Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance GRAM EVAM PO LAUDI NAUNAGARIDHAR ZILA TEHRI GARHWAL UTTARAKHAND | NAUNAGARIDHAR | TEHRI GARHWAL | UTTARAKHAND | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Not Admitted-Fee/PreQual/Technical/Finance | Not Admitted-Fee/PreQual/Technical/Finance Not qualified for AOC |
Tender Value
₹63 L
EMD Value
₹1.3 L
Closing Date
5 Nov 2020, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer, 9th Circle, PWD, Dehradun
Superintending Engineer, 9th Circle, PWD, Dehradun
Construction of kyari - kachata to Mehasasha motor road Vidhansabha Chakrata. Distt Dehradun under state sector. ( Part II KM 0.00 to 1.500 )
2020_pwd_26701_1
1544/Nivida, Dated 01-10-2020
Open Tender
Civil Works - Roads
Item Rate
270 days
kyari - kachata to Mehasasha motor road
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,720
Executive Engineer, Temp. Div., PWD, Sahiya
₹1.3 L
6 Nov 2020
13 Oct 2020
6 Nov 2020
13 Oct 2020
5 Nov 2020
23 Oct 2020
120 days
Amount
Excavation for Structures Earthwork in excavation for structures as per drawing and technical specificationsClause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. Including cost of all material labour T & P etc
Providing concrete for plain/ reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Nominal mix 1:3:6
Random Rubble Stone Masonry laid in 1:6 cement and sand mortar, in breast walls, retaining walls, parapets, scuppers, etc. including supply of all material, labour,T&P and royaltiies etc. complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203 of MORD Specifiction
Hand Packed stone filling in back of wallls including cost of all materials,royality, T&P etc. complete as per direction of Engineer-in- charge. (As per PWD Uttarakhand specifications)
Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 R.C.C M 25 Height upto 5m including cost of all material labour T & P etc
Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202.(The reinforcement steel shall be procured from original (primary) steel producersas per clause no. 2011.3.1 of MORD specifications (First Revision'2014) and IS1786:2008 clause no. 1.6) including cost of all material labour T & P etc
Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specifications PCC Grade M25 in water way Using concrete Mixer including cost of all material labour T & P etc
Random Rubble Stone Masonry laid Dry, in breast walls, retaining walls,etc. including supply of all material, labour, T&P and royaltiies etc.complete as per drawing and technical specifications Clauses 702, 704,1202 & 1203 of MORD Specifiction
Concrete with cement, coarse sand and 40 mm gauge stone ballast in proportion1:4:8 in foundations and floors including supply of all material, labour and T&P etc.required for proper completion of the work. as per drawings and technical specifications Clause 802, 803, 1202 & 1203
Cement plum Masonry with 40% plum & 60% 1:3:6 cement concrete including supply of all material, labour, T&P etc. required for proper completion of the work. as per drawings and technical specifications Clause 802, 803, 1202 & 1203 of MORD Specifiction
Making Super Elevation including Filling and Making Cooli walling with approved materials deposited at site from road way cutting and excavated from drain and foundation of other structure graded and compacted to meet requirement to complete work. including cost of all material labour T & P etc
WBM Grading 1 Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 1 as per Technical Specification By Manual Means including cost of all material labour T & P etc
INDAR SINGH CHAUHAN
MAHIPAL SINGH
Sumit Chauhan
stage.html
html • 0.31 MB
finance_31589.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .