| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹19.6 Laccepted-aoc | ₹19.6 L | accepted-aoc |
Tender Value
₹20.3 L
EMD Value
₹20,335
Closing Date
30 May 2026, 4:00 pmClosed
Executive Engineer, RWS&S Division, Adoni
Adoni
Special Repairs to the Dilapidated OHSR of CPWS Scheme to Kowthalam of Kurnool District
936794
TO/15/2026-27 dated 16.05.2026 of the Executive Engineer, RWS&S Division, Adoni
OPEN - NCB
Similar Work
KURNOOL
8 documents required · 8 mandatory
₹720
₹20,335
14 Jun 2026
25 May 2026
25 May 2026
Centring and scaffolding charges for RCC members including all materials and labour charges for forming and dismantling for Column and braces to Elevated OHSR 9.75 Mts staging
Dismantling of all loose Particals by chipping manually including Scaffolding, cost, conveyance and all labour charges to Elevated OHSR 9.75 Mts staging
Removing fungus by Iron Brushing, Blowing and water washing adding with HCC ALL DIRT FREE to be done for neat and clean Surface Preperation to entire surface, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc., complete for finished item of work to Elevated OHSR 9.75 Mts staging
Applying of Rust remover to exposed Iron Bars and Iron Brushed after 4 Hrs for Removing Rust to entire surface thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc., complete for finished item of work to Elevated OHSR 9.75 Mts staging
Applying HCC Zinc Rich Primer to Exposed Bars to Protect from Corrosion and aerrozen for protecting from rust, including cost of chemicals and conveyance of all materials to work site and all operational, incidental, labour charges etc., complete for finished item of work for all columns and braces of 200KL, 9.75Mts staging OHSR
Openining the all cracks by cutting mechine, blowing and filled the same(crack area) with Chemical putty and fixed the grouting nozzles is along the cracks after cutting the holes after thourughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work to Elevated OHSR 9.75 Mts staging
Anchoring the Iron bars with Polyster resion grout and Cutting hole with drilling mechine removing/clearing dust with blowyer, mixing resion grout two parts, filling hoses with above mix and instr the required size of shear connectors upto required depth including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work to Elevated OHSR 9.75 Mts staging
Plastering with Polymer repair Mortar system with two types. (a) Applied Highbond - AR mixing with cement on entire surface of the column and braces(for bonding cement polymer mortor). (b) Plaster CM(1:3), 20mm thick and mixed with Rerock-S, Highbond SBR for entire surface of the column and brace including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work to Elevated OHSR 9.75 Mts staging
Injection grouting/pressure grouting with Concrete-grout Epoxy Pourable crack/by gap filling grout system. The Epoxy tobe injected with gouting mechine here NC thinner tobe used to operating the pump without and hurdils. For filling hollow and gaps(cracks) in the concrete columns and braces. Cutting the nozzels and filling the hole with Epoxy putty including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work to Elevated OHSR 9.75 Mts staging
Painting to new walls with two coats of acrylic interior emulsion paint having VOC (Volatile Organic Compound) content less than 50 grams/ litre of approved brand and shade over a base coat of appropriate primer of approved brand, making three coats in all to give an even shade after throughly brushing the surface to remove all dirt and remains of loose powdered materials including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc., complete., for finished item of work as per SS 911 for Internal walls (APSS No: 912)
M30 grade concrte using 20mm HBG metal including cost and conveyance of all material, labour charges, centering etc., complete but excluding cost of steel and its fabrication charges for top dome to Elevated OHSR 9.75 Mts staging
M30 grade concrte using 20mm HBG metal including cost and conveyance of all material, labour charges, centering etc., complete but excluding cost of steel and its fabrication charges for Columns to Elevated OHSR 9.75 Mts staging
M30 grade concrte using 20mm HBG metal including cost and conveyance of all material, labour charges, centering etc., complete but excluding cost of steel and its fabrication charges for Braces to Elevated OHSR 9.75 Mts staging
Cost of steel and its fabrication charges incl., bending, cost of binding wire etc., complete for Braces,Columns and Top dome to Elevated OHSR 9.75 Mts staging
Galvanized sheets (SSR Sl.No:69)Dimensions & Nominal Mass of Medium Quality Steel Tubes as per IS for Ladder to Elevated OHSR 9.75 Mts staging
Supply & Delivery and Fixing of 100 mm GI B Class pipe as per IS 1239 specifications excluding earth work excavation including cost of Pipe and its specials and all labour charges etc., complete, except GI bends, unions, GI connectors with checkout and socket TATA or Zenith make or equivalent to Elevated OHSR 9.75 Mts staging
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
BOQ.xlsx
TENDER_DOCUMENT • 0.01 MB
NIT.doc
TENDER_DOCUMENT • 0.03 MB
VOL 1 Part A.doc
TENDER_DOCUMENT • 0.16 MB
Vol-Part-B (No change).doc
TENDER_DOCUMENT • 0.20 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .