Loading…
Loading…
Tender Value
₹14.2 L
EMD Value
₹29,000
Closing Date
3 Oct 2026, 4:00 pm6d left
Executive Engineer REW Kargil
Executive Engineer REW Kargil
Construction of Additional Classroom at MS Gramthang
2026_RDD_19609_4
e-Tender- 24 of REW Kargil UTL of 2026-27
Open Tender
Civil Works - Others
Percentage
Kargil
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
Executive Engineer REW Kargil
₹29,000
Yes
24 Sept 2026
24 Sept 2026
5 Oct 2026
24 Sept 2026
3 Oct 2026
25 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation by manual means in foundation trenches or drains (not exceeding 1.5m in width or 10sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.ALL KIND OF SOIL 40% | 3.97 | CUM | 526.11 | ₹2,088.66 |
| 2 | ORDINARY ROCKS 30% | 2.98 | CUM | 1,164.03 | ₹3,468.81 |
| 3 | HARD ROCKS (BP) 30% | 2.98 | CUM | 2,374.71 | ₹7,076.64 |
| 4 | Providing and laying stone soling hand packed | 2.55 | CUM | 830 | ₹2,116.5 |
| 5 | Providing and laying in position cement concrete of specified grade including the cost of centering and shuttering - All work up to plinth level :1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 12 | CUM | 8,155.18 | ₹97,862.16 |
| 6 | Providing and laying in position specified grade of reinforced cement concrete, including the cost of centering, shuttering, finishing and reinforcement- All work
up to plinth level : | 3.06 | CUM | 11,277.66 | ₹34,509.64 |
| 7 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, including cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm
nominal size) | 2.38 | CUM | 13,100.73 | ₹31,179.74 |
| 8 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window
sills, staircases and spiral stair cases above plinth level up to floor five level, including the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size). | 5.09 | CUM | 13,630.96 | ₹69,381.59 |
| 9 | Providing and fixing up to floor five level precast cement concrete solid block, including hoisting and setting in position with cement mortar 1:3 (1 cement : 3 coarse sand), cost of required centering, shuttering and carriage complete: 1:3:6 (1 Cement: 3 coarse sand(zone-III) : 6 graded stone aggregate 20 mm nominal size). | 17.83 | CUM | 16,651.55 | ₹2,96,897.14 |
| 10 | Providing woodwork in frames of doors,windows,clerestory windows and other frames,wrought framed and fixed in position with holdfast lugs or with dash
fastener sof required dia & length (hold fast lugs or dash fastener shall bepaid for separately). Second class kail wood. | 0.35 | CUM | 1,20,151.54 | ₹42,053.04 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.08 MB
BOQ_46382.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .