Navsari Municipal Corporation
CONSTRUCTION OF UTTAR BHARTIYA SAMAJ SHANESHWAR RAMNAGAR BHAVAN AT VIJALPORE IN NAVSARI MUNICIPAL CORPORATION UNDER M.P GRANT YEAR 2025-26.
285768
104/2025-2026
Open
Civil - All
Navsari
3 documents required · 3 mandatory
₹900
Navsari
₹9,170
12 Mar 2026
12 Mar 2026
12 Mar 2026
25 Mar 2026
12 Mar 2026
Estimated Cost put to tender / Three work carried out
shall be of 40% of Estimated Cost put to tender in Last
5 Estimated Cost put to Tender Rs. 916604.85/-
6 Tender fees Rs.900/- Demand Draft in favour of Municipal Commissioner,
(Non refundable) Navsari)
7 Earnest Money Deposit Rs.9170/- Demand Draft or Bank Guarantee in favor of Municipal
Commissioner, Navsari)/) To be submitted as prescribed in
below. Demand Draft or Bank Guarantee shall be from
Nationalized Bank / Scheduled Bank and valid for 180 days.(As
per NMC finance dept. circular No-5 Dt.5/5/07 & F.D. Circular
No. 29 Dt. 7/08/2010) & attached ANNEXURE - 1 finance dept.
circular No - 08 Dt.04/05/12 & finance dept. circular No -
Dt.19/06/2020 & finance dept. circular No - 40 Dt.05/11/2020 &
finance dept. circular No -10 Dt.01/06/2022
8 Submission of EMD and In separate sealed cover each for EMD and Tender Fees along
Tender Fees with Tender as described in the invitation of tender and submitted
to Navsari Municipal Corporation Dudhiya Talav Ring Road,
Asha Nagar, Navsari 396445.To be Submitted Physically As per
9 Date of Opening of Technical Technical Bid will be opened online as per N.I.T. in the office
bid of Assistant Manager Dudhiya Talav Ring Road, Asha Nagar,
Navsari 396445.Dt., UP TO 15:00 PM
10 Pre Bid Meeting Not Applicable
11 Security Deposit 5 % of the Sanctioned Tender Amount in form of Bank Guarantee
/ Demand Draft (As per Annexure-I), Refer NMC Circular No.03,
12 Mode of sending the Tender Price bid should be submitted by online e-tender only and
Documents Technical bid should be submitted physically also in sealed
envelope systems By RPAD/Speed post/ Hand Delivery in sealed
covers in Two Set (One Original & One Duplicate) Each part
shall be separately duly sign & seal by contractor .
13 liquidated damages- Penalty 10% of the Amount For Balance work After Date of
For Delay Completion or extended time Limit.
14 Deduction of Retention Retention @ 2% of the value of work done will be deducted from
Money from each RA Bill each RA bill. It will be released along with release of payment of
15 Place of Arbitration Navsari
16 Language of Arbitration English
17 Amount to be deducted from Welfare cess as per act 1996 @ 1 % of bill amount
each bill for labour welfare
fund (non-refundable)
18 Labour welfare cess As per construction works welfare cess Act – 1996 non-
refundable 1% of tender amount shall be deducted against
works welfare cess.
Solvency Certificate Solvency certificate for an amount up to 20% of the
Estimated Cost put to tender. A solvency certificate to this
effect shall be submitted by him not Older than Last One
Year from any Nationalized bank as per Annexure-I
20. All Rate of Tender Are Exclusive GST. The Bidder shall
have to quote The Rate Accordingly.
Third Party Inspection / Project Management Consultant
The Client at their Discretion may appoint Third Party Inspectors (TPI) and /
Project Management Consultants (PMC) for Betterment of the Project. The Bidders
/ Contractors are Hereby Informed that they shall be Responsible for following the
Instruction given by this Agency / Agencies through out the Project. If any
Discrepancy in the Testing Methodology arises, the Method / Practices Suggested
by these Agencies shall be Abiding to the Bidders.
Conditional tenders will not be accepted. Municipal Commissioner reserves the
rights to reject any or all the tenders in Parts or Full without assigning any reasons
Whatsoever or to Split the Tender & Award to One or More than One Tenderer in
the Interest of Public.The Tenderer shall have no Cause of Action or Claim Against.
Seal and Signature of the Bidder City Engineer
Navsari Municipal Corporation
1. INFORMATION TO TENDERER
Work: CONSTRUCTION OF GHAT AND BHAVAN AT SAMSHANBHUMI VIRAVAL IN
WARD NO.4 NAVSARI MUNICIPAL CORPORATION AREA NAVSARI UNDER MP
GRANT YEAR 2025-26
1. Estimated cost put up to : Rs. 916604.85/-
2. Earnest Money Deposit : Rs. 9170/- to be submitted in the form of
D.D. in favour of Municipal Commissioner, Navsari
Municipal corporation, Navsari OR Bank Guarantee
of Nationalized Bank / Scheduled Bank valid for
days after Last Date of Tender Submission.
3 (A) Security Deposit : Total 5% of tender amount.
Contractor shall submit 5% S.D. in the form of
Bank Guarantee / Demand Draft of Nationalized Bank
/ Scheduled Bank. The Security Deposit will be
Released After Submitting Performance Guarantee
Bond. Subject to Satisfactorily Completion of
Work. (Ref. NMC Circular No.03, Dt.28/04/2023.)
4. Mode of sending the tenders : As mentioned in MEMORADUM OF WORK
in duplicate. In sealed cover
by R PAD/ Speed post /
courier or hand delivery only.
5. Tender validity period : 180 Days after Last Date of Tender Submission.
6. Time of completion :
(Work shall be taken up on hand immediately
After the date of issue of work order and Site
7 Performance guarantee : (a) 5% of Amount of Completed Work in form of
Bond for DLP, O&M Work Bank Guarantee of Bank as per Annexure-1 (Ref.
Circular No. 24, dt.10-08-2021 & cir.no.41 dt.08-
02-2022, NMC Circular No.03, Dt.28/04/2023.) (to
be submitted on completion of work and to be
retained till defect liability period is over.
(b) For Electrical Work 5% of Ordered Value of
Operating & Comprehensive Maintenance Service
Contract Covering Upto Completion of O&M
Period (As Per BOQ ) After Successful Trail Run of
1 Month by the Way of Demand Draft / Bank
Guarantee of Bank as per Annexure-1 Only in
Favour of “Municipal Commissioner , N.M.C.”
From Date of Virtual Completion of Work &
Handing Over to Client.
8 Retention Money : 2 % Retention money will be recovered from
each running bill. And will be released at the
time of final bill.
9 Defect liability period : 12 months after completion of the work.
10. Penalty for delay : 10% of the Amount For Balance work After
Date of Completion or extended Time Limit.
11. Last date of receipt of tender : As mentioned in tender notice.
by RPAD /speed post
12. Place of receiving Tender : As mentioned in MEMORADUM OF WORK
13. Water, Electricity : Contractor shall have to make his own
Arrangements for Water and electricity for the
Purpose of construction work at site.
14. Tenders which do not fulfill all or any of condition or are submitted incomplete in
any respect will be rejected. Municipal Commissioner reserves the rights to reduce
the scope of work and contract without assigning any reason thereof.
15. No advance such as machinery advance, mobilization advance or materials advance
16. Conditional tenders will not be accepted.
17. In case of any dispute or clarification in specification of any tender items the
decision of Additional City Engineer shall be final.
18. PRICE VARIATION: NOT APPLICABLE
19 As per Standing Committee’s Resolution 0.5% testing charges shall be deducted from
each R.A. Bill and the Amount of Actual Testing Charges shall be Adjusted in the Final
Bill. Even if the Testing Expenses Exceed 0.5% of the Project Cost, the Excess Amount
shall be borne by the Contractors, and no Payment shall be made in this Regards .
20 As per construction works welfare cess Act – 1996 non-refundable 1% of
Tender amount shall be deducted against works welfare cess.
21 Contractor shall have to Pay All Applicable Tax / G.S.T. & Other Levies etc.
Declared by the Government Time to Time. The Bidder shall have to quote
The Rate Accordingly.
22 Joint venture and subcontracting shall not be allowed under this tender.
Seal and Signature of the Bidder Addi City Engineer
Navsari Municipal Corporaion
Finance dept. circular No-03 Dt.28-04-2024
(A) Guarantee issued by following banks will be accepted as SD/EMD on permanent basis.
All nationalized Banks
(B) Guarantee issued by following banks will be accepted as SD/EMD for the period up to
March -31, 2024. The Validity cut-off date in the GR is with respect to the date of issue of bank
Guarantee irrespective of the date of termination of Bank Guarantee.
(I) Commercial Banks :-
1. A U Small Finance Bank
3. City Union Bank
4. DBS Bank India Limited
6. Equitas Small Finance Bank
7. Federal Bank
10. IndusInd Bank
11. Kotak Mahindra Bank
13. Standard Chartered Bank
14. Tamilnadu Mercantile Bank
15. Ujjivan Small Finance Bank
(II) Co-operative and Rural Banks Of Gujarat :-
1. The NAVSARI Mercantile Co-Operative Bank Ltd
2. The Kalupur Commerical Co-operative Bank Ltd
3. Nutan nagrik Sahakari Bank Ltd
4. Rajkot nagrik Sahakari Bank Ltd
5. Saraswat Co-Operative Bank
6. Saurashtra Gramin Bank
7. The Gujarat State Co-Operative Bank
8. The Mehsana Urban Co-operative Bank Ltd
9. The Surat District Co-Operative Bank
10. The Surat Peoples Co-Operative Bank
Seal and Signature of the Bidder Addi City Engineer
Navsari Municipal Corporation
4. Note for Contractors.
1. Tenders once offered shall not be withdrawn except with the permission of Municipal Commissioner.
2. Tender once accepted shall be binding upon the contractor even if the formal agreement is not signed.
3. Quantities of items in BOQ (Bill of Quantities) may vary in case of necessity arises.
4. Unless otherwise stated all measurements shall be taken in accordance with the “Bureau of Indian
standards” method of measurements of building and civil Engineering IS
5. The location of the site proposed for this work may change. No any claim shall be entertained by
NMC in this regard
6. All duties chargeable by the Municipal Corporation / State Govt. will be payable by the contractor.
7. The rate shall be Exclusive of G.S.T. or any other taxes, duties, cess or leavy etc. Payable by the
contractor for which no extra payment shall be made and no claim in this context shall be entertained
8. The percentage above or below shall be filled in ink in figure and words. The final total shall be
written in figure & word.
9. Contractor is requested to see the site physically before tendering. He is also requested to quote the
rates keeping in view the points mentioned in relevant pages of tender documents.
10. The contractor shall have to submit the tenders in duplicate i.e. two sets-original and duplicate.
11. All information / details to be submitted in the given Performa supported by the valid certificated &
attested duly signed. (Please refer Information’s Details to be submitted by the tenderers in the Performa
mentioned under STATEMENT NO 1 TO 9 )
Signature of Contractor Addi. City Engineer
Date : Navsari Municipal Corporation
5. Conditions for the Water Supply & Electric Supply
Contractor shall have to arrange at his own cost, a suitable Network with pipes for the
construction of the works and provide a satisfactory supply of potable water for drinking. Washing,
sanitation and cleaning down.
Electric supply shall be made available at the site by Contractor. Contractor must make his
own arrangements with Electricity Supply Authorities and with other contractors to connect to and
take a supply from such services, paying all costs in Connection therewith. Necessary Documents
for getting Electric supply/connection will be arranged by NMC Authority. The Contractor shall be
entitled to use such supply. Electricity as may be available on the site for purpose of the work and
shall pay such charges as is fixed by the appropriate supply Authorities.
In case if there is any delay in supply of power site of any interruption or fault in the power
during the work. No compensation shall be paid for idle labor staff, machineries and for use of
diesel operating sets etc. as the case may be.
Signature/Stamp of Contractor Additional City Engineer
Navsari Municipal Corporation
6. Tender Declaration form
Additional City Engineer,
Navsari Municipal Corporation , NAVSARI
Project: CONSTRUCTION OF UTTAR BHARTIYA SAMAJ SHANESHWAR RAMNAGAR
BHAVAN AT VIJALPORE IN NAVSARI MUNICIPAL CORPORATION UNDER M.P GRANT
I/We the undersigned have carefully gone through and clearly understood the Tender
documents of above mentioned project comprising of Notice Inviting tenders, Articles of
Agreement, Scope of work, Definition of terms, notes Instructions/Information to Tenderer,
Condition of Contract, special condition of contract, Appendices, Specifications, Schedule of
quantities and tendered drawings furnished by NAVSARI MUNICIPAL CORPORATION. I/We
have satisfied myself/ourselves as to the location of site, examined drawings. I/We have visited site
& fully acquainted with local situations regarding materials, labors & others factors pertaining to
work before submitting tenders.
I/We do hereby offer to execute and complete the whole of the work within the time
specified all in accordance with the specification, designs, drawing and instruction in writing
referred to in the said document and with such materials as are provided for, at the respective rates
which I/we have quoted in the schedule-B or at such other rates as maybe fixed under the provisions
of these conditions.
In the event of this tender being accepted I/We agree to enter into an agreement and when required
and execute the contract, according to your fom1 of agreement as or in default where of I/we bind
myself/ourselves to forfeit the "Earnest Money Deposit."
I/We understand that if I/WE shall not enter in agreement within ten days or decided by
NMC from the date of receipt of letter of acceptance, you will forfeit the earnest money paid by
me/us and take necessary action as deemed fit.
I/We have enclosed a Demand Draft / Bank Guarantee as an “Earnest Money Deposit", for
the sum as mentioned in NIT, the full value of which is to be absolutely forfeited to the Employer If
I/We fail to commence the work specified. Otherwise the Employer shall retain the said sum, as on
account of such. Security)' Deposit'.' as provided for in the aforesaid documents.
I/We agree not to employ Sub-contractors other then those that may be approved in
accordance with Conditions in the aforesaid documents.
I/We understand that Muni. Commissioner shall have right to accept, reject the
tender as well as the rate at which tender to be accepted and awarded.
I/We am/are bound to execute the job if the work order is issued within 180 days from the
date of opening of the tender.
I/We agree to pay the Government Tax, G.S.T. , Labor Cess and other Prevailing taxes as applicable
on such items on which the same are leviable and the rates quoted by me/us are inclusive of the
Signature/Stamp of Contractor Additional City Engineer
Navasari Municipal Corporation
NAVSARI MUNICIPAL CORPORATION
Invitation for Bid (IFB)
1. The NAVSARI MUNICIPAL CORPORATION,( hereinafter called “the Employer”)
invites sealed Tender document from reputed and qualified bidders for the construction of
Works detailed in the Table below:-
Sr Name of Works Approximate Earnest Money Completion
. value of works Deposit (Rs.) Period
1 CONSTRUCTION OF UTTAR Rs. 916604.85 Rs. 9170/- 6 Month
BHARTIYA SAMAJ SHANESHWAR
RAMNAGAR BHAVAN AT
VIJALPORE IN NAVSARI
MUNICIPAL CORPORATION
UNDER M.P GRANT YEAR 2025-
2. Interested bidders shall download the tender documents from NMC’s website
www.nprocure.com.
3. Tender (a complete set of bidding document) fee shall be As per N.I.T in the form of
Demand Draft from any Nationalized Bank in favor of MUNICIPAL
COMMISSIONER, NAVSARI, payable at Navsari, which shall be nonrefundable. The
Details of Tender fees shall be submit with scan copy at the time of Quoting price
bid of the tender and physically to be submitted along with technical bid Vol.-1
with other enclosure.
4. All bids must be accompanied by Earnest Money Deposit of the amount specified for the
Works in the above Table payable at Navsari and drawn in favor of MUNICIPAL
COMMISSIONER, NAVSARI, payable at Navsari,. Earnest Money Deposit will have
to be specified in Clause 2 of Financial Condition.
5. Physical submission must be delivered to Dudhiya Talav Ring Road, Asha Nagar, Navsari
396445. As per N.I.T.
6. The Bids will be opened on As per N.I.T at the office of Assistant Manager Dudhiya
Talav Ring Road, Asha Nagar, Navsari 396445. in the presence of bidders or their
representatives who choose to attend. In the event of the specified date of bid
submission/opening being declared a holiday for the Employer, the bids shall be
received /opened on the next working day at the same place and the same time.
TERMS & CONDITIONS
( A ) INSTRUCTIONS TO BIDDERS (ITB)
( B ) GENERAL TERMS & CONDITIONS
( C ) FINACIAL TERMS & CONDITIONS
( D ) MAIN CONDITION / FETURES OF THE WORK
NAVSARI MUNICIPAL CORPORATION
TERMS & CONDITION
( A ) INSTRUCTIONS TO BIDDERS (ITB)
1. Procedure for Submission of Tender
a).The Bidder should quote the price bid in e- tender form before last date of online submission as
per N.I.T and all other details as asked in the tender.
b).The bidder shall submit the following Tender documents physically in hard copy in two separate
envelope (marked as “original” and other marked as “Duplicate”) in schedule time by
RPAD/ Speed Post/ Hand Delivery in duplicate. This envelope shall be sealed in an outer
envelope. The Bid envelopes shall be marked as follows:-
Tender Document Vol.
Registration certificate of class
Power of Attorney
Personal Details
Enclosures as asked in tender
Technical specifications duly sign by contractor.
c).The envelope shall be addressed to the Employer at the following address:
Assistant Manager,
Assistant Manager Dudhiya Talav Ring Road, Asha Nagar, Navsari
d). Indicate the name and address of the bidder.
If the outer envelope is not sealed and marked as above, the Employer will assume no
responsibility for the misplacement or premature opening of the bid.
e).All information has to be typed or hand written legibly. All pages of the Bid have to be initialed
f) ALL INFORMATION HAS TO BE SUBMITTED IN THE PRESCRIBED FORMAT ONLY.
Projects for which incomplete information has been provided will not be considered for
evaluation. The Bidder may attach separate sheets if so required. However, the final bound
document submitted, has to be submitted in vertical A4 size (210 mm X 297 mm) except Form
2. Assessment of Submission
2.1The Employer will open the physically submitted document of all the bids received for the
package (except those received late) containing the sealed Tender volume and other enclosures
then announce the names of bidders in the presence of bidders or their representatives who
choose to attend on the date and time mentioned in the IFB. In the event of specified date of bid
opening being declared as a holiday for the Employer, the Tender will be opened at the
appointed time and location on the next working day.
2.2 In Physical submission, Bidders detailed and tender fee, E.M.D. shall be opened first. The
Employer at the opening will announce bidder’s names, , the presence/or absence of EMD, the
amount and validity of EMD furnished with each bid, is valid registration and such other
details, as the Employer may consider appropriate.
2.3 The Employer will determine whether the bid is accompanied by the required EMD.
2.4 If the EMD furnished does not conform to the amount and validity period as specified in the
Invitation for Bid and has not been furnished in the form, the bid shall be rejected by the
Employer as non-responsive and the Tender volume will be returned to the bidder.
2.5 Subject to confirmation of the EMD by the issuing bank, the Tender volume accompanied with
valid EMD will be taken up for further evaluation. In case, the Bank does not confirm the EMD,
the bid shall be rejected as non-responsive and no further evaluation carried out.
2.6 The tender volume will further be examined to determine whether the bid has been properly
signed, meets the eligibility and qualification criteria, has the required available bid capacity, is
accompanied by the requisite certificates, undertaking and other relevant information specified
in the bid documents and is substantially responsive to the requirement of the bidding
documents and provides any clarification for ascertaining the correctness of the
information/details.
2.7 The Employer shall prepare besides the record of bid opening, minutes of the Bid opening,
including the information disclosed to those present in accordance with Sub Clause 3.2 thereof.
2.8 The bidders or their representatives who are present shall sign attendance sheet evidencing their
2.9 If the Tender volume is not substantially responsive, it will be rejected by the Employer and will
not subsequently be made responsive by correction or modification or withdrawal of the
nonconforming deviation or reservation.
3. Evaluation and Comparison of Tender volume
The Employer will evaluate and compare only those Tender volumes which are determined to
be substantially responsive in accordance with Clause 2 as above and qualified for award of
Contract in accordance with Clause 5 as below.
4. Procedure for Tender Opening
Received copies of tender in physical form within scheduled time, will be open on scheduled
date and time. In the event of specified date of bid opening being declared bidders who qualify
the criteria then bidder bid will be considered for opening of price bid.(Following clause no.
5.1 The Employer will award the Contract to the bidder whose bid has been determined to be
substantially responsive to the bidding documents and who has offered the Evaluated Bid Price,
provided that such bidder has been determined to be (i) eligible in accordance with the
provisions of Clause 3(General Terms and Condition); and (ii) qualified in accordance with the
provisions of Clause 5(General Terms and Condition).
6. Notification of Award
6.1 Prior to expiration of the period of bid validity prescribed by the Employer, the Employer will
notify the successful bidder by cable/fax and confirmed by registered letter that his bid has been
accepted. This letter shall name the sum which the Employer will pay the Contractor in
consideration of the execution, completion and maintenance of the Works by the Contractor as
prescribed by the Contract.
6.2 The notification of award will constitute the formation of the Contract.
7. As per Finance Department Circular no. 03, DT: 28/04/2023 A successful Bidder has to
deposit security deposit / Bank Guarantee within 15 days after receiving letter of Intent.
Time limit of work will commence from the date of issue of work order.
8. Clarification of Bids
8.1 To assist in the examination, evaluation and comparison of bids, the Employer may, at his
discretion, ask any bidder for authentication the correctness of the information/details furnished
by him in his bid. Such request by the Employer and the response by bidder shall be in writing
or by cable/fax.
8.2 Subject to above clause, no bidders shall contact the Employer on any matter relating to his bid
from the time of bid opening to the time contract is awarded.
8.3 Any effort by the bidder to influence the Employer in the Employer’s bid evaluation, bid
comparison or contract award decisions may result in the rejection of his bid.
9.1 Information relating to the examination, clarification, evaluation and comparison of bids and
recommendations for the award of a contract shall not be disclosed to bidders or any other
persons not officially concerned with such process until the award to the successful bidder has
been announced. Any effort by a bidder to influence the Employer's processing of bids or award
decisions may result in the rejection of his bid.
10.1 The bidder is advised to visit and examine the Site of Works and its surroundings and obtain
for itself on its own responsibility all information that may be necessary for preparing the bid
and entering into a contract for construction of the Works. The costs of visiting the Site shall be
at the bidder’s own expense.
10.2 The bidder and any of its personnel or agents will be granted permission by the Employer to
enter its premises and lands for the purpose of such inspection, but only upon the express
condition that the bidder, its personnel and agents, will release and indemnify the Employer
and its personnel and agents from and against all liability in respect thereof and will be
responsible for death or personal injury, loss of or damage to property and any other loss,
damage, costs and expenses incurred as a result of the inspection.
Seal and Signature of the Bidder Addi. City Engineer
Date: NAVSARI MUNICIPAL CORPORATION
NAVSARI MUNICIPAL CORPORATION
TERMS & CONDITION
( B ) GENERAL TERMS & CONDITIONS
1. Scope of Bid
1.1 The NAVSARI Municipal Corporation hereinafter called "the Employer" invites
Tender document for the construction of works (as defined in these documents, hereinafter
referred to as "the Works") detailed in the table given in the IFB.
1.2 The Works consist of:
PROPOSED KADIA NAKU, OF NAVSARI MUNICIPAL CORPORATION AREA
2. Source of Funds
2.1 The expenditure on these Works will be met by NAVSARI MUNICIPAL
3. Eligible Bidders
3.1 This invitation for bids is open to bidders who has necessary bid capacity and who meet
the following requirements:
A bidder shall not be under a declaration of ineligibility for corrupt or fraudulent
1) Contractor registered in “E2 Class” working with N.M.C or registered in
“E2 Class” with the Government of Gujarat, other State Governments,
Semi Government bodies, Central P.W.D. In case of Non Register With
NMC, The Bidder has to get registered within 3(Three) month after
receiving work order.
(2) Contractor having experience of Similar Type of Building construction Work
having Minimum value of Single work carried out shall be of 80% of Estimated
Cost put to tender / Two Works shall be of 50% of Estimated Cost put to tender /
Three work carried out shall be of 40% of Estimated Cost put to tender in Last
Seven year. (Refer Enhancement Factor Criteria as Below) Escalation factor:
Following enhancement factor will be applied for annual turnover and completion cost of
project to bring them to the base year. The current financial year in which bid is invited
shall be considered as the base year. This shall be applicable for last 5 years only.
Year Financial Year Enhancement Factor
Base (year of inviting tender) 2024-2025
Enhancement factor is a multiplication factor to utilized for enhancing the value of the work
of work done, turnover Amount. For instance if the bidder has completed the work of
Rs.1.00 crore in financial year 2024-2025, then the bidder can use the enhancing factor of
1.46 and the value of work done shall be 1.50 X 1.00cr. = Rs. 1.50 crore.
Work Completion:
1. For work completion, the bidder has to submit Certificate 3 (A) from their respective
employers. Those works which are not supported by the Certificate 3(A) shall not be
considered as completed work.
2. Work completed by the bidder with Government / Semi Government under the name
of the bidder them self shall be considered for evaluation.
3. Work completed by the bidder from Private works (Not Sublet), but shall be under
the direct name of the bidder, shall be considered of 50% value of the work done. The
amount to be derived for this, shall consist only building construction works and no
4. Since this is a Building Construction work, the work completed shall be Building
Construction only, even though, if there is a Comprehensive Building Work completed
Bidders shall provide such evidence of their continued eligibility satisfactory to the
Employer, as the Employer shall reasonably request .
4. Eligible Material, Equipment and Services
4.1 At the Employer's request, the bidder having offered the evaluated lowest financial bid
may be required to provide evidence of the origin of materials, equipment, and services to
the satisfaction of the Employer.
4.2 For purposes of Sub Clause 4.1, "origin" means the place where the materials are
mined, grown, produced or manufactured; similarly for equipment and from where the
services are provided.
5. Qualification of the Bidder
To be qualified for award of Contract, bidders shall:
a) Submit a written power of attorney authorizing the signatory of the bid to commit the
5.1 Organisation & Management
a. Memorandum of association/articles of association/partnership agreement
b. Bids from the joint ventures are not acceptable.
c. Certificate of class of registration
5.2 Financial Status
5.2.1 Achieved an Average Annual financial turnover during the last 3 years, ending 31st
March of the previous financial year should be at least 30% of the estimated cost
put to Tender. It should be duly certified by Chartered Accountant.
5.2.2 (Escalation factor as mentioned above shall be used to bring the value of such
completed works to the level of current financial year i.e. 2024-25)
5.2.3 If company did not exist for the last 5 years, corresponding figure for the year is to
be taken as zero.
5.2.4 The agency should Submit Solvency certificate for an amount up to 20% of the
tender amount. A solvency certificate to this effect shall be submitted by him not
Older than Last One Year from any Nationalized bank as per Annexure-I.
5.3 Sub-Contractors' experience and resources shall not be taken into account in
determining the bidder's compliance with the qualifying criteria.
General information
All individual firms must complete the information in this form. Nationality information
shall be provided for all owner(s) or applicant(s) that are partnership or individually owned
1 Name of firm:
2 Head office address:
3 Local office address (if any):
4 Telephone/ Contact:
5 E-mail address:
6 Place of incorporation/registration:
7 Year of incorporation/registration:
Additional information regarding litigation, debarment, arbitration, etc.
5.4 Disqualification
Even though the Bidders may meet the above criteria, they are subject to be disqualified for
any of the following reasons:
a) Misleading or false representation in the forms, statements and attachments submitted
and included in document.
b) Record of poor performance such as abandoning the work, rescinding of contract for
which the reasons are attributable to the non-performance of the contractor, consistent
history of litigation awarded against the applicant or financial failure due to bankruptcy.
c) Has been identified by the Employer as poor performer in implementation of ongoing
5.5 Debarment/Black listing
Notwithstanding the above, the Employer may debar or blacklist any of the bidder(s) for
their misleading or false representations in the forms statements etc. for the period to be
decided by the Employer
6. One Bid per Bidder
6.1 Each bidder shall submit only one bid per contract package either by himself. A bidder
who submits or participates in more than one bid for a contract package will be
7. Bidding Documents
The bidder is expected to examine carefully the contents of all the above bid documents.
Failures to comply with the requirements of bid documents will be at the bidder's own risk.
Bids which are not substantially responsive to the requirements of the bidding documents
will be rejected.
8. Language of Bid
The bid, and all correspondence and documents related to the bid exchanged between the
bidder and the Employer shall be written in the English language. Supporting documents
and printed literature furnished by the bidder may be in another language provided they are
accompanied by an accurate translation of the relevant passages in the English language, in
which case, for purposes of interpretation of the bid, the English translation shall prevail.
9.1. Unless stated otherwise in the bidding documents, the Contract shall be for the whole
works as described in bidding documents, based on the percentage rate amount in the
Bill of Quantities submitted online by the bidder.
9.2. The bidder shall fill (in e-tender) in percentage rate above or below and total amount
9.2. The bidder shall fill (in e-tender) in percentage rate above or below and total amount
(both in figures and words) for overall items of the Works provided in the Bill of
10. Bid Validity
10.1 Bids shall remain valid as per Instruction to Bidders (ITB) after that deadline date for
bid submission specified in Clause. The Employer as non-responsive shall reject a bid
valid for a shorter period.
10.2 In exceptional circumstances, prior to expiry of the original bid validity period, the
Employer may request the bidders to extend the period of validity for a specified
additional period. The request and the responses thereto shall be made in writing or by
fax. A bidder may refuse the request without forfeiting his bid security. A bidder
agreeing to the request will not be required or permitted to modify his bid but will be
required to extend the validity of his Bid Security for the period of the extension, and
in compliance with Clause 2 ( Financial Terms & Conditions) in all respects.
11. Format and Signing of Bid
11.1 The bidder shall prepare two copies of the documents comprising the bid as described
in Instructions to Bidders.
11.2 The bid shall be typed or written in indelible ink and shall be signed by a person or
persons duly authorized to sign on behalf of the bidder.
11.3 The bid shall contain no alterations, omissions or additions, except those to comply
with instructions issued by the Employer, or as necessary to correct errors made by
the bidder, in which case the person or persons signing the bid shall initial all such
11.4 All witnesses and sureties shall be persons of status and probity and their full names,
Occupations and addresses shall be printed below their signatures.
12. Deadline for Submission of Bids
Bids must be received by the Employer at the address specified above not later than the
time and date specified in the IFB.
Any bid received by the Employer after the deadline for submission of bids will be returned
unopened to the bidder.
14. Signing of Agreement
At the same time that the Employer notifies the successful bidder that his bid has been
accepted, the Employer will direct him to submit the Performance Security and attend the
Employer's office on a date determined by the Employer for signing the Form of
15. The selection process will lay high emphasis on the ability and competency of
contractors to do high quality work within the given time schedule.
16. The onus of providing, all necessary company / project related information, in
appropriate manner and medium, so as to demonstrate the competency of the bidder and to
allow proper evaluation, will rest entirely on the Bidder.
17. All clause shall be operative from the date of issue of work order and up to the expiry of
original and extended time limit.
18. Legal Condition:-
Corrupt or Fraudulent Practices
The Employer will reject a proposal for award if he determines that the Bidder
recommended for award has engaged in corrupt or fraudulent practices in competing for
the contract in question. The Employer will declare the firm ineligible, either
indefinitely or for a stated period of time, to be awarded a contract by NAVSARI
MUNICIPAL CORPORATION if it at any time determines that the firm has engaged in
corrupt or fraudulent practices in competing for the contract, or during execution.
“corrupt practice” means behavior on the part of officials in the public or
private sectors by which they improperly and unlawfully enrich themselves
and/or those close to them, or induce others to do so, by misusing the position
in which they are placed, and it includes the offering, giving, receiving, or
soliciting of anything of value to influence the action of any such official in
the procurement process or in contract execution; and
“fraudulent practice” means a misrepresentation of facts in order to influence a
Procurement process or the execution of a contract to the detriment of the
Borrower, and includes collusive practice among bidders (prior to or after bid
submission) designed to establish bid prices at artificial non-competitive levels
and to deprive the Borrower of the benefits of free and open competition.
Municipal Commissioner reserves the rights to reduce/increase the scope of work and
contract without assigning any reason thereof.
If NAVSARI Municipal Corporation is convinced that the Bidder has resorted to
material misrepresentation or provided fraudulent information / statement, the said
Bidder will be liable for disqualification / rejection at any stage.
Proof for fulfillment of eligibility criteria should be submitted along with Tender
volume. If the Tender volume is submitted without valid documents and without proof
of eligibility criteria it will be rejected.
Those who do not meet with the eligibility criteria need not submit the Tender
Tenders, which do not fulfill all or any of condition or are submitted incomplete in any
respect or are conditional tenders, will be rejected.
Contractor shall be responsible to obey all Labour Laws, Environmental and Safety
Laws.(the existing laws as well as framed from time to time). Any penalties laid due to
violation of such laws shall be directly deducted from the contractor's outstanding.
19. Administrative Conditions:-
Safety and Signage
Contractor has to arrange for the complete safety of the persons working for
project, users of the surrounding area i.e. public and vehicles also. All the
arrangements of safety equipment, first-aid treatment, mandatory signage
regarding work & traffic as per requirement to be arranged at site.
Necessary dropping, shoring and under pinning shall be provided for the safety
of the adjoining work or property, which is to be left intact, before dismantling
and demolishing is taken up and the work shall be carried out in such a way that
no damages is caused to the adjoining property.
Liaison with local authority for electrical connections for the NMC
The contractor is responsible for liaison with local authority for change in supply
connection or new connection on behalf of NMC. It includes filling the necessary
application to power Supply Company, follow up and getting the supply, filling the
necessary test reports to the power supply company. All official fees including security
deposits and other expenses shall be of initially paid by the contractor.
Contractor shall not sublet the work without permission of the authority.
Insurance in respect of damage to persons and property:
The contractor shall be liable for and shall indemnify the Employer against any liability,
loss, claim or proceedings whatsoever arising under any statute or at common law in
respect of personal injury to or the death of any person whomsoever arising out of or in the
course of or caused by the carrying out the works, unless due to any act or neglect of the
Employer or of any person for whom the Employer is responsible.
The contractor shall be responsible for all injury to persons, animals or things, and for all
structural and decorative damage to property which may arise from the operation or
neglect of himself or of any nominated sub-contractor's employees, whether such injury or
damage arise from carelessness, accident or any other cause whatever in any way
connected with the carrying out of this contract. This clause shall be held to include,
interlaid, any damage to buildings, whether immediately adjacent or otherwise and damage
to roads, streets, good paths, bridges or way as well as all damage caused to the buildings
and works forming the subject of this
Contract by frost or other inclemency of weather. The contractor shall indemnify the
employer and hold him harmless in respect of all and any expenses arising from any such
injury or damage to persons or property as aforesaid and also in respect of any claim made
in respect of injury or damage under any acts of government or otherwise and also in
respect of any award of compensation or damages consequent upon such claim.
The contractor shall reinstate all damages of every sort mentioned in this clause, so as to
deliver up the whole of the contractor works complete and perfect in every respect and so
as to make good or otherwise satisfy all claims for damage to the property of third parties.
The contractor shall indemnify the employer against all claims which may be made
against the employer by any member of the public or other third party in respect of
anything which may arise in respect of the work or in consequence thereof and shall at
his own expense arrange to effect and maintain until the virtual completion of the
contract, with an approved office and policy of insurance in the joint names of the
employer and the contractor against all claims which
may be made upon the employer whether under the workmen's compensation act or any
other statute in force during the currency of this contract or at common law in respect of
any employee of the contract or any sub-contractor and shall at his own expense effect
and maintain, until the virtual completion of the contract, with an approved office a
policy of insurance in the joint names of the employer and contractor against such risks
and deposit such policy or policies with the Architect from time to time during the
currency of the contract.
The contractor shall be responsible for anything which may be excluded from the
insurance policies above referred to and also for all other damages to any property arising
out of and incidental to the negligent or defective carrying out of this contract. He shall
also indemnify the employer in respect of any costs, charges or expenses arising out of any
claim or proceeding and also in respect of any award of or compensation of damage
arising there form.
The employer with the concurrence of Architect shall be at liberty and is hereby
empowered to deduct the amount of any damage, compensation, costs charges and
expenses arising or accruing from or in respect of any such claim or damage from any sum
or sums due or to become duet to the contractor.
Insurance: (CAR)
The contractor shall in joint names of the Employer and contractor insure against loss or
damage by fire, storm, tempest, lighting, flood, earthquake, aircraft or anything dropped
therefrom, serial objects, riot and civil commotion for the full value thereof all work
executed and all unfixed materials and goods intended for, delivered to and placed on or
adjacent to the work, but excluding temporary building plant, tools and equipment owned
or hired by the contractor or any subcontractor and shall if such work material and goods
so insured until virtual completion of the work such insurances shall be with insurers
approved by the Architect and contractor shall deposit with the Architect the policy or
policies and the receipts in respect of premiums paid and should the contractor make
default in insuring or continuing to insure as aforesaid the Employer may himself insure
against any risk with respect of which the default shall have occurred and deduct a sum
equivalent to the amount paid by him in respect of premium from any monies due to or to
become due to the contractor.
Provided always that if the contractor shall independently of his obligations under this
contract maintain a policy of insurance which covers (interalia) the said work, materials
and goods against the aforesaid contingencies to the full value thereof then the
maintenance by the contractor of such policy shall if the Employer interest is endorsed
thereon, be a discharge of the contractors obligation to insure in the joint names of the
Employer and contractor and the production by the contractor as and when may reasonably
be required by the Architect of a current certificate of insurance from the company or firm
which shall have issued the said policy shall be a discharge of the contractor's obligation to
deposit with the Architect a policy or policies and the receipts in respect of premium paid.
Upon survey of any claim under the insurances aforesaid the contractor with due diligence
shall restore work damaged, replace or repair unfixed materials or goods which have been
destroyed or injured, remove all dispose of any debris and proceed with the carrying out
and completion of the work. All monies received from such insurances shall be paid to the
contractor by installments under certificates of the Architect issued at the period of interim
Certificates named in the appendix to this conditions. The contractor shall not be entitled
to payment in respect of the restoration of work damaged, the replacement and repair of
any unfixed materials or goods and the removal and disposal of debris other than the
monies received under the said insurances.
21. OFFICE ACCOMODATION FOR THE SITE ENGINEERING
The contractor shall provide, erect and maintain at his cost a separate simple watertight
office accommodation for the Site Engineer. These accommodations shall be well
lighted and ventilated and provided with Air Condition, windows, door, with a lock.
The office of Site Engineer shall be with minimum of 300 Sq. Ft. containing with
meeting room, toilet and panty facilities and the contractor shall provide minimum
desk with minimum 6 chairs, drawers for keeping drawings, 1 steel cupboard having
proper lock and a tack board for displaying drawings. The accommodation shall be
demolished when directed.
The contractor shall have to provide One number of computer systems as per
Configuration asked by the department and One Number of 3 in 1, i.e. printer,
scanner and Xerox. The contractor / PMC shall Take photograph and record all
significant site progress in terms of civil work (reinforcement, Masonry,
plastering work etc.), electric work, plumbing work (including concealed open
electric, plumbing, firefighting, CNG gas lines etc.), finishing work etc. once every
week (irrespective of no work progress on site or prolonged holidays) using
professional ten mega pixel or more camera with flesh or Minimum 14 Mega
Pixel Mobile Phone (and shot at maximum resolution) and stored and submitted
with weekly computer folders labeled clearly with date of week and serial number
of week as per week of progress.
Sanitary Arrangement:
The Contractor shall provide and erect all necessary sanitary convenience for the Site
staff and the workmen maintain in a clean orderly condition and clean and deodorize
the ground after removal.
Seal and Signature of the Bidder Addi. City Engineer
Date: Navsari Municipal Corporation
NAVSARI MUNICIPAL CORPORATION
TERMS & CONDITION
( C ) FINANCIAL CONDITION
1. Cost and Currencies of Bidding
The bidder shall bear all costs associated with the preparation and submission of his bid
and the Employer will in no case be responsible or liable for those costs.
Currencies of Bid and Payment
The rates and the prices shall be quoted by the bidder entirely in Indian Rupees
All payments including advances, if any, shall be made in Indian Rupees.
2. Earnest Money Deposit :-
2.1 Bank guarantees (and other instruments having fixed validity) issued as surety for the
bid shall be valid for 30 days beyond the validity of the bid.
2.2 The EMD of the unsuccessful bidders, except for L1, L2 and L3 bidders, will be
returned as promptly as possible as but not later than 30 days after the expiration of the
period of bid validity.
2.3 The EMD of the successful bidder, along with second and third lowest tenders, will be
returned when the bidder has furnished the required performance security and signed the
2.4 Earnest Money Deposit may be forfeited
a) if the bidder withdraws his bid during the period of bid validity;
b) in the case of a successful bidder, if the bidder fails within the specified time limit to
i) Furnish the required Performance Security or
ii) Sign the Agreement.
3. (A) Security Deposit:-
Within 15 (Fifteen) days of the date of receipt of the Letter of Acceptance, the
successful bidder shall deliver to the Employer, a Initial Security Deposit in the form
of a Bank Guarantee for an amount equivalent to 5% of the Contract Price.
The Security Deposit to be provided by the successful bidder in the form of a bank
guarantee as per format shall be issued from any Nationalized or RBI approved
foreign bank. (REFER NMC CIRCULAR NO.03, DT.28/04/2023)
(B) Performance Bond 5% of Amount of Completed Work in form of Bank Guarantee
at the time of final bill. THE CONTRACTOR SHALL SUBMIT THE PERFORMANCE
BOND IN THE REQUIRED FORMAT AS DIRECTED BY A.M.C. ALSO REFER CLAUSE
NO. 7 , PAGE NO.7 OF INFORMATION TO TENDERES.
(C) Defect liability period: 12 month for all work to be carried out by the contractor
excluding any breakage or other repairing /extension work which is not cause due to
bad workmanship or basic civil work done by agency. The period will commence
from the date of virtual completion of the site or as recorded in measurement book
for a particular running / Final Bill which is later. In any case NMC authority has
right to en-cash the performance bank guarantee with out any intimation to
contractor, which was submitted against service to be provided by contractor during
the defect liability period for unsatisfying response from contractor whenever asked
during this period.
(D) Retention :-
a) Retention @ 2% of the value of work done will be deducted from each RA bill. It
will be released along with release of payment of Final Bill.
4. Approved Bank: - As per attached ANNEXURE -1 finance dept. circular No-41
5. Mobilization advance will not be given.
6. Quantities in B.O.Q. may vary up to any extent and contractor shall not claim any extra
rate for the same.
7. Penalty: 10% of the Amount for Balance work After Date of Completion or
Extended Time Limit.
8. G.S.T. on Materials
All charge on account of G.S.T. etc. on material procurement or any other component for
the works from any source shall be borne by the contractors.
G.S.T. payable by the Contractor under the Contract, or for any other cause as of the date
28 days prior to the deadline for submission of the bids, shall be included in the rates and
prices and the total bid price submitted by the bidder and the evaluation and comparison
of bids by the Employer shall be made accordingly.
9 Price Escalation:- PRICE VARIATION Shall not be Applicable.
10. If the contractor fails to execute the said works within prescribed time limit, the said work
will be carried out at the risk and cost by other contractors with 15 supervision charges as
may be decided by the Addi. City Engineer, NMC
11. For Electricity, Contractor shall have to make his own arrangements for
The purpose of construction work at site at his own expense.
12. As per Standing Committee’s Resolution 0.5% testing charges shall be deducted from
each R.A. Bill and the Amount of Actual Testing Charges shall be adjusted in the Final Bill.
Even if the Testing Expenses Exceed 0.5% of the Project Cost, the Excess Amount shall be
borne by the Contractors, and no Payment shall be made in this Regards.
Seal and Signature of the Bidder Addi. City Engineer
Date: Navsari Municipal Corporation
Special Conditions of Contract
1. Special Conditions of Contract
I. No claim for, time extension shall be entertained for the part possession of
the site for execution.
II. Bidder should carry out the work in stipulated time limit as per tender
specification. Bidder should planned to use ready mix concrete of approved
design for speedy work. No claim for any extra rate for use of ready mix
concrete or any other latest technology for any item at any day or night time
will be eligible. Bidder should quote the rate accordingly.
III. No claim shall be entertained if the items stipulated in the tender shall not be
executed as per site condition/ requirements.
IV. No idle charges shall be paid to contractor if any machinery and man power
remain idle and no claim shall be entertained for the same.
V. Municipal Commissioner Reserves the rights to reduce / increase the scope of
work up to any extent without assigning reason thereof and the contractor has
to execute the BOQ items at his tender rate.
VI. If any underground utilities (Water pipeline, drainage, electric, telephone,
communication, etc.), Gas line foul during execution contractor shall start
work at other available work front until such utilities / Gas line are shifted. If
needed such services has to shifted by contractor, NMC will pay the rates as
per prevailing SOR/ approved rates or other non-schedules items will be paid
as per market rate analysis approved by consultants/ competent authority.
claim for time extension shall be entertained for the same.
Seal and Signature of the Bidder Addi. City Engineer
Date: Navsari Municipal Corporation
The General scope of work
PROPOSED VEGETABLE MARKET, OF NAVSARI MUNICIPAL CORPORATION AREA
as per the architectural/ Structural working drawings prepared by the consultant / NMC.
IT.2 INVITIATION TO TENDER
The Municipal commissioner for and on behalf of Navsari Municipal Corporation here in
after referred as NMC will receive tenders for the work as per the specifications and schedule of
prices in the tender document. The tenders shall be opened in the office of the Addl. City Engineer
in the presence of tenderers or their representatives who remain present. The Municipal
Commissioner reserves the right to reject the lowest or any other or all tenders or part of it which in
the opinion of the Municipal Commissioner does not appear to be in its best interest and the
tenderer shall have no cause of action or claim against the authority or its officers, employees,
successors or assignees for rejection of his tender.
IT.3 LANGUAGE OF TENDER
Tenders shall be submitted in English and all information in the tender shall also be in
English, Information in any other language shall be accompanied by its translation in English.
Failure to comply with this may make the tender liable to rejection.
IT .5 TENDER DOCUMENTS
Tender documents and set of drawings shall comprehensively be referred before tendering. The
several section form in the document are the essential parts of the contract and a requirement
occurring in one shall be as binding as though occurring in all, they are to be taken as naturally
,explanatory and describe and provide for complete works. The tender documents shall be submitted
IT. 6 EXAMINATIONS BY TENDERERS
At this own expense and prior to submitting his tender, each tenderer shall (a) examine the
contract documents. (b) visit the site and determine local condition which may affect the work
including the prevailing wages and other pertinent cost factors.(c) familiarize himself with all
central, state and local license required for the work and (d) correlate his observation, investigation
and determinations with the requirements of the tender documents, site & subsoil investigation.
The tender quantity is fixed as per drawings enclosed herewith. During execution any increase
or decrease in quantity -same will be paid as per the Tender clause.
TENDER DOCUMENTS
VOLUME-I (TECHNICAL BID)
VOLUME – II (PRICE BID)
Copy of the tender Document should be completed, legible in ink, checked in a responsible
manner. Signed stamped and returned together with the tender security Bond by the stipulate date,
this shall form the tender.
The tenderer is required to complete.
The form of tender, including the Appendices enclosed thereto, Tender security bond and the
Tender summary shall be submitted duly signed and stamped.
All the pages in which entries are required to be made by the renderer are contained in the
tender documents and the renderer shall not take out or add to or amend the text of any of. the
documents except in so far as may be necessary to comply with any issue pursuant to Clause IT .19
IT.7 EARNEST MONEY DEPOSIT.
Each tender must be accompanied by, a receipt of deposit as tender guarantee in the form of
Earnest money mentioned on relevant page. Any tender not accompanied by a tender guarantee in
the form of earnest money deposited for the sum stipulated in the tender's document will be
summarily rejected. The earnest money deposit shall be paid with the tender by B.G. / D.D. payable
at Navsari without which the tender shall not be considered as valid. EMD in the form of Bank
Guarantee of the banks approved by N MC shall also be acceptable.
(As per Annexure – 1)
Sr .No. Tender No Estimated Cost Amount of E. M. D.
The Earnest Money Deposit will be returned to the unsuccessful tenderers after an award has
been finalized.
The Earnest Money Deposit (Tender Guarantee) will be forfeited in the event, the
successful tenderer fails to accept the contract and fails to submit the "Performance Guarantee
Bonds to the Owner as stipulated in this tender documents within Fifteen days (15 days) after
receipt of notice of award of contract.
The Earnest Money Deposit of the successful tenders shall be converted in to security
Deposit amount after acceptance of the tender. Bank Guarantee shall also be acceptable for S.D.
No interest shall be paid by the owner on any tender guarantee.
IT.8 --DELETED—
IT.9 PREPARATION OF TENDER DOCUMENTS
Tenderers are required to note the following while preparing the tender documents.
Tender shall be submitted on the Tender form bound here in English. All appendices and
statements shall be properly filled in. Numbers shall be stated both in words and in figure where so
indicated and the signature of all persons signing shall be in longhand.
Percentage, Prices, wordings and notations must be in ink or type written No erasers
will be permitted. Mistakes may be crossed out and corrections typed or written in ink
adjacent thereof, and shall be checked before submission of the tenders. If there is discrepancy
between the rates quoted in figures and in words, the rates expressed in words shall be
considered as binding.
Tender shall be accompanied by the prescribed tender fee, security deposit and other
required documents and drawing. All witnesses and sureties shall be persons of status and probity
and their full names, occupation and address shall be stated below their signature.
Variation to the contract Documents requested by the tenderer may be affixed and duly
signed and stamped. Such variation may be refused by the authority is not obliged to give reason for
Submission of tenders shall comply with the notice inviting tenders as to place, date and
time. Tenders and tender security (E.M.D.) shall be enclosed with the tender documents and shall be
put in a sealed envelope.
IT. 10 SUBMISSION OF TENDER DOCUMENTS
Tenderers are requested to submit the Tender Documents on following lines. Following documents
to be submitted online as well as in physical.
i. Tender security bond (Earnest Money )
ii. Certificate as registered contractor with Government of Gujarat or appropriate authority. (Not
applicable for private sector)
iii. Tender's financial capability and standing over at least past five years.
iv. Current Income Tax Clearance Certificate.
v. Tenderer's experience in the field relevant to this contract.
vi. Tenderer's present commitments.
vii. The technical ability and qualifications of the tenderer. Details of technical personnel with their
qualification & experience.
viii. A list of the equipment the tenderer possessed and that which he proposed to acquires and use
for the purpose related to the work
ix. Tenderer should submit all the drawing which they have received along with tenders
(Architectural + Structural).
x. Bank Solvency Certificate.
xi. Labour license to be submitted
xii. Details to be submitted as per the Statement No 1 to
xiii. Price bid should be submitted by e-tender only and Technical bid should be submitted
physically also in sealed envelope systems By RPAD/Speed post/ Hand Delivery in sealed
covers in Duplicate ( One Original & One Duplicate) duly sign & seal by contractor as per
schedule given on page no. 3.The time limit for receipt of tender shall strictly apply in all
cases. The tenderers shall have therefore ensure that their tender is received by the competent
authority (NMC) at the required place before expire of the time limit. No delay on account of
any cause of receipt of tender shall be entertained. Tender's received after the time limit is over
will not be accepted and inadvertently accepted will not be opened and will be returned
unopened. Tenders which may get opened before the due date with no indication having been
given on the envelops containing a tender therein is liable to be rejected.
Mailed tender must be sent in a covering envelope by registered post, Acknowledge Due.
The return receipt will be endorsed to show the date and time of receipt. Mailed Tenders not
received at the required place before the date and time set for the receipt will not be accepted from
The tender must contain name address of residence and place of business of the person or person
submitting the tender and must be signed and sealed by the tenderer with his usual signature.
Tenders by partnership firm must be furnished with the full names and address of all partners and
be signed by one of the members the partnership or by a legally authorized representative holding
power of attorney followed by signature and designation of the person of person signing.
Tenders by corporations/company must be signed with the legal name of the corporation
companies by the president or by the secretary or other person or person legally authorized to bind
the corporation/company in the matter.
IT . 11 TENDER VALIDITY PERIOD
The validity period of the tender submitted for this work shall be of Hundred & Eighty
(180) calendar days After Last date of Tender Submission and that the tenderer shall not be
allowed to withdraw or modify the tender offer on his own during the validity period. The tenderer
will not be allowed to withdraw the tender or make any modification or addition in the terms and
conditions on his own tender .If this is done then the owner shall, without prejudice to any other
right or remedy, by at liberty to reject the tender and forfeit the earnest money deposit in full.
IT . 12 GENERAL PERFORMANCE DATA
Tenderers shall present all information which sought for in the tender document in form of
various schedules. Tenders may not be considered if every Blank and the Schedule are not properly
filled in before submission of the tender.
IT.13 SIGNING OF TENDER DOCUMENTS
If the tender is made by an individual, it shall be signed with his full name above his current
address. If the tender is made by proprietary firm, it shall be signed by the proprietor above his
name and name of his firm with his current address.
If the tender is made by a firm in partnership, it shall be signed by all the partners of the firm
above their full names and current address, or by a partner holding the power of attorney for the
firm, in which case a certified copy of the power of attorney shall accompany the tender. A certified
copy of the partnership deed, current address of all partners of the firm shall also accompany the
If the tender is made by limited company or a limited corporation, it shall be submitted duly
signed by an authorized person holding the power of attorney, & shall accompany the tender. Such
limited company or corporation may be required to furnish satisfactory evidence of its existence
before the contract is awarded.
If the tender is made by a group of firms, the sponsoring firm shall submit complete
information pertaining to each firm in the group and state along with the bid as to which of
the firms shall have the responsibility for tendering and for completion of the contract
documents and furnish evidence and responsibilities for completion of contract documents.
The full information and satisfactory evidence pertaining to the participation of each member
of the group of firm in the tender shall be furnished along with the tender.
All witness and sureties shall be persons of status and probity and their full names,
occupations and address shall be stated below their signature. All signatures in the tender document
shall be dated.
IT. 14 WITHDRAWL OF TENDERS
If during Tender validity period, the tenderer withdraws his tender, the tender security
(Earnest Money Deposit) shall be forfeited.
IT .15 INTERPRETATIONS OF TENDER DOCUMENTS
Tenderer shall carefully examine the Tender Document and fully inform themselves as to all
the conditions and matters which may in any way affect the work or the cost thereof. Should a
tendered find errors, omissions or discrepancies from the specifications or other documents or
should be in doubt as to their meaning, he should at once address query to the .City Engineer, NMC.
The correct interpretation of the same will be issued to all tenderers as addendum.
IT .16 ERRORS AND DISCREPANCIES IN TENDERS
IN CASE OF CONFLICT BETWEEN THE FIGURES AND WORDS IN THE RATES THE
RATE EXPRESSED IN WORDS SHALL BE CONSIDERED.
IT. 17 MODIFICATION OF DOCUMENTS
Modification of specifications and extension of the closing date of the tender, if required
will be made by an addendum. Copies of each addendum will be sent to all tenderers. These shall be
signed and shall form a part of tender. The tenderer shall not add to or amend the text of any of the
documents except in so far as may be necessary to comply with any addendum.
IT. 18 ADDENDUM
Addendum shall form part of the contract documents. The full consideration shall be
given to all Addenda in the preparation of tender. Tenderers shall verify the number of
Addendum issued, if any and acknowledge the receipt of all addenda (i.e. before 48 hrs. of last
date for tender on web-site) in the tender failure to so acknowledge may cause the tender to be
The Owner or the in charge may issue Addenda to advise tenderers of changed
requirements. Such addendum may modify previously issued addendum.
IT .19 G.S.T. / TAX AND DUTIES ON MATERIALS
All charge on account of G.S.T., Govt. duties, Tax etc. on material procured for the works
from any source shall be borne by the contractors.
IT. 20 EVALUATIONS OF TENDERS
In comparing tenders, the NMC shall consider factors such as the time of completion,
efficiency and reliability of construction method proposed, compliance with the specification,
relative quality, the operation, maintenance and replacement cost of structure and plant and also the
qualifying criteria for the evaluation of tenders. The price bids of only those tenderers who are pre /
post qualified will be opened in the presence of the contractors.
IT .21 TIME REQUIRED FOR COMPLETION
The completion period / time limit mentioned in this schedule is to be reckoned from the
date of issue of work order to the date by which physical completion of the work take place. The
completion period / time shall be in accordance with the calendar months.
IT .22 POLICY FOR TENDER UNDER CONSIDERATION
Tender shall be termed to be under consideration from the opening of the tender until such
time any official announcement or award is made. While tenders are under consideration, tenderers
and their representative or other interested parties are advice to refrain from contracting by any
corporation personnel or representative on matters related to the tenders under study. The NMC
representative if necessary will obtain clarification on tenders by requesting such information from
any or all the tenderers, either in writing or through personal contacts may be necessary. The tender
will not be permitted to change the substance of his tender after tenders have been opened. This
includes any post tender price revision. Noncompliance with his provision shall make the tender
liable for rejection.
IT .23 PRICES AND PAYMENTS
The tenderer must understand clearly that the prices quoted are for the total works or the
part of the total works quoted for inclusive of all costs of materials, labour, equipment, supervision,
other services, royalties. etc. and also Exclusive of G.S.T. , Govt. duties etc. No claim for payment
beyond the prices quoted for will be entertained. The tenderer will not be entitled subsequently to
make any claim on any ground.
IT .24 PAYMENT TERM
The terms of payment are defined in the General Condition of Contract. The NMC shall not
under any circumstances relax these terms of payment and will not consider any alternative
payment terms. Tenderers should therefore in their own interest note this provision to avoid
rejection of their tenders.
Award of the contract or the rejection or tenders will be made within the tender validity period stated
in the notice inviting tenders.
A successful Bidder has to deposit security deposit / Bank Guarantee within 15 days after
receiving letter of Acceptance. Time limit of work will commence from the date of issue of work
If tenderer receiving the notice of award fails or refuses to execute the contract Agreement
within the stated time limit or refuse to furnish the Bond as required herein, the owner may annual
his award and declare the tender security forfeited and will take action as deemed fit.
A corporation, partnership firm or other consortium acting as the Tenderer and receiving the
award shall furnish evidence of its existence and evidence that the officer signing the contract
agreement and Bonds for NMC, partnership firm or other consortium acting as the Tenderer is duly
authorized to do so.
IT.26 SIGNING OF CONTRACT
The successful tenderer shall be required to execute the contract agreement within 15 days
of receipt of intimation to execute the contract, failing which the NMC will be entitled to annual the
award and forfeit the Earnest Money Deposit. The person to sign the contract document shall be as
per NMC’s policy.
IT.27 DISQUALIFICATION
Even though the bidders meet the above qualifying criteria, they are subject to be
disqualified if they have,
a. Made misleading or false representations in the forms, statements,
affidavits and attachments submitted in proof of the qualification
requirements; and/or
b. Record of poor performance such as abandoning the works, not properly
completing the contract, inordinate delays in completion, litigation history, or
financial failures etc. or debarring from NMC work etc.
c. Tampered the bid document in any manner.
d. Colluded with other prospective bidders for this work to arrive at quoted
prices for the purpose of restricting competition.
e. Indulged in inducement of any official of NMC and/or their consulting
engineer and other advisors in any manner whatsoever.
f. Not submitted anti black listing affidavit stating that bidder is not black listed
by any State, Central, and Local Government Authority also any other
litigation history with all details.
g. Proposal not submitted in accordance with this tender.
h. During validity of the proposal, or its extended period, if any, the bidder
changes his commercial terms.
i. The bidder qualifies the proposal with his own conditions.
j. Proposal is received in incomplete form or without signature.
k. Proposal is received after due date and time.
l. Proposal is not accompanied by all requisite documents
m. Commercial proposal is enclosed with the same envelope as technical
n. The envelope does not show on the outside the reference of bid and thus
gets opened before the due date of opening.
o. The E.M.D. is not deposited in full and in the manner as specified in the
clause of Earnest Money Deposit.
p. The tender is in a language other than English or dose not contains its
English Translation in case of other language adopted for tender
q. The tender documents received are not duly signed by authorized person.
r. The validity of tender is less than what is stated in the tender.
s. Any of the page or pages of tender is/are removed or replaced.
t. Any condition which affect the cost.
u. If it is joint venture.
v. Each bidder shall submit only one bid per contract package either by
himself. A bidder who submits or participates in more than one bid for a
contract package will be disqualified.
IT.28 PERFORMANCE GUARANTEE & SECURITY DEPOSIT
As a contract security the tenderer to whom the award is made shall furnish a security
deposit & performance guarantee each (Security Deposit) for the amount of 5% of the contract
price to guarantee the faithful performance, completion and maintenance of the works of the
contract in accordance with all condition and terms specified herein and to the satisfaction of the
Engineers-in charge and ensuring the discharge of all obligations arising from the execution of
contract in one of the forms mentioned below.
a)In form of Demand draft of approved nationalized Bank as per Annexure – I in favor of the
Municipal Commissioner NMC amount of 5% of the Contract value as per E-l form format.
b) In form of B .G. of any nationalized bank as per Annexure – I of amount of 5% of contract
The performance guarantee shall be delivered to the NMC before Fifteen (15) days of the
completion of work under contract or as instructed by the Engineer -in-charge.
On satisfactory completion of the defect liability period in all respect, the performance
guarantee will be returned to the contractor without any interest after the defect liability period.
IT.29 STAMP DUTY
The successful tendered shall have to enter into an agreement on a non-judicial stamp
paper as per the form of the agreement approved by the NMC. The cost of stamp paper and
adhesive stamp shall be borne by the contractor.
IT .30 BRAND NAMES
Specific reference in the specification to any material by manufacturer's name, or
catalogue shall be constructed as establishing a standard or quality and performance and not as
limiting competition and the tendered in such cases, may at his option freely use only other
product, provided that it ensures an equal of higher quality than standard mentioned and meets
IT. 31 NON TRANSFERABLE
Tender documents are not Transferable.
IT .32 COST OF TENDERING
The owner will not defray expense incurred by tenderers in tendering.
IT.33 EFFECT OF TENDER
The tender shall remain Valid for a period of 180 calendar days After Last date of Tender
Submission for this work and that the tenderer shall not be allowed to withdraw or modify the offer
in his own during the period. If any tenderer withdraw or make any modifications or additions in the
terms and conditions of his own tender, than the NMC shall without prejudice to any other right or
remedy, be liberty to reject the tender and forfeit the earnest money in full.
IT .34 CHANGES IN QUANTITY OR QUALIFYING CRETERIA:
NMC reserves the right to waive any qualifying criteria or information in any tender as
special case and to reject one or all tenders without assigning any reasons for such rejection and also
to vary the quantities of items or group or quantum of work as specified in the schedule of prices as
may be necessary in the interest of Public work a large for which no any claim shall be entertained.
IT .35 NEW EQUIPMENT AND MATERIAL
All materials, equipment and spare parts thereof shall be new, unused and originally coming
from manufacturer's plant to the NMC. The rebuilt or overhauled equipment/materials will not be
allowed to be used on works
IT.36 RIGHTS RESERVED
The owner reserves the right to reject any or all tenders, to waive any informality or
irregularity in any tender without assigning any' reason. The owner further reserves the right to
withhold issue of work order even after agreement and no payment will be made to the successful
tenderer on account of such withholding. The owner is not obliged to give reasons for any such
Municipal Commissioner Reserves right to increase / decrease the scope of work & also
split the tender in two or more contracts without assigning any reason even after the work is
IT .38 MOBILIZATION ADVANCE
No Mobilization Advance or advance on Machinery will be given.
The scope of work is clearly mentioned in the tender documents. The contractor shall have
to carry out the work in accordance with the details specifications. No condition will be accepted.
The conditional tender will liable to be rejected.
The contractor will have to construct shelter for storing valuable materials like cement etc.
The contractor shall arrange for construct, maintain and afterwards remove and reinstate any
temporary access required for and in connection with the execution at the work at his own cost.
Reinstatement shall include restoring the area of the access route to at least the degree of safety
stability drainage & appearance that existed before the contractor entered the site.
In the event of any discrepancy the following order or precedence should apply
(a) Dimension & quantity
(1) Tender form
(3) Specification
On drawing; figures dimension unless previously incorrect will be followed in preference to select
(b) Description
(1) Tender form
(3) Specification
In case of defective description as ambiguities, due Engineer in-charge should issue further
instruction and direction in what manners the work is to be carried out. The contractor should
further within comply with such instruction.
Irrelevant mistakes, discrepancies or errors made through over sight leading to
misunderstandings may be got corrected properly by the City Engineer.
The contractor shall take no advantage of any apparent error or omission in drawing as
description or specification. The Engineer-in-charge shall make such correction as may be
necessary to fulfill intent of specification plan.
Proper procedure shall have to be taken by contractor at all the time during the progress of
the work, failing which the contractors shall be held responsible for all damages to the work under
execution or to any property or to lives of persons during the work in progress and also during the
defect liability period.
All work shall be measured by standard method according to rules & customs of NMC. The
engineer-in-charge decisions to what is usual method in use will be final.
Tender once accepted shall be binding on the contractor even if the formal agreement is not
signed / executed.
The contractor shall have to give in writing the date of completion of work within a
fortnight from date of work completed by him otherwise the date noted on record by department
shall be reckoned as final & no excuse as representation in that behalf shall be granted at later
IT –46 Specimen signature of contractor will be cross checked whenever contractor receives
payment in account section of NMC OR in case of representative of contractor receives payment
along with letter of authority of contractor who sign an agreement.
The details / contents / information mentioned in the tender document may be
read as final binding on the contractors. Any difference found in Form B-1 in regards to
these related items may be treated as cancelled
Contractor should make arrangement to cordon the construction site by way of
proper supports and barricades at his own cost and risk as per the direction of EIC.
Contractor should provide safety net and should take sufficient precaution for the
safety of their staff & labour, NMC’s staff, NMC-MET’s staff, student, TPI’s staff and
Consultant’s staff at his own cost and risk.
IT 54 Valuation of Variations
a.) The basis for the valuation of variations for addition to the Contract Price shall be as follows
in the same order of priority.
b.) Contract unit rates for individual items shall apply to varied quantities where there is a
quantity variation.
c.) In case of other non-tender items following procedure shall apply.
If any extra item crops up during the progress of work the same shall be carried out by the
Contractor and he shall be paid at the rate fixed by Add. City Engineer which shall be fixed as of
the rates derived by rate analysis based on the following three methods.
(i) Based on approved BOQ item rates of Govt. SOR 2023-24 plus or minus contractor’s
tender premium or rebate as the case may be.
(ii) Based on prevailing Govt. of Gujarat’s SOR rates.
(iii) Rate analysis based on current market rates. This shall be based on
• The material costs, the labour costs, the cost of use of all plant, machinery and equipment,
the cost of all temporary and incidental works, the overheads and the Contractors profit.
• For Market rate analysis, the overheads shall be taken at 5 % of the sum of material costs,
the labour costs, and the cost of use of all plant, machinery and equipment, the cost of all
temporary and incidental works.
• For Market rate analysis, the Contractors profit shall be taken at 10 % of the sum of material
costs, the labour costs, the cost of use of all plant, machinery and equipment, the cost of all
temporary and incidental works, the overheads.
e.) The Engineer shall determine provisional rates and prices to enable on account payments to be
included in the Interim Payment Certificates, until rates and prices are agreed as final by the
Employer, the Contractor and the Engineer.
f.) The Contractor shall not be entitled to additional payment for costs, which could have been
avoided by giving early warning.
Signature/Stamp of Contractor Additional City Engineer, (West Zone)
Navsari Municipal Corporation
NAVSARI MUNICIPAL CORPORATION
Tender form B-1
FORM B-1 OF GUJARAT STATE ROADS AND BUILDING DEPARTMENT /
WATER RESOURCES DEPARTMENT may be referred.(only English version)
Note binding on the contractors
01. The terms and conditions of contract mentioned in the Clause no 1 to 77 of Form B-1
of Gujarat State Road and Building Department / Water Resources Department shall
be applicable. Binding on the contractors unless specifically mentioned about it
hereunder in clause no.15 to
02. Please read “Navsari Municipal Corporation “instead of “Government / Government of
Gujarat “wherever written.
03. Please read “Navsari Municipal Corporation “ instead of “ Government of Gujarat State
Public Works Department/Public Works Department/ Government “ wherever written.
04. Please read “City Engineer" instead of “Superintending Engineer “or Executive
Engineer wherever written.
05. “Navsari Municipal Corporation “herein called as “NMC “
06. “Governor for the state of Gujarat “shall be read as “Municipal Commissioner / Navsari
Municipal Corporation”
07. The contents / details / information mentioned in the relevant point under the heading
08. The contents / details / information mentioned in the relevant point under the
heading “NOTICE INVITING TENDERS” may be read as under-
Point No 1 may be read as: Tenders are invited by Municipal Commissioner ,NMC for the
work of : PROPOSED VEGETABLE MARKET, OF NAVSARI MUNICIPAL CORPORATION
Point No.3 : The class of contractor shall be as per Memorandum of Works in Brief.
The Cl. No. 14.2, 21, 38, 60, 69, 73, 74, 75 shall be read as deleted.
09. The contents / details / information mentioned in the relevant point under the
heading “ADDITIONAL INSTRUCTIONS TO PERSONS TENDERING”
shall be read as under-
Point No .2.1 may be read as per the details mentioned in the tender notice
10. DECLARATION FORM & DECLARATION CERTIFICATE are given
separately in Tender Document and it shall be applicable.
11. TENDER FOR WORKS to be read as given in tender documents / Tender Form.
12. MEMORANDUM to be read as per the details given in tender notice
13. The contents / details / information mentioned in the following CLAUSE under
the heading “TERMS AND CONDITION OF CONTRACT” shall be read as
Point no.1 may be read as “All works proposed to be executed by the contractor shall be
notified in tender documents placed on NMC’s web site – www. egovnmc.com ”
Point no. 4&8 may be read as deleted and to be read as per details in tender documents.
13. TENDER FOR WORKS to be read as given in tender documents / Summary of Price
MEMORANDUM to be read as per the details given in tender notice
The contents / details / information mentioned in the following CLAUSE under the
heading “TERMS AND CONDITION OF CONTRACT” may be read as under-
Clause 1: Security Deposit: to be read as per the details given separately in the tender
Clause2:Liquidated Damages fordelay:
75, & 77 may be read as deleted in the form B-1.
CLA USE 30 and CLAUSE 60 may be read as under:
CLAUSE 30: DISPUTE TO BE REFERRED TO TRIBUNAL:
DISPUTE TO BE REFERRED TO ARBITRATOR.
(1) The disputes relating to this contract, so far as they relate to any of the following
matters, whether such disputes arise during the progress of the work or after the
completion or abandonment thereof, shall be referred an independent Arbitrator
appointed by NMC as far possible in consultation with the agency if it is necessary
and such disputes shall be settled in accordance with the arbitration and conciliation
(i) The rates of payment under clause 5 for any tools, materials and stores, in or
upon the works of the site thereof or belonging to the contractor or procured
by him and intended to be used for execution of the work or any part thereof
possession of which may have been taken by the Engineer-in-charge under
the said clause –5.
(ii) The reduction in rates made by the Engineer-in-charge under clause 9 from
the items of works not accepted as completed fully in accordance with the
sanctioned specifications.
(iii) The rate of part of payment for any class of work which is included in the
additional or altered work carried out by the contractor in accordance with
the instructions of the Engineer-in-charge under clause 14 and the rates for
which is to be determined under the said clause
(iv) The rates of payment for materials already purchased or agreed to be
purchased by the contractor before receipt of notice given by the Engineer-
in-charge under clause 15 and/or amount of compensation payable to the
contractor under the said clause for loss in respect of such materials.
(v) The amount of compensation which the contractor shall be liable to pay
under clause 17 in the event of this failure to rectify, remove or reconstruct
the work within the period specified in the written intimation or the amount
of expenses incurred by the Engineer-in-charge under the said clause17 in
rectifying, removing or re-executing the work or in removing and replacing
the materials or articles complained of.
(vi) The reduction of rates as may be fixed by the Engineer-in-charge under
clause 17 for the inferior work or materials as accepted or made use of.
(vii) The amount of compensation payable by the contractor for damages as
estimates and assessed under clause
(viii) The amount payable to the contractor for the work carried out under clause
33 in accordance with the instructions and the requirement of the Engineer-
in-charge in case where there are no specifications.
2. The awards declared by the arbitrator shall be speaking award giving reasons and
calculations to every item of claims. The decision will have to be implemented by all
3. In case of dispute leading to the contractor or Navsari Municipal Corporation
approaching on Court of Law. It shall be within the jurisdiction where the site of work
The reference to arbitration proceeding under this clause shall not:
i) Entitle the contractor to stop the Affect the right of the Engineer-in-charge under
clause 5 to take possession of all or any tools, plants, materials and stores in or
upon the works of site thereof belonging to the contractor or procured by him and
intended to be used for the execution of the work or any part thereof.
ii) Preclude the Engineer-in-charge from utilizing the materials purchased by the
contractor in any work or from removing such materials to other places, during
the period the work is stopped or suspended in pursuance, of notice given to the
contractor under clause
iii) Progress of the work or the carrying out the additional or altered work in
accordance with the provisions of clause 14 or as the case may be, of clause
Seal and Signature of the Bidder City Engineer
Date: Navsari Municipal Corporation
NAVSARI MUNICIPAL CORPORATION
FORM OF BID AND APPENDIX TO BID
FORM 1 - BID SECURITY (BANK GUARANTEE)
(Hereinafter called the Tenderer) is desirous and preferred to tender for works in
accordance with the term and conditions of tender for the work
1. Therefore. We hereby affirm that -we are guarantors on behalf of the Tenderer up to total
rupees………………..(in words............................................) Rs. (in figures) and we
undertake to pay to Municipal Commissioner, NVASARI MUNICIPAL CORPORATION
, NAVSARI. Specified tip to his first written demand, without demur without delay and
without the necessary of a previous of judicial or administrative procedures and without the
necessity of a previous of judicial or administrative procedures and without the necessity to
prove to the Bank the defects or short comings or debits of the contractor any sum within
2. We further agree that the Guarantee herein contemned shall remain in full force and
effect during the period that would be taken for the acceptance of tender. However unless a
demand of claim under this guarantee is made on its in writing on or before the (Date to be
specified will not be less than 210 days from the stipulated date of receiving the tender) we
shall be discharge from all liabilities under the guarantee thereafter
3. We undertake not to revoke the guarantee during it currency except with the previous
consent of the Municipal Commissioner, NAVSARI MUNICIPAL CORPORATION , A'
bad in writing.
4. We lastly undertake not to revoke the guarantee for any charge in constitution of the
Tenderer or of the Bank.
Signature & Seal of Guarantor...........................
5. The contractors shall have to furnish income tax clearance certificate before his tender is
accepted and intimate assessment number and ward under which he is assessed.
6. Copies of certificate as regards previous experience, if any, must accompany the tender.
7. List of approved banks - .As per Annexure-1.
Seal and Signature of the Bidder Addi. City Engineer
Date: NAVSARI MUNICIPAL CORPORATION
FORM -2 PERFORMANCE GUARANTEE BOND
(BANK GUARANTEE)
(Clause 37 of Section I Volume 1)
Awarded a contract dated_ __________________for the : CONSTRUCTION OF
UTTAR BHARTIYA SAMAJ SHANESHWAR RAMNAGAR BHAVAN AT VIJALPORE IN
NAVSARI MUNICIPAL CORPORATION UNDER M.P GRANT YEAR 2025-26.
as specified in the tender by the NAVSARI MUNICIPAL CORPORATION .
Whereas the said M/s __________________________________________has approached
PERFORMANCE GUARANTES BOND to the NMC for the work undertakes by M/s.
________________________ and Whereas. We, the
_____________________________Bank have agreed to provided such a
PERFORMANCE GUARANTEE BOND. Now therefore, we the_
______________________Bank provided the following Performance Bank, Guarantee by
way of these Bond to the NMC.
1. The contract value of the contract provided to M/s. _____________________by the
NMC in Rs. _ __________. This guarantee in the nature of PERFORMANCE
GUARANTEE is provided so as to ensure and indemnify the NMC for full and proper
performance of the contract by M/s.______________________
the _______________________________Bank hereby indemnify the NMC for all losses
and / or damages to the New Construction which would be Rectify by
M/s.________________________ and such PERFORMACE GUARANTEE would include
any damage to the New Construction because of defective products, poor workmanship, or
at all, by way of this bond, we the _________________________________Bank agree and
promises that in the eventuality of the contractors M/s.
__________________________________________not repairing or remedying the
Problem, loss or damage to the New Construction we shall indemnify and pay the NMC
such expenses, losses and damages that may be incurred by the NMC, as a result of the
NMC getting the work done itself or from the other source.
2. We _______________________________ Bank agree and understand that the decision
as to whether any losses or damages to the project have taken place or not and / or whether
the work suffers from poor workmanship or not will be taken by the Commissioner of
NMC and on the Commissioner's decision regarding such losses or damages or defect
whatsoever being so notified by the NMC to us, We shall immediately take steps and
ensure that M/s.__________________________________ faithfully and diligently carry
out the necessary remedial steps to the full satisfaction of the Commissioner of the NMC.
The opinion of the Commissioner as to whether full and complete remedial steps, to the full
satisfaction the Commissioner of the NMC has been taken or not, will be that of the NMC.
For the purpose, of arriving at such decision as aforesaid it will be open to the
Commissioner of the NMC in case he so desires, to delegate this power to subordinate like
the city Engineer to take appreciate decision and the decisions referred to above will be
deemed to be properly take and as if taken by the Commissioner of the NMC. In the
eventually of M/s.______________ not taking remedial action to the almost
satisfaction of the Commissioner of NMC. The NMC will be entitled to get the work done
itself or from sources. On the Commissioner of the NMC notifying to us the total expenses
incurred for this purpose. We hereby expressly have under taken to pay the NMC the said
amount forth with and in any case not less than 7 days from taken to pay the NMC the said
binding the amount indicted by the Commissioner of the NMC and our obligation to pay
such amount will be continuing of the NMC and our obligation irrespective of any dispute
of differences that may arise between us and M/s. _____________________________ of
3. The contract value is Rs. __________________________. This PERFORMANCE
GURANTEE is limited to 3% of the said contract value and accordingly it comes to Rs.
_______________________ our liability will be in all cases be limited to
4. We agree and undertake that this PERFORMANCE GURANTEE will be valid for a
period of Twelve month from the date when the contract work is completed by the
M/s._____________________________________. The Commissioner of the NMC notify
such completion that to us. In case, no such completion it is notified, this performance
guarantee will be a valid for ____MONTH from the date of execution of this agreement.
The Performance Guarantee will come into effect from such completion date. In case
however, the contract of several parts it will be opened to the Commissioner to indicate
separate completion dates for separate part and to simultaneously indicate a breakup of the
contract value equivalent to the separate part. In which case the PERFORMANCE
GUARNATEE to extent of the different completion dates. It is expressly understood that
the considering this period of ____MONTH, the date by which the Corporation, intimate
the Bank about the losses, damages or problems as the case may be, shall be considered as
long as such intimation is within a period of Twelve month from the completion date. We
the ___________________ Bank will be liable, irrespective of whether the remedial actions
or lack thereof has taken place after the period of the ____MONTH.
5. We _________________________________ Bank agree that the PERFORMANCE
GUARANTEE which is continuing guarantee will be binding, and enforceable against us
irrespective of any difference / disputes between the NMC and M/s.
and irrespective of any change or variation or execution time or any forbearance or waiver
made or grant by the NMC to M/s.___________________________________.
6. In case any disputes arise as to the interpretation or implementation or implementation of
this PERFORMANCE GUARANTEE, the matter shall be referred to the sole arbitration of
the Commissioner of NMC whose decision in the matter will be final. In case any resource
to any court of law is necessitated, the appropriate Civil Court in the NAVSARI along will
have Jurisdiction.
Date: Signature of Contractor
FORM 3 - FORM OF AGREEMENT
THIS AGREEMENT made the ____ day of _______, 200_ between NAVSARI Municipal
Corporation ………………..(here in after called “the Employer”) of the one part and
__________________________ (here in after called “the Contractor”) of the other part.
WHEREAS the Employer is desirous that certain works should be executed by the
____________________________________________ and has accepted the bid by the
contractor for the execution and completion of such works and the remedying of any
defects therein at a contract price of Rs.______________ (Rupees _________________
NOW THIS AGREEMENT WITNESSETH as follows:
1. In this Agreement, words and expressions shall have the same meanings as are
respectively assigned to them in the Conditions of Contract hereinafter referred to.
2. The following documents shall be deemed to form and be read and construed as part of
this Agreement, viz.:
a) the Letter of Acceptance;
b) the General Conditions
c) The Financial Condition
d) the Technical Specifications;
e) the Priced Bill of Quantities; and
f) other documents forming part of the contract.
3. In consideration of the payments to be made by the Employer to the Contractor as here in
after mentioned, the Contractor hereby covenants with the Employer to execute and
complete the Works and remedy any defects therein in conformity in all respects with the
provisions of the Contract.
4. The Employer hereby covenants to pay the Contractor in consideration of the execution
and completion of the Works and the remedying of defects therein the Contract Price or
such other sum as may become payable under the provisions of the Contract at the times
and in the manner prescribed by the Contract. IN WITNESS whereof the parties hereto
have caused this Agreement to be executed the day and year first before written.
Signed, sealed, and delivered by the said Employer and the Contractor in the presence
On behalf of NAVSARI MUNICIPAL On behalf of M/s.
Binding Signature of the Employer :
Binding Signature of the Contractor :
Sample Form for updating - qualification information
NAVSARI MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT
GENERAL CONDITION
1. Contractor shall produce the relevant registration certificate of NMC / State Govt /Central
2. Contractor shall register the work to labour commissioner as per labour act.
3. Contractor shall not sub-let the work without permission of the authority
4. Contractor should have sufficient skilled and unskilled laborers so that he shall start work at
different sites simultaneously. Contractor's having labour force available during festivals
shall only apply. Contractor cannot stop the work due to on Un availably of labor force.
5. Price escalation for Cement & T.M.T .steel shall be Applicable.
6. No Advance payment / machinery advance will be paid.
7. Payment of running bill will be made as per recent N.M.C. policy in force.
8. No extra payment will be made due to increase of central / state Govt. Taxes.
9. If the work is not completed within time limit the penalty will be recovered from immediate
bills of contractors.
10. If the material i.e. MH cover C.C block etc. supplied from Municipal Corporation store then
contractor shall not claim for any extra rate for non-execution of such item, partly/fully.
11. In the specifications, "as directed"/"Approved" shall be taken to mean, "as
directed"/approved" by the Engineer-in-charge.
12. Wherever a reference to any Indian Standard appears in the specifications, it shall be taken
to mean as a reference to the latest edition of the same in force on the date of agreement.
13. In "Mode of Measurement" in the specifications wherever a dispute arises in the absence of
specific mention of a particular point or aspect, the provisions on these particular points, or
aspects in the relevant Indian Standards shall be referred to.
14. All measurements and computations, unless otherwise specified, shall be carried out nearest
to the following limits:
(i) Length, width and depth (height)------- 0.01 Meter.
(ii) Areas -----0.01 Sq. Mt.
(iii) Cubic Contents ------0.01 Cu.Mt.
15. The distance, which constitutes lead, shall be determined along the shortest practical route
and not necessarily the route actually taken. The decision of the Engineer-in-charge in this
regard shall be taken as final.
16. Where no lead is specified, it shall mean "all leads"
17. Lift shall be measured from plinth level.
18. Definite particulars covered in the items of work, though not mentioned or elucidated in it,
specifications shall be deemed to be included there in.
19. Reference to specifications of materials as made in the detailed specification of the items of
work is in the form of a designation containing the number of the specification of the
material and prefix 'M' e.g. 'M-5'.
20. Approval to the samples of various materials given by the Engineer-in-charge shall not
absolve the contractor from the responsibility of replacing defective material brought on
site or materials used in the work found defective at a later date.
21. The contract rate of the item of work shall be for the work completed in all respects.
22. No collection of materials shall be made before it is got approved from the Engineer-in-
23. Collection of approved materials shall be done at site of work in a systematic manner.
Materials shall be stone at site of work in a systematic manner. Materials shall be stored in
such a manner as to prevent damage, deterioration or intrusion of foreign matter and to-
ensure the preservation of their quality and fitness for the work.
24. Materials, if and when rejected by the Engineer-in-charge, shall be immediately removed
from the site of work within 24 hours.
25. No materials shall be stored prior to, during and after execution shall be kept in sufficient
numbers and in good working condition on the site of the work.
26. All works shall be carried out in workmanlike manners per the best techniques for the
particular item.
27. All tools, templates, machinery and equipment for correct execution of the work as well as
for checking lines, levels, alignment of the works during execution shall be kept in
sufficient numbers and in good working condition on the site of the work.
28. The mode, procedure and manner of execution shall be such that it does not cause damage
or over loading of the various components of the structure during execution or after
completion of the structure.
29. All necessary safety measures and precaution (including those laid down in the various
relevant Indian Standards) shall be taken to ensure the safety of men, materials and
machinery on the works as also of the work itself.
30. Contractor will have all types of report register which given below,
a) Progress register
b) Cement & steel register
c) Daily work register
31. Contractor has to put on site Notice board showing Information of Work as per City
Engg. Circular No.7 (4-2-2013)
Seal and Signature of the Bidder Addi. City Engineer
Date: NAVSARI MUNICIPAL CORPORATION
10. Information / Details to be submitted by the Tenderers
In the Performa mentioned under Statement no 1 to
I/We hereby declared that I/We am/are not partner(s) blacklisted or connected with firm
blacklisted in any states, CPWD / MES / Railways or any Government, Semi-Government or
Private body. In case of Non Register With NMC, The Bidder has to get register
within 3(Three) month after receiving work order.
At present I/We am/are registered as approved contractor (s), firms in any state, CPWD /
MES / Railways.
We, the partners/owners of this firm, hereby give an undertaking that we are jointly and
severally responsible to meet all the liabilities ever and above the business of this firm and make
good the above financial loss sustained by the Navsari Urban Development Authority as a
result of out abandoning the works entrusted to us.
I / We further declare that my / our near relatives are not working in NMC as an Addl.
C.E., Dy. C.E., A.C.E., A.E., T.S. as on today.
Signature/Stamp of Contractor Additional City Engineer,
NAVSARI Municipal Corporation
APPLICABILITY OF PROVIDENT FUND AND MISCELLANEOUS PROVISIONS
Successful bidder i.e. the agency whose tender is accepted by the NMC shall have to
comply the necessary formalities under the employees provident fund and Miscellaneous
Provisions Act, 1952 as Contributory Provident Fund Scheme is applicable to labourers
engaged in construction activity and shall have to submit proofs regarding deduction of
provident fund and other dues and depositing the same with government department under
the act and the scheme regularly on monthly basis failing which no running / final bill
payment will be made by the NMC to the contractor in any circumstances.
A certificate to the above effect has to be given by the contractor as under.
Depositing Provident Fund contribution
This to certify that we have deducted the employees’ P.F. and deposited the same along
with employer’s contribution towards provident fund on labour charges / wages paid by us to
the labourers engaged for the work of _______________ with
Authority under our Provident Fund Code No.
We produce herewith the copies of the challans for the provident fund deduction and
contribution deposited as mentioned above.
Signature/Stamp of Contractor Additional City Engineer,
NAVSARI Municipal Corporation
STATEMENT NO. –3
CURRICULAM VITAE
Details of person
3. Qualifications
4. Experience in Project Related field
5. Other experiences
6. Employment Record.
Sr.No. Period Organization Status /position in
From - To under which the organization
1) Separate sheet for each person to be furnished as above.
2) The contractor’s Project Team should consist of persons in the following disciplines.
a)Senior Engineer with experience of Building work
b) Senior material Engineer.
c)Senior Quantity Surveyor.
d)Project management expert. Site in charge
Signature/Stamp of Contractor Additional City Engineer,
NAVSARI Municipal Corporation
INFORMATION REGARDING FINANCIAL CAPACITY OF THE CONTRACTORS.
Sr. No. Details Amount (Rs. in Lacs) Remarks
1. Solvency . A Banker’s Certificate
May please be attached.
2. Annual Turnover
for the last three
3. Price of biggest
Signature/Stamp of Contractor Additional City Engineer,)
NAVSARI Municipal Corporation
STATEMENT NO. – 4/A
BIDDER’S FINANCIAL CAPACITY
Sr. No. Financial Year Annual Turnover in Net worth Net Cash
Engineering Project Rs. Rs.
1) Figures to be taken from audited balance sheets.
2) Copies of the balance sheet to be attached.
3) Separate sheets should be provided for each member of the consortium.
4) The bidder shall have to provide that for a period of at least 4 months the bidder has
ability to sustain negative cash balance and how he proposes to meet with the same.
5) Cash Plan / Cash flow Statement.
Signature/Stamp of Contractor Additional City Engineer,
NAVSARI Municipal Corporation
AVAILABLE BID- CAPACITY
executed in Rs.
The available bid capacity will be worked out as follows. Available bid capacity = (A x N x
A= Average value of Civil engineering works executed of last five years ending 31-03-2024
B= Value at 31-03-2024, Price level of existing commitments and ongoing works to be
completed during the next two years.
N= Number of years prescribed for completion of the works for which the bids are invited.
The statement showing the value of existing contracts and commitments and ongoing works as
well as stipulated period of completion remaining for each of the works listed should be
countersigned by the engineer-in-charge.
Signature/Stamp of Contractor Additional City Engineer
NAVSARI Municipal Corporation
STA TEMENT NO. –
L I S T OF B U I L D I N G WORKS
COMPLETED DURING THE LAST SEVEN YEARS.
contact Total of Date of
Sr. Year of Name Date of
person of cost work Actual
No. Construct- of starting
the project, of the done completion
ion work Project work
address, work Rs. of work
Note: Certificate from the owners in support of above works may be enclosed with this statement.
Signature/Stamp of Contractor Additional City Engineer,
NAVSARI Municipal Corporation
STATEMENT NO. – 5/A
DETAILS OF ONGOING PROJECT AS ON 31-03-2024
Sr. Name of Value of Start date Likely date of Name, address,
No project remaining work completion telephone, fax
on 31.03.2024 no. of project
Rs. in lakhs. authority and
contact person.
Signature/Stamp of Contractor Additional City Engineer
NAVSARI Municipal Corporation
CONTRACT LOST BY PARTY EVEN WHEN CONTRACTOR’S PRICE IS LOWEST (IN INDIA)
Sr. Details of Project Actual contract Period Reasons for rejection by the Name,
No. (start date– end date ) Remarks address,
known to the bidder on his rejection phone
Signature/Stamp of Contractor Additional City Engineer,
NAVSARI Municipal Corporation
STATEMENT NO. –
DETAILS OF PROJECTS UNDER LITIGATION / ARBITRATION
Sr. Name of Value of the Reasons for
No. Project Location Project Rs. litigation/arbitration
Note: The bidder shall furnish separate table for individual project.
Signature/Stamp of Contractor Additional City Engineer,
NAVSARI Municipal Corporation
STATEMENT NO.-8
DETAILS OF PLANT & MACHINERY TO BE DEPLOYED ON THIS WORK
Name of the contractor/company ____________________________________________
Sr. Name of Nos. Nos. proposed Present Present value
No plants/machinery available to be location of plant/
(with make deployed for machineries
& year) this project
Plant / machineries which are proposed to be procured shall have to be procured at the earliest
after award of the work and before the start of the work
Signature/Stamp of Contractor Additional City Engineer,
NAVSARI Municipal Corporation
METHOD STATEMENT AND WORK PLAN
The Bidder shall have to provide a brief write up to be enclosed with the “Technical Bids“
covering his approach and methodology to handle the project construction activities including
his details work plan. The brief shall include the following aspects.
Sr. No. Components
2. Construction equipment availability and plan
3. PERT / Construction chart / Bar chart.
4 Manpower Resource
Signature/Stamp of Contractor Additional City Engineer
NAVSARI Municipal Corporation
Material & Technical Specifications
Standard norms for quality control as per IS
Sr Test Frequency of tests Acceptance Criteria
a) Setting time initial 50 -100 T- 2 sample Not less than 30 minutes
final 100-200 T-3 sample Not more than 600 minutes
200-300 T-4 sample
500- 800 T-6 sample
b) Fineness by Sieve 1 in 5 samples 90% passed from 90 micron sieve
c) Consistency One sample Above 30 percent
(Each sample as
d) Compressive strength One sample 160 kg / cm2 for OPC & PPC on third day
(Each sample as
220 kg / cm2 for OPC & PPC on seventh day
310 kg / cm2 for OPC & PPC on twenty eight day
e) Fineness test through 1 in 5 samples 2250 kg/Cm2 and above for OPC FOR PPC
Specific surface kg/Cm2
f) Chemical Analysis 1 in 5 samples Mgo less than 6 percent
IS 4032-986 SO3 less than 2.75 percent
less on ignition upto 5 percent
a) Silt Content 1sample of 10 kg Up to 3 percent
b) Fineness modulus - Do- Specification as per specified standard. No sand of
fourth zone shall be used.
3 Kapachi - Grit for
Bituminous work
a) Gradation 1/200 m3
b) Flakiness index 1/200 m3 Max 30 %
c) Impact 1/100 m3 Max 30 %
d) Abrasion 1/100 m3 Max 35 %
e) Bit. Extraction 100 MT - 1 0.80 to 4 %
f) Bitumin (penetration 100 MT -
g) Stripping value 50 -100 m3 one test Max. 25 %
3 Kapachi - Grit for
Building work As per IS 183-1970 standards
a) Gradation 2 test / Season As per relevant specifications provision
b) Impact 2 test / Season wearing surface overlaid surface (IS18.5-1972)
c) Abrasion 2 test / Season 30 % 5%
d) Soundness 2 test / Season Loss with Loss with
a) Efflorescence 20 bricks out of Moderate
32 bricks out of
Sr Test Frequency of tests Acceptance Criteria
50 bricks out of
b) Water absorption -DO- Less than 20 Percent
c) Compressive strength -DO- Minimum average 35 Kg/cm2 & individual result may
fall below up to 20 percent
5 Cement Concrete
flooring/Mosaic
a) Water absorption 6 tiles /2000 tiles Maximum 10 percent
b) Transverse strength 12 tiles /2000 tiles Wet Dry
c) Abrasion 6 tiles /2000 tiles Average wear shall not exceed 3.5 mm
6 Water Chemical Once for approval
Analysis source
b) Chlorides " 2000 mg/L (PCC) & 500 mg/L for RCC
c) Organic (matter) " 200 mg/L Max.
d) Inorganic (matter) " 3000 mg/L Max.
e) Sulphate (mg/L) " 500 mg/L Max.
f) TDS " 2000 mg/L Max.
7 Cement Concrete As per IS 456-2000 Grade Specified characteristic cube
cubes ordinary and designation compressive strength.
controlled concrete At 28 days N/mm2
work m3 No. of M10
add sample for each M40
50 m3 part there of
ordinary and suces /60m3 each for Average compressive strength of each day should not
controlled concrete 7 and 28 days further be less than specified strengths subject to that 20%
for road bridge that every day for cubes per day (i.e.) 1 per 5 may fall below specified
first six days and strength up to its 85 percent.
once in three days
a) TMT bars 1 test / 40MT Fe-500 Quenched and Tempered (TMT) bars of
different diameters satisfying IS : 1786, with Yield
stress > 500 N/mm2 , Tensile strength > 545 N/mm2
And elongation more than 12%
b) steel for general Gr.A Fe410 WS 410 N/mm2
structural purpose (All size)
specification IS 2062- Gr.B. Fe410 WB 410 N/mm2
1992 (All size)
c) steel wires for 8.0 140 Kg/mm2
prestressed consete IS 7.0 150 Kg/mm2
1785 part-1 19 lab 5.0 160 Kg/mm2
85 % the minimum specific tensiled strength
9 Teakwood As per LOT
Sr Test Frequency of tests Acceptance Criteria
e) Moisture cement
10 All Other Material As suggested by
Consultant/EIC/ TPI
as per relevant IS
1) Tests as may be directed by Engineer in charge as shown above shall have
to be conducted
2) Above mentioned all the tests of the materials and others shall be carried
out for in construction of each and every different lot in Government
Approved laboratory.
3) NMC / PMC / TPI may ask Contractor to Carry out Additional Laboratory
Test for any of the Above Items if Required. The Cost of such testing shall be
borne by the Contractor.
Signature/Stamp of Contractor City Engineer,
NAVSARI Municipal Corporation
GENERAL MATERIAL SPECIFICATIONS FOR BRAND NAMES TO BE USED FOR
THE EXECUTION WORKS
SCHEDULE OF MAKE FOR CIVIL WORK
CEMENT (OPC/PPC) - 53 Grade : As Per (IS Code No 12269 :1987 And IS Code No
3812 : 2003)Ultratech , Siddhi, JK , Hathi , Ambuja,
Binani, Sanghi only. Samples of cement arranged by the
Contractor shall be taken by the Engineer-in-Charge and
got tested in accordance with provisions of the relevant
BIS codes. In case test results indicate that the cement
arranged by the Contractor does not conform to the
relevant BIS codes, the same shall stand rejected and shall
be removed from the site by the Contractor at his own cost
within three days.
TMT REINFORCEDMENT : As per IS-456:2008(reaffirmed
2004).TATA,SAIL,Vizag,Electrotherm or As approved
by engineer in charger with proper testing report. The
Contractor shall have to obtain and furnish test certificates
to the Engineer-in-Charge in respect of all supplies of
steel brought by him to the site of work. Samples shall
also be taken and got tested by the Engineer-in- Charge as
per the provisions in this regard in the relevant BIS codes.
In case the test results indicate that the steel arranged by
the Contractor does not conform to BIS codes, the same
shall stand rejected and shall be removed from the site of
work within three days.
BRICK : Compressive strength Avg. 35 KG. Per sq.CM.
SAND : As per Mix design for concrete work or zone-II.
For Masonary and plaster work zone – III
COURSE AGGREGATE : Approved quarry with testing report.
FINISHING /PAINT:
ACRYLIC EMULSION PAINT : ASIAN,BURGER,NEROLAC or equivalent as
approved by competent authority
EXTERIOR PAINT : ASIAN,BURGER,NEROLAC or equivalent as approved
by competent authority
TEXTURE EXTERIOR PAINT : REVA, NOVA, ASIAN or equivalent as approved by
competent authority
HERITAGE SURFACE
TEXTURE : BAKELITE HYLAM or equivalent as approved by
competent authority
SYNTHETIC ENEMAL : ASIAN,BURGER,NEROLAC or equivalent as approved
by competent authority
ANTI-INSECT PAINT : PEDILITE or equivalent as approved by competent
VITRIFIED GRANAMITE TILES : BONZER ,ASIAN, EURO, JOHNSON , SOMANY
SUN HEART or equivalent as approved by competent
GLAZED AND CERAMIC TILES : BONZER,SUNHEART, ASIAN, EURO, SOMANY,
KAJARIA Simero or equivalent as approved by
WALL TILES : BONZER , SUN HEART , ASIAN , SOMANY,
KAJARIA, Simero or equivalent as approved by
PAVER TILES : VYARA, or equivalent as approved by competent
PLYWOOD/BLOCK BOARD : Century, Green ply, Kitply, Durian, Duro or
equivalent as approved by competent authority
COMMERCIAL GRADE
LAMINATES : Green lam, Formica, Sundek, Veer or Equivalent Make
As Approved By Consultant / Engg. Incharge 1 mm. thick
for horizontal & vertical surfaces in Matt / Glossy Finish
WOOD (VISIBLE) : Ghana Teak , Nigeria Teak , Burma Teak wood or
BORDER PATTY : Ghana Teak , Burma Teak Wood or equivalent
(HIIDEN AND NOT VISIBLE) : C.P. Teak Wood , Nigeria Teak or equivalent
STEEL DOOR WINDOW GRILL : AGEW, STEEL PLAST or equivalent
ALLUMINIUM : JINDAL/HINDALCO/ or equivalent as approved by
competent authority aluminum sections with anodized
coating of approved shade.
ACP : Flexi Bond, Aluco Bond or equivalent make as approved
by competent authority
POLYMER BONDING : FOSROC, ROFF, BASF, SIKKA, Dr. FIXIT or
equivalent as approved by competent authority
POLYPOPYLENE FIBER
REINFORCEMENT: : FOSROC, ROFF, BASF, SIKKA, ZUPA or
equivalent as approved by competent authority
GLASS : Modiguard /Saint Gobain/HGS Plain Float Glass or
equivalent as approved by competent authority
HINGES, STOPPERS, KNOBS,
HANDLES : SS matt fixtures to be approved by competent authority
SCREWS : Nettle fold or equivalent as approved by competent
LOCKS : Godrej or equivalent as approved by competent authority
ADHESIVES : Fevicol / Vamicol
ROOFING : Proflex or equivelent
All the Material to be approved by the Competent Authority and tested if needed as per latest
relevant IS, prior to execution the work Material not mentioned in above list should confirm to
latest relevant IS revision
Signature of Contractor City Engineer,
Date NAVSARI Municipal Corporation
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Vol-1_part_A_Tender_Document PDf.pdf
Notice_Inviting_Online_tender.pdf
Download all tender documents and submit your bid