Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Rejected-Technical 102 JASMINE PLOT N0 15 SECTOR 44 SEAWOODS WEST 400706 THANE MAHARASHTRA 400706 | THANE | MAHARASHTRA | 400706 | Rejected-Technical Proof of experience submitted is not in line with pre-qualification criteria of the tender |
| 4 | Rejected-Technical | Rejected-Technical Proof of experience submitted is not in line with pre-qualification criteria of the tender |
Tender Value
Refer Docs
Closing Date
10 Oct 2022, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
VINURAJ PS
Manager (Mechanical) Cochin Shipyard Ltd. Kochi-682015 Kerala, India
Overhauling of Main Engine for the vessel Vishwa Vikas
2022_CSL_130584_1
SR9/717A32183/GePNIC/012
Open Tender
Machineries/ Mechanical Engg Items
Works
20 days
KOCHI
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
Exempted
13 Dec 2022
29 Sept 2022
11 Oct 2022
29 Sept 2022
10 Oct 2022
29 Sept 2022
29 Sept 2022 - 6 Oct 2022
Amount
E21011 ITEM : MAIN ENGINE TYPE / CAPACITY / DETAILS : MAN B & W 6S50MC-C8 TIER II POWER= 9480 KW @ 127 RPM. MAIN ENGINE UNIT DECARBONISATION TO BE CARRIED OUT AS PER FOLLOWING JOB SCOPE. ALL WORK TO BE CARRIED OUT STRICTLY AS PER THE MAKER’S MAINTENANCE INSTRUCTIONS TAKING ALL SAFETY PRECAUTIONS. ALL NECESSARY PARTS TO BE SHOWN TO SURVEYORS FOR THEIR APPROVAL.-6NOS
ISOLATE ALL SIX UNITS DRAIN COOLING WATER FUEL OIL ETC. REMOVE ALL NECESSARY CYLINDER HEAD CONNECTIONS REMOVE CYLINDER HEADS WITH EXHAUST VALVES AND TRANSPORT SAME TO YARD WORKSHOP.
DISCONNECT AND REMOVE ALL CYLINDER HEAD MOUNTINGS AND OVERHAUL. DISMANTLE CYLINDER HEADS AND SEPARATE THEM FROM COOLING JACKETS. THROUGHLY CLEAN CYLINDER HEADS AND COOLING JACKET SURFACES. RENEW ALL “O”RINGS AND ASSEMBLE CYLINDER HEADS AND COOLING JACKETS. CYLINDER HEAD COOLING SURFACES TO BE PRESSURE TESTED TO 06 KGS / CM2 AND SHOWN TO 2EO & CEO. ALL CYLINDER HEAD MOUNTINGS POCKETS AND SEATS TO BE THOROUGHLY CLEANED AND SEATS TO BE LAPPED/MACHINED. FUEL VALVE NOZZLE AREA TO BE CHECKED FOR CORROSION ATTACK AND IF SAME EXCEEDS DEPTH OF 8MMS THEN RECONDITIONING TO BE DONE AS PER MAKER’S INSTRUCTIONS. CYLINDER AIR STARTING V/VS RELIEF V/VS FUEL V/VS AND INDICATOR VALVES TO BE O’HAULED AND TESTED TO PROVE SATISFACTORY OPERATION AND SHOWN TO 2EO / CEO. CYLINDER HEAD RELIEF V/VS TO BE PRESSURE TESTED TO CORRECT OPENING PRESSURE & SHOWN TO 2E/O & CEO. INDICATOR V/VS LEAK TEST TO BE SHOWN TO 2EO/ CEO. AFTER THE APPROVAL OF SURVEYORS & SUPTD ALL THE MOUNTINGS TO BE ASSEMBLED & FITTED BACK IN PLACE AS THE ORIGINAL.
DISMANTLE THE EXHAUST V/VS COMPLETELY AND OVERHAUL. THOROUGHLY CLEAN ALL PARTS & SHOW TO SURVEYORS &SUPTD. RENEW ALL WORN / DEFECTIVE PARTS AS REQUIRED & ALL SEAL RINGS FROM SHIP’S SPARES. CHECK THE VALVE & SEATS & IF REQUIRED GROUND THE VALVES & SEATS AS PER MAKER’S INSTRUCTIONS. THOROUGHLY CLEAN EXHAUST V/VS COOLING WATER SURFACES. ASSEMBLE THE EXHAUST VALVES AS THE ORIGINAL AND FIT THE EXHAUST VALVES IN PLACE ON CYLINDER HEADS. ALL CYLINDER HEAD ASSSEMBLIES TO BE TRANSPORTED BACK ONBOARD.
ALL LINER SURFACES & SCAVENGE PORTS TO BE THROUGHLY CLEANED. L.O.QUILL PASSAGES TO BE THROUGHLY BLOWN THROUGH WITH COMPRESSED AIR & CLEARED. LINERS TO BE CALIBRATED AND READINGS TO BE RECORDED. CARRY OUT DYE CHECK ON ALL CYLINDER LINERS IN WAY OF TOP AND BOTTOM L.O.GROOVES FOR DETECTING CRACKS IF ANY & SHOWN TO SURVEYORS & SUPDT. LINER PORT EDGES TO BE SMOOTHENED IF REQUIRED.
PISTON HOLDING NUTS TO BE OPENED. LINER TOP RIDGES TO CLEAN AND GRIND. PISTON TO BE WITHDRAWN ALONG WITH STUFFING BOXES AND SHIFTED/TRANSPORTED TO SHOP. PISTON RINGS & STUFFING BOX TO BE REMOVED. STUFFING BOX TO BE DISMANTLED OVERHAULED CLEANED INSPECTED AND ASSEMBLED WITH NEW SPARE SHIP SUPPLY. CHECK THE PISTON CROWN WEAR DOWN BY WEARDOWN GAUGE. PISTON RING GROOVES TO BE THOROUGHLY CLEANED. GROOVES & PISTON RINGS TO BE CALIBRATED & READINGS TO BE RECORDED. ALL PARTS TO BE PRESENTED TO SURVEYORS & SUPTD. AFTER THEIR APPROVAL ASSEMBLE ALL PISTONS AS PER MAKER’S INSTRUCTIONS. ALL PISTONS TO BE PRESSURE TESTED WITH OIL TO 10 BARS IN PRESENCE OF SURVEYORS & SUPTD/CEO. PISTON ROD TO BE GAUGED. PISTONS TO BE ASSEMBLED WITH NEW PISTON RINGS. PISTON ROD STUFFING BOX ALL PARTS TO BE THOROUGHLY CLEANED. STUFFING BOX CALIBRATIONS TO CHECK AND RECORD THE READINGS. ALL WORNOUT / DAMAGED PARTS TO BE RENEWED FROM SHIP’S SPARES. STUFFING BOXES TO BE ASSEMBLED ON PISTON RODS USING NEW SEAL RINGS SCRAPER RINGS & SPRINGS. PISTON RODS ALONG WITH STUFFING BOXES TO BE TRANSPORTED BACK ONBOARD. IF ANY PART IS WORN OUT BEYOND LIMIT SAME TO BE REPLACED WITH NEW SPARES OR RECONDITIONED AS PER OEM PROCEDURE.
CROSS HEAD SURFACES TO BE CLEANED THOROUGHLY. LOWER THE PISTONS IN PLACE ALONG WITH THE STUFFING BOXES AND TIGHTEN THE NUTS AS PER MAKER’S INSTRUCTIONS.STUFFING BOX BOLTS TO BE TIGHTENED. ALL LASHINGS / LOCKINGS TO BE RESTORED. LOWER THE CYLINDER HEADS ALONG WITH EXHAUST V/VS AND TIGHTEN THE NUTS. ALL CYLINDER HEAD CONNECTIONS TO BE RESTORED BACK AS THE ORIGINAL. C.W. TO BE TRIED OUT AND ENSURE NO LEAKAGES. F.O. & L.O. TO BE TRIED OUT. F.O.LINES TO BE PRIMED. ALL LAGGINGS TO BE FIT BACK TO ITS ORIGINAL POSITION AND SECURE.
C / CASE TO BE THOROUGHLY CLEANED & INSPECTED. C/CASE DOORS TO BE BOXED BACK AS THE ORIGINAL. Nos 6
E21011.10 SATISFACTORY MAIN ENGINE RUNNING TRIAL (BASIN TRIALS) 3 HRS TO BE GIVEN. MAIN ENGINE SEA TRIALS FOR ABOUT 4-6 HOURS ALSO TO BE GIVEN.
DISMANTLE PISTON ALL PARTS TO BE THOROUGHLY CLEANED AND EXAMINED. D.P.TESTS TO BE CARRIED OUT ON PISTON CROWNS AND PISTON SKIRTS AND CHECKED FOR FRETTING AND CRACKS AS PER MAKER’S INSTRUCTIONS. ALL PARTS TO BE PRESENTED TO SURVEYORS & SUPTD . AFTER THEIR APPROVAL ASSEMBLE ALL PISTONS AS PER MAKER’S INSTRUCTIONS. ALL PISTONS TO BE PRESSURE TESTED WITH OIL TO 10 BARS IN PRESENCE OF SURVEYORS & SUPTD.
SCAVENGE RELEIF DEVICES CRANKCASE DOORS AND RELIEF DEVICES TO OVERHAUL AND TO BE SHOWN TO THE CLASS SURVEYOR
HYDRAULIC ACTUATOR FOR EXH VALVES TO BE OVERHAULED. HOUSING AND PISTON TO BE LIFTED (PISTON TO BE RELEASED FROM BAYONET LOCK BY DISMANTLING LOCKING PLATE AND TURNING BY 90 DEG.). PARTS TO BE DISMANTLED INSPECTED AND SHOWN TO SURVEYOR.OIL CYLINDER LINER TO CALIBRATE.SAFETY V/VS AND NON RETURN V/VS TO BE OVERHAULED.AFTER SURVEY ACTUATOR TO BOXED BACK WITH NEW PISTON RING AND FITTED ON ITS PLACE WITH ALL CONNECTION.
CHAIN TENSIONING TO BE CHECKED & ADJUSTED FOR VIBRATION DAMPERS AND PUT UP FOR SHOWN TO SURVEYER. UP TO SURVEYOR SATISFACTION UNDER CSM SURVEY
GRINDING OF EXHAUST VALVE SEAT AND VALVE BY GRINDING MACHINE. QUOTE PER PCS.
MACHINING OF LANDING FACES OF AIR STARTING V/VS EXHAUST V/VS FUEL V/VS ON CYLINDER HEADS
CYLINDER COVERS COMBUSTION SPACES TO CHECK FOR CRACKS WITH D.P. TEST –
QUOTE FOR RECONDITIONING OF EXHAUST VALVE SPINDLE EXHAUST VALVE SEAT AND CYLINDER HEAD AND NOS OF DAYS REQUIRE WHICH SHOULD BE REFLECTED /INCLUDED IN THE COMPLETION OF ENTIRE DD REPAIR.
QUOTE FOR LINER WITHDRAWAL OVERHAUL & REFITTING PER UNIT. IF LINER WEAR DOWN BEYOND LIMIT SAME TO BE REPLACED WITH NEW SHIP SUPPLY LINER.
E21013 ITEM: MAIN ENGINE FUEL INJECTION PUMPS TYPE / CAPACITY / DETAILS : MAN B & W 6S50MC-C8 TIER II POWER= 9480 KW @ 127 RPM FOLLOWING JOBS TO CARRY OUT. ISOLATE EMERGENCY STOP BUTTON AS LONG AS ANY WORK IS CARRIED ON FUEL PUMP BLOCKS.
ALL INLET AND OUTLET CONNECTIONS TO BE REMOVED AND FUEL P/P BLOCKS TO BE TAKEN OUT FROM PLACE TRANSPORTED TO WORKSHOP. PUMPS TO BE COMPLETELY DISMANTLED FOR INSPECTION PARTS TO BE CLEANED OVERHAULED AND MADE READY FOR SURVEY.ALL UNIT PLUNGER BARREL TO OVERHAULED AND SEALING RING TO BE RENEWED.SEALING RING IN BARREL TO BE RENEWED.
PUNCTURE VALVE AND SUCTION VALVE TO BE OVERHAULED
ALL FUEL INJECTION PUMPS TO BE PRESENTED TO CLASS SURVEYORS. AFTER COMPLETION OF SURVEY TO BOX BACK FITTED IN PLACE AS ORIGINAL. INDIVIDUAL P/P TIMING TO CHECK & ADJUST AS NECESSARY & TO BE RECORDED.
SHOCK ABSORBER TO BE CHECKED AND OVERHAULED .
PRIMING TRIAL TO BE GIVEN.WHEN PUMP IS PUT ON USE CHECK FOR ANY LEAKAGE AND ABNORMAL TEMPERATURE RISE. IF ANY DEFECT SAME TO BE RECTIFIED.
VIT GEAR TO BE CHECKED AND OVERHAUL AND ADJUSTED
FUEL CAM TO BE CHECKED AND LEAD TO BE MEASURED.
E21014 ITEM : MAIN ENGINE MAIN BEARINGS &THRUST BEARING TYPE / CAPACITY / DETAILS : MAN B & W 6S50MC-C8 TIER II POWER= 9480 KW @ 127 RPM
CHECK AND RECORD ALL MAIN BRG AND THRUST BEARING CLEARANCES BEFORE AND AFTER INSPECTION
MAIN ENGINE CRANK SHAFT DEFLECTION TO BE TAKEN BEFORE DISMANTLING AND AFTER ASSEMBLING.ALL READINGS TO BE SUBMITTED.
DISMANTLE BEARING AS PER MAKER INSTRUCTION ALL PARTS TO CLEAN AND SHOW IT TO SURVEYOR . BEARING AND JOURNAL TO BE CALIBRATED AND RECORDED . JOURNAL TO POLISH PRIOR BOXING UP DYE PNETRANT TEST TO BE CARRIED OUT FOR CHECKING ANY CRACK . AFTER SUCCESSFUL COMPLETION OF SURVEY BEARINGS TO BE BOXED BACK WITH OLD/NEW SHELL SATISFACTORY RUNNING TRIAL AND BRG TEMP TO BE MONITORED AND RECORDED DURING RUNNING TRIAL. QUOTE PER BEARING NOS OF BEARING TO BE OPENED ON OWNER DECESION. IF ANY BEARING SHELL WORN OUT BEYOND LIMIT NEW SHIP SUPPLY BEARING TO BE FITTED. QUOTE TO BE INCLUSIVE OF ALL CHARGES.
ALL AHEAD AND ASTERN THRUST BEARINGS PADS TO BE OPENED UP AS PER MANUAL AND SAME TO BE PUT UP TO SURVEYER. AFTER SURVEYOR SATISFACTION UNDER CSM SURVEY SAME TO BE BOXED BACK
E21015 ITEM : MAIN ENGINE CRANK PIN BEARINGS TYPE / CAPACITY / DETAILS : MAN B & W 6S50MC-C8 TIER II POWER= 9480 KW @ 127 RPM
CHECK AND RECORD ALL C/P BEARING CLEARANCES BEFORE AND AFTER INSPECTION.
DISMANTLE AND OVERHAUL CRANK PIN BEARING. LOWER THE BOTTOM HALVES IN THE CRANKCASE LOCK X-HEAD ON TO GUIDES SUPPORT AND SWING OUT CONNECTING RODS FOR INSPECTING UPPER BRG HALVES. CLEAN ALL PARTS AND PRESENT TO CLASS SURVEYOR. DYE PENETRANT TEST TO BE CARRIED OUT. AFTER SUCCESSFUL COMPLETION OF SURVEY BRGS TO BE BOXED BACK AS ORIGINAL. SATISFACTORY RUNNING TRIAL TO BE GIVEN DURING SEA TRIAL. BEARING TEMPERATURE TO BE MONITORED. QUOTE TO BE INCLUSIVE OF ALL CHARGES.
IF BEARING SHELL WORN OUT BEYOND PERMISSIBLE LIMIT SAME TO BE RENEWED WITH OWNER SUPPLIED BEARING
E21016 ITEM : MAIN ENGINE CROSS HEAD BEARINGS TYPE / CAPACITY / DETAILS : MAN B & W 6S50MC-C8 TIER II POWER = 9480 KW @ 127 RPM
CHECK AND RECORD ALL SIX CROSSHEAD BRGS CLEARANCES BEFORE OPENING THE XHD BEARING AND AFTER ASSEMBLY OF XHD BRGS.
DISMANTLE CROSSHEAD BEARING AS PER MAKER'S INSTRUCTION. BOTH TOP AND BOTTOM BEARING TO BE TAKEN OUT. ALL PARTS TO BE CLEANED.BOTH TOP AND BOTTOM BRG SHELLS AND CROSSHEAD PINS TO BE EXAMINED. CROSSEHAD PIN TO CALIBRATE AND READINGS TO RECORD.DYE PENETRANT TEST TO BE CARRIED OUT TO IDENTIFY ANY CRACK IF ANY. CLEAN ALL PARTS AND PRESENT TO CLASS SURVEYOR AND AFTER SUCCESSFUL COMPLETION OF SURVEY BRGS TO BE BOXED BACK AS ORIGINAL. ALL UNITS X-HEAD BEAD BEARING CLEARANCES TO BE TAKEN AND PRESENTED TO SURVEYOR . IF ANY PART/ BEARING SHELL WORN OUT BEYOND LIMIT NEW SHIP SUPPLY PART /BEARING TO BE FITTED. QUOTE TO BE INCLUSIVE OF ALL CHARGES.
TO MEASURE CLEARANCE BETWEEN ALL UNITS RECIPROCATING PARTS: 1. CENTERING OF THE LINER 2. CLEARANCE BETWEEN GUIDE STRIP AND XHD 3. CLEARANCE BETWEEN GUIDE SHOE AND XHD.
QUOTE FOR MAIN ENGINE CROSSHEAD PIN RENEWAL PIN SHIP SUPPLY
E21020 ITEM: PRE-TENSIONING STAY BOLTS; TIE BOLTS FOR M/E TYPE / CAPACITY / DETAILS : MAN B & W 6S50MC-C8 TIER II POWER= 9480 KW @ 127 RPM
28 NOS. TIE BOLTS TO BE CHECKED FOR PRETENSION. HYDRAULIC DISMANTLING PRESSURE 1500 BAR (TO CONFIRM).STAY BOLTS TO BE RETIGHTENED IN PAIRS WORKING FROM THE MIDDLE TOWARDS ONE END AND THEN AGAIN FROM THE MIDDLE TOWARDS THE OTHER END.HYDRAULIC PRESSURE TO BE MAINTAINED AT D1 AND STAY BOLT NUTS RETIGHTENED WITH A TOMMY BAR MAKING SURE NUTS BEARING AGAINST CONTACT FACE WITH A FEELER GUAGE. AFTER COMPLETING ALL BOLTS THE FIRST PAIR OF STAY BOLTS TO BE TIGHTENED TO 10% BELOW D1 AND NUT TO BE CHECKED FOR LOOSENESS. IF FOUND LOOSE ALL STAY BOLTS TO BE TIGHTENED ONCE AGAIN. IF NOT LOOSE THE FIRST PAIR TO BE TIGHTENED TO D1 .
E21021 RE-TIGHTENING OF HOLDING DOWN BOLTS & END CHOCKS FOR M/E TYPE / CAPACITY / DETAILS : MAN B & W 6S50MC-C8 TIER II POWER= 9480 KW @ 127 RPM
HOLDING DOWN BOLTS TIGHTNESS TO BE CHECKED (USING HYDRAULIC JACK MARKED WITH HOLDING DOWN BOLTS) BY RAISING THE HYDRAULIC PRESSURE SLOWLY WHILE CONSTANTLY ATTEMPTING TO LOOSEN THE NUT WITH THE TOMMY BAR. THE OIL PRESSURE INDICATED BY THE PRESSURE GAUGE WHEN THE NUT COMES TO LOOSE (LOOSENING PRESSURE) IS TO BE RECORDED IN THE CHECKING TABLE. THE BOLTS ARE TIGHTENED TO THE NORMAL TIGHTENINIG PRESSURE THEREAFTER. TIGHTENING PRESSURE – TO CONFIRM.
END CHOCK BOLTS TIGHTNESS TO BE CHECKED (USING HYDRAULIC JACK MARKED WITH EPOXY CHOCKS) BY RAISING THE HYDRAULIC PRESSURE SLOWLY WHILE CONSTANTLY ATTEMPTING TO LOOSEN THE NUT WITH THE TOMMY BAR. THE OIL PRESSURE INDICATED BY THE PRESSURE GAUGE WHEN THE NUT COMES TO LOOSE (LOOSENING PRESSURE) IS TO BE RECORDED IN THE CHECKING TABLE. THE BOLTS ARE TIGHTENED TO THE NORMAL TIGHTENINIG PRESSURE THEREAFTER.
IMMEDIATELY AFTER FINISHING OF CHECKING OF THE LOOSENING PRESSURES OF THE HOLDING DOWN BOLTS AND THE RETIGHTENING OF THE HEIGHT OF THE EPOXY SUPPORTING CHOCKS ARE TO BE CHECKED. WARNING: ACCIDENTAL APPLICATION OF LARGER JACK (MEANT FOR THE END CHOCK BOLTS) ON THE HOLDING DOWN BOLTS WOULD CAUSE SERIOUS OVER-STRESSING OF EPOXY SUPPORTING CHOCKS.
E21022 ITEM : MAIN ENGINE CRANKCASE & SUMP TYPE / CAPACITY / DETAILS : MAN B & W 6S50MC-C8 TIER II POWER = 9480 KW @ 127 RPM
MAIN ENGINE SUMP (CIRCULATING LUB OIL TK.) LUB OIL TO REMOVE FROM THE TANK & COLLECT IN ABSOLUTELY CLEANED TKS OR DRUMS (YARD SUPPLY); TANK TO BE VENTILATED; MAN ENTRY CERTIFICATE TO BE OBTAINED AND TANK TO BE THOROUGHLY CLEANED OFF SLUDGE.CAPACITY:17.69 M3
ENTIRE CRANK CASE WITH GEARS TO BE CLEANED THOROUGHLY TO REMOVE DIRTY OIL STAINS FROM THE WALLS OF CRANK CASE & SURFACES OF THE RUNNING GEARS.
INSPECTION OF CRANKCASE DRAIN TANK STRUCTURE TO BE CARRIED OUT; IF ANY CRACK FOUND IN THE STRUCTURE IN BETWEEN COFFERDAM AND DRAIN TANK; SAME TO BE WELDED / REPAIRED AFTER OBTAINING NECESSARY HOTWORK PERMIT.
OIL TO PUT BACK IN SUMP AFTER COMPLETION OF CLEANING AND INSPECTION.
MAIN ENGINE LO SUMP DIAPHRAGMS GASKET/NEOPRENE TO RENEW. DIAPHRAGM YARD SUPPLY. MANHOLES FOR THE SUMP ENTRY TO BE OPENED AND BOXED BACK AFTER THE WORK. ABOVE QUOTE TO BE INCLUSIVE OF CONSUMMABLES GASKET MANPOWER TRANSPORTATION EMPTY TANK FACILITY PORTABLE PUMP HOSES ETC.
E21025 ME CYLINDER LUBRICATORS TYPE / CAPACITY / DETAILS : MAN B & W 6S50MC-C8 TIER II POWER= 9480 KW @ 127 RPM
ALL 6 UNITS CYLINDER LUBRICATORS TO REMOVE FROM PLACE AND CLEANED THOROUGHLY WITH KEROSENE ANND FLUSHED WITH LUB OIL. ALL LINE FILETRS TO CLEAN.
ALL CYLINDER PUMPS OPERATION TO CHECK AND REPAIR AS REQUIRED
TIMINGS OF CYLINDER ADMISSION TO BE CHECKED AS PER MAKER'S INSTTRUCTIONS
ADJUSTMENT OF CYLINDER LUBRICATOR TO BE CARRIED OUT AS REQUIRED BELOW.
CHECK GAS PRECHARGE PRESSURE SAFETY DEVICES FITTINGS LINE CONNECTIONS AND ACCUMULATOR FIXATION OF DIAPHRAM ACCUMULATOR
NITROGEN TO BE CHARGED IN ALL THE ACCUMULATOR(SUPPLY OF GAS BY YARD)
TILE MARINE
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .