Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 LAccepted-AOC VILL BAROTA JATTAN P O BERI RAJDIYA TEHSIL SADAR DISTT BILASPUR HP | ₹1.1 L | L1 | Accepted-AOC Lowest Bidder |
| 2 | Rejected-Technical C O GK POWER TECH ENTERPRISES VILL DOKRU PO ROHAL TEHSIL JHANDUTTA DISTT BILASPUR H P | - | - | Rejected-Technical Rejected |
| 3 | Rejected-Technical MANDI HIMACHAL PRADESH | - | - | Rejected-Technical Rejected |
Tender Value
₹1.1 L
EMD Value
₹2,843
Closing Date
19 Mar 2026, 11:00 amClosed
Sr. Executive Engineer
Sr. Executive Engineer, Electrical Division , HPSEBL, Bilaspur.
Tender for Aug. of 63 KVA 11/0.4 KV to 100 KVA S/Stn Bharathu Ist at Bane in (E) Section Ghagus under Electrical Sub-Division No.I HPSEBL Bilaspur
2026_HPSEB_131407_1
70/2025-26
Open Tender
Electrical Works
Percentage
90 days
Bilaspur
Please refer Tender documents.
4 documents required · 4 mandatory
₹590
Yes
₹2,843
Yes
31 Mar 2026
12 Mar 2026
19 Mar 2026
12 Mar 2026
19 Mar 2026
12 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Material Part of Aug of 63 to 100 KVA S/Stn (TS No.73/2024-25) (WBS No. 321000235-001-BLP-S/S-130) | - | - | - | - |
| 1.02 | LT Energy meter 3-ɸ, 4 wire CToperated Static Tri-Vector meter withBox(CT-100/5Ameter (CT-100/5A) | 1 | No | 15,675 | ₹15,675 |
| 1.03 | Aluminium Thimble | 16 | Nos | 42 | ₹672 |
| 1.04 | Alluminium Thimble 200 Amp | 4 | Nos | 472 | ₹1,888 |
| 1.05 | Aluminium Paint | 4 | Ltr | 366 | ₹1,464 |
| 1.06 | Prov Pipe earthing Set | 1 | Set | 1,528 | ₹1,528 |
| 1.07 | Chain Link Fencing, Angle Iron, Gate etc. for transformer fencing | 1 | Job | 61,503 | ₹61,503 |
| 1.09 | Erection Part of Aug of 63 to 100 Kva S/Stn (TS No. 73/2024-25) (WBS No. 321000235-001-BLP-S/S-130) | - | - | - | - |
| 1.1 | Erection of 100 KVA 11/0.4 KV Transformer , erection of ST Pole, Painting of Pole, erection of stay, transformer earthing, LT Penal Box, Energy meter ,LT Cable including loading and unloading Transformer complete in all respect | 1 | job | 28,311 | ₹28,311 |
| 1.11 | Dismentlement charges for 63 KVA transformer | 1 | job | 2,672 | ₹2,672 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_194264.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.70 MB
BIDDocument70.pdf
Tender Documents • 0.39 MB
BOQ_194264.xls
BOQ • 0.28 MB
70.pdf
PDF • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .