| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.1 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹9.2 L+₹11,868.91 (1.31%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹9.4 L+₹33,926.51 (3.74%)Rejected-AOC | L3 | Rejected-AOC L3 | |
| 4 | L4₹9.6 L+₹54,154.62 (5.97%)Rejected-AOC | L4 | Rejected-AOC L4 |
Tender Value
₹12.7 L
EMD Value
₹31,770
Closing Date
1 Apr 2025, 1:00 pmClosed
Assistant Executive Engineer
O/o Office of the Assistant Executive Engineer, Irrigation Sub Division III Chittoor
GENERAL WP CADA 2024 2025 Modernization of Field channel offtakes from ch 02 500 km of Chalai LBC Canal in between ch 0 000Km to 0 350 km 1408 2024 General Civil Work
2025_Irrig_754545_1
IRR/PI/TR/1408/2024_5_1_1/1
Open Tender
Civil Works - Canal
Item Rate
180 days
Walayar
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹31,770
Yes
20 Jun 2025
25 Mar 2025
3 Apr 2025
25 Mar 2025
1 Apr 2025
25 Mar 2025
Amount
Field Channels
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
4.1.6:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size)
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
13.16.1:6 mm cement plaster of mix:1:3 ( 1 cement : 3 fine sand)
manoj.k (BID ID -2183207)
BIJU. K (BID ID -2183705)
SURESH M (BID ID -2183137)
Bidder Name
BIJU. K
manoj.k
S.Sadasivan Nair
SURESH M
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1225133.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .