE
Date: Seal & Signature of Tenderer
1. All the relevant documents including tender copy to be submitted though ONLINE
only. No physical documents to be submitted by bidder.
2. All the online Annexures to be filled properly and notarized/ self-attested copies of
original documents as per tender requirement must be attach with online form only.
It shall be sole responsibility of the bidder that the uploaded scanned documents (in
PDF form) remain legible (readable) and should not be password protected.
3. Tender will be evaluated on Data/ Details/ Documents of the on-line submission. For
any discrepancy between online & Submitted documents, Online offer is considered
as final. This is intended for transparency and speedy evaluation of the bids.
4. Instead of simply confirming / attached in bid / refer physical offer, the Bidder shall
fill in the particulars against appropriate place in respect of each line appearing in
each online annexure. Wherever required, bidder shall invariably have to upload
supporting authentic documents in the online bid. (In the absence of required details
in the online annexure, the purchaser has every right to evaluate the bids
accordingly and bidder cannot raise any objection against any point during
5. Bidder has to submit Tender Fee & EMD through online payment methods only.
Copy of payment to be attached with online bid documents.
6. Payment of Tender Fee & EMD (Earnest Money Deposit):
Payment option for submission of Tender fees & EMD should be Online i.e. by
RTGS/NEFT only.
GETCO, Mehsana Beneficiary Bank detail for online payment are as under:
Sr. Particulars Requisite Details
1 Name of Bank Bank of Baroda
2 Name of Branch Mehsana Main
3 Branch Code MEHSAN
5 IFSC Code BARB0MEHSAN (5th Digit- Zero)
6 Name of A/c Gujarat Energy Transmission Corporation Limited
8 GST No. 24AABCG4029R2ZC
After payment through RTGS/NEFT, Bidder has to provide following details by e-
mail on the same date of payment so payment receipt can be generated. Mail should
on below mail addresses with contains details:
Sr. Required Details
1 Name & Address of the bidder
2 Bidder GST No
3 Tender No with due date
4 Mode of Transfer
5 Ref. ID with Bank Details
7 Payment against (Tender Fee / EMD)
Mail to: [email protected]
Copy to: [email protected]
7. Bidders are requested to remain in touch with the web-site for any amendment /
corrigendum or extension of due date etc.
Date: Seal & Signature of Tenderer
8. No physical tender shall be accepted / opened. Online bid receipt after due time of
tender or any other reasons and the Corporation shall not assume any responsibility
for late receipt.
9. The GETCO reserves the right to award the work to one or more bidders,
considering their technical and financial capacity OR to reject any or all tenders or
accept any tender without assigning any reason thereof.
Any technical questions, information and clarifications that may be required
pertaining to this enquiry should be referred to:
The Superintending Engineer,
Gujarat Energy Transmission Corporation Limited,
Circle Office, Visnagar road, Mehsana, - 384
Yours faithfully,
Superintending Engineer
GETCO, Mehsana.
Download Tender Documents in (PDF Format) as per list of files & drawings:
To view the PDF file please use “Acrobat Reader” software which can be downloaded
from “Adobe” website. Note:
In case bidder needs any assistance in accessing / submission of on line bid /
clarification or if training required for participating in online tender, they can contact the
following office:
(n) Procure Cell, (n) code solutions-A division of GNFC Ltd.,
403, GNFC Info tower, S.G. Road,
Bodakdev Ahmedabad – 380054 (Gujarat),
Email : [email protected]
Date: Seal & Signature of Tenderer
GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED
Tender No: - MTC/032026/n-17
Sub: Bi-Annual Contract for Laying, installation, Testing & Commissioning of OPGW
Cable and accessories/ Approach cable installed by GETCO for various line above
66kV Voltage Class under Mehsana Zone.
To create environment where Business Confidence is built through Best Business
Practices and is fostered in an atmosphere of trust and respect between providers of
goods and services and their users for the ultimate benefit of society and the nation.
GETCO COMMITMENT PARTY’S COMMITMENT
o To maintain the highest ethical standards in o Not to bring pressure /
business and profession. recommendations outside GETCO
to influence its decision.
o Ensure maximum transparency to the o Not to use intimidation, threat,
Satisfaction of stakeholders inducement or Pressure of any kind
on GETCO or any of it’s employees
under any circumstances.
o To ensure to fulfill the terms of o To be prompt and reasonable in
agreement / contract and to fulfilling the contract, agreement,
consider objectively the viewpoint legal obligations.
o To ensure regular and timely release o To provide goods and / or services
of payment on due dates for work timely as per agreed quality and
done. specifications at minimum cost to
o To ensure that no improper demand o To abide by the general discipline to
is made by employees or by anyone be maintained in our dealings.
o To give maximum possible o To be true and honest in furnishing
assistance to all the Vendors / information including payment to
Suppliers / Service provider and agents / sub-agents.
others to enable them to complete the
contract in time.
o To provide all information to o Not to divulge any information,
suppliers/ contractors relating to business details available during the
contract / Job which facilitate him to course of business relationship to
complete the contract / job others without the written consent of
successfully in time. GETCO.
o To ensure minimum hurdles to o Not to enter into carter / syndicate /
Vendors/ suppliers / contractors’ in understanding whether formal /
completion of agreement / contract / non formal so as to influence the price.
Seal & Signature Seal & Signature
(GETCO Authorized Signatory) (Party’s Authorized Person)
Date: Seal & Signature of Tenderer
QUALIFICATION REQUIREMENT
Technical Qualification Criteria:
1. Registration: The bidder shall be registered contractor of GETCO.
The bidder must have successfully completed similar OPGW / FOAC works in any
State Transmission Utility / Central Utility / PSU / Telecom Govt. Agency during the last 5 years.
The bidder shall meet the following minimum criteria:
2.1 OPGW Stringing Experience
The bidder should have successfully executed minimum of the one the following during the
The Bidder shall have erected at least 100kM route length OPGW (Live Line installation)
or 100kM of hot-line E/W replacement during last 5 years with Transmission Utility or major
industries on lines of 110kV and above.
Executed the works cumulatively totaling 100 km OPGW stringing on 132 kV or above.
Experience must be in a Government Utility / PSU / Central Transmission Utility / State
Transmission Utility / Telecom PSU.
2.2 OPGW / FOAC Jointing & Testing Experience
Bidder must have completed in the last 5 years:
• Minimum 25 Nos. OPGW Joint Box installation (24F/48F)
• Minimum 150 Nos. OPGW/FOAC splicing
• OTDR testing for minimum 150 km link length
All work should include:
• Bi-directional OTDR test
• Power meter test
• As-built documentation
3. Electrical Contractor’s License- Electrical contractor’s license with latest validation.
4. All the Equipment’s / Materials proposed to be supplied shall have valid type test certificates
from accredited laboratory (accredited by the National accreditation body of the country
where laboratory is located) as per IS / IEC / ANSI / IEEE and technical specification not
older than 5 years & must be valid till the expiry of validity of offer
Financial Qualification Criteria:
• Payment of Tender Fee & EMD (Through RTGS/NEFT i.e Online only, No DD allowed)
• GST Registration
• PAN Registration
• PF Registration
• Bank Solvency- 20% of Tender Estimate amount & not older than 12 Months.
• Minimum Average Annual Turnover (MAAT)- CA Certificate of average for best three
individual years out of last five financial years shall not be less than of estimated cost of this
• Last quarter’s Liquid Assets- CA Certificate of liquid Asset should not be less than 20 % of
estimated amount as on invitation of tender.
Note: - For the purpose of arriving at LA, Current Assets Less Inventories shall be considered.
• Bidder’s Net worth for last 3 financial years should be positive.
• The Bidders Should not have been refereed to NCLT under Insolvency & Bankruptcy
Code (IRP has been appointed or liquidation proceeding have been initiated under IBC).
Date: Seal & Signature of Tenderer
GUJARAT ENERGY TRANSMISSION
CORPORATION LTD
TRANSMISSION CIRCLE OFFICE,
Tender No: MTC/032026/n-17
(Re-Invitation)
Bi-Annual Contract for Laying, installation, Testing & Commissioning of OPGW
Cable and accessories/ Approach cable installed by GETCO for various line above
66kV Voltage Class under Mehsana Zone.
SUBMIT THROUGH n-code only.
Date: Seal & Signature of Tenderer
Unit Rate Total Amount
Unit Rate Total Amount
Sr. Description (Erection Portion) Unit Qty
A Replacement of OPGW (24F/48F) with rectification Charges
Complete installation and rearrangement of OPGW cable (24F/48F fibers) under offline conditions, as
per the following detailed activities:
1. Installation Scope:
o Complete laying of new OPGW cable (24F/48F fibers).
o Rearrangement of existing laid OPGW (24F/48F) as per site requirement.
o Pre-laying OTDR testing of the OPGW cable.
o installation of all required hardware and accessories.
o Required splicing of optical fibers.
o Post-installation testing of both newly laid and rearranged OPGW sections.
2. Testing & Instruments:
o End-to-end link testing using:
§ OTDR (Optical Time Domain Reflectometer)
§ LSPM (Laser Source Power Meter)
o All testing instruments including OTDR, LSPM, and splicing machine must be of reputed make and must
have valid and updated calibration certificates, where ever applicable.
3. Material Handling:
o OPGW cable shall be provided free of cost by GETCO.
o OPGW cable shall be provide from the designated GETCO store to site by GETCO.
o After completion of work, the balance OPGW cable must be returned and credited back to the GETCO
store by GETCO Engineer-in-Charge (EIC).
4. Logistics & Manpower:
o The agency shall arrange sufficient manpower, tools & tackles, and vehicle(s) at site to execute the work
in a safe and timely manner.
5. Minimum Payment Condition:
o In case the executed length is up to 500 meters, payment for minimum 500 meters shall be made by
GETCO considering fixed job requirements as per approved unit rate of 500 meter.
o For execution beyond 500 meters, payment shall be made on actual executed length as per approved
Complete installation and rearrangement of OPGW cable (24F/48F fibers) under live line condition , as
per the following detailed activities:
1. Installation Scope:
2 o Complete laying of new OPGW cable (24F/48F fibers). Km 12 1,45,000.00
o Rearrangement of existing laid OPGW (24F/48F) as per site requirement.
o Pre-laying OTDR testing of the OPGW cable.
o installation of all required hardware and accessories.
Date: Seal & Signature of Tenderer
o Required splicing of optical fibers.
o Post-installation testing of both newly laid and rearranged OPGW sections.
2. Testing & Instruments:
o End-to-end link testing using:
§ OTDR (Optical Time Domain Reflectometer)
§ LSPM (Laser Source Power Meter)
o All testing instruments including OTDR, LSPM, and splicing machine must be of reputed make and must
have valid and updated calibration certificates, where ever applicable.
3. Material Handling:
o OPGW cable shall be provided free of cost by GETCO.
o OPGW cable shall be provide from the designated GETCO store to site by GETCO.
o After completion of work, the balance OPGW cable must be returned and credited back to the GETCO
store by GETCO Engineer-in-Charge (EIC).
4. Logistics & Manpower:
o The agency shall arrange sufficient manpower, tools & tackles, and vehicle(s) at site to execute the work
in a safe and timely manner.
5. Minimum Payment Condition:
o In case the executed length is up to 500 meters, payment for minimum 500 meters shall be made by
GETCO considering fixed job requirements as per approved unit rate of 500 meter.
o For execution beyond 500 meters, payment shall be made on actual executed length as per approved
B Other AMC Activities with Mobilization/rectification Charges -
Replacement/installation of Fibre Optic Approach Cable in existing cable trench using HDPE pipe,
with associated testing, fittings, and manpower arrangement as detailed below:
1. Installation Scope:
o Replacement or laying of Fibre Optic Approach Cable in existing cable trench through HDPE pipe.
o Pre- and post-laying OTDR testing of the approach cable.
o installation of all required fittings and hardware.
o Splicing of optical fibers as required.
2. Testing & Equipment:
o End-to-end testing of the link using:
§ OTDR (Optical Time Domain Reflectometer)
§ LSPM (Laser Source Power Meter)
o All instruments used for OTDR, LSPM, and splicing must be of reputed make and must carry valid,
updated calibration certificates, where ever applicable.
3. Material Handling:
o FOAC cable shall be provided free of cost by GETCO.
o FOAC cable shall be provide from the designated GETCO store to site by GETCO
Date: Seal & Signature of Tenderer
o After completion of work, the balance FOAC cable must be returned and credited back to the GETCO
store by GETCO Engineer-in-Charge (EIC).
4. Manpower & Logistics:
o The agency shall deploy sufficient skilled manpower, tools & tackles, and vehicle(s) at site to complete
the work efficiently and in accordance with safety protocols.
Replacement/Installation of Approach Cable in HDPE Duct through HDD, with associated testing,
fittings, and manpower arrangement as detailed below:
1. Cable Laying & Installation:
o Replacement or installation of fibre optic approach cable in existing HDPE duct through Horizontal
Directional Drilling (HDD) method.
o Execution of minor civil works, including construction of RCC cable chambers with RCC cover as
o All required fittings/accessories for cable termination/splicing shall be install by the agency.
2. Testing & Equipment:
o End-to-end testing of the link using:
1. OTDR (Optical Time Domain Reflectometer)
2. LSPM (Laser Source Power Meter)
o All instruments used for OTDR, LSPM, and splicing must be of reputed make and must carry valid,
updated calibration certificates, where ever applicable.
3. Material Handling:
o FOAC cable shall be provide free of cost by GETCO.
o FOAC cable shall be provide from the designated GETCO store to site by GETCO
o After completion of work, the balance FOAC cable must be returned and credited back to the GETCO
store by GETCO Engineer-in-Charge (EIC).
4. Manpower & Logistics:
o The agency shall deploy sufficient skilled manpower, tools & tackles, and vehicle(s) at site to complete
the work efficiently and in accordance with safety protocols.
Replacement/Installation of Fibre Optic Approach Cable in HDPE Duct through Manual
Excavation.The scope of work shall include the following activities:1. Excavation & Civil Works:o
Manual excavation and backfilling for laying of HDPE duct.o Laying of GI pipe at road crossings.o
Execution of minor civil works, including construction of RCC cable chambers with RCC cover as
required.2. Cable Laying & Installation:o Replacement/installation of fibre optic approach cable through
3 the HDPE duct.o Proper alignment, pulling, and protection of the cable along the entire route.o All km 8 2,10,000.00
required fittings/accessories for cable termination/splicing shall be installed by the agency.3. Splicing &
Testing:o Required splicing of optical fibres at appropriate locations.o OTDR Testing shall be carried out
before and after the cable laying.o End-to-End Testing of the optical link using OTDR and LSPM (Laser
Source Power Meter).o All testing instruments (OTDR, LSPM, and Splicing Machine) shall be of reputed
make and must possess valid calibration certificates, , where ever applicable.4. Cable Supply &
Date: Seal & Signature of Tenderer
Handling:o The approach cable will be provided free of cost by GETCO.o FOAC cable shall be provide
from the designated GETCO store to site by GETCOo After completion of work, the balance FOAC cable
must be returned and credited back to the GETCO store by GETCO Engineer-in-Charge (EIC).
OTDR Analysis / Link Testing on Newly Commissioned or Existing Fibre Optic Links.
The scope shall include:
1. Testing Activities:
o End-to-End Testing of newly commissioned or existing optical fibre links.
o Testing to be conducted using:
§ OTDR (Optical Time Domain Reflectometer)
§ LSPM (Laser Source Power Meter)
§ Optical Power Meter
4 o Testing is to be carried out to verify fibre continuity, splice loss, attenuation, and overall link integrity. If 16 1,15,000.00
any abnormality observed than rectification work will be do.( i.e. Re splicing, replacement of
OPGW/FOAC, Joint box etc)
o OTDR Testing under Preventive Maintenance scope is excluded.
3. Equipment Standards:
o All test equipment, including OTDR, LSPM, and Splicing Machine, must be of reputed make, where ever
o Equipment must carry a valid and updated calibration certificate at the time of testing.
Unit Rate Total Amount
Unit Rate Total Amount
Sr. Description (Supply Portion) Unit Qty
Hardware set & accessories for OPGW @ A & B. above, i.e. all cable fittings & accessories like
C suspension clamps, tension clamps, vibration dampers, earthing clamps, down lead clamps, in-
line splice enclosures etc. including; Pigtails FC-PC type (Supply Part)
1 Single Suspension Assembly No. 120 3,850.00
2 Single tension assembly for dead end location No. 80 3,270.00
3 Double tension assembly for joint box location No. 80 6,900.00
4 Double tension assembly for pass through location No. 80 6,900.00
5 Vibration damper with protection rods No. 80 780.00
6 Joint Box (3Way, 48 Nos of splicing) No. 80 8,500.00
7 Down lead clamp No. 300 470.00
8 Surplus cable support No. 80 3,230.00
9 Double tension assembly for Suspension location (used only after getting approval from GETCO) No. 60 7,200.00
10 HDPE pipe as per GETCO specification km 10 1,40,000.00
11 HDPE pipe fittings No. 300 25,000.00
12 FOAC cable joint box RCC chamber with cover as per GETCO specification No. 20 6,000.00
Date: Seal & Signature of Tenderer
Total (A + B) Rs.
Grand Total (Rs.)
Grand Total (Rs.)
Date: Seal & Signature of Tenderer
Date: Seal & Signature of Tenderer
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1. Tender Notice QR and Price-Bid (Re-Invitation).pdf
2. Scope of Work and Specification_Mehsana.pdf
3. Annexure- A OPGW Link Lines under Mehsana Zone.pdf
4. Tender AMC OPGW- GCC- ECC and SCC.pdf
5. Approved Drawings for 220kV.pdf
6. Approved Drawings for 400kV.pdf
7. 24F OPGW SPEC R5 07.08.2014.pdf
8. 48F OPGW SPEC R0 07.08.2014.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .