| 1 | L1₹7.9 CrAdmitted-Finance AT KASHIPUR PO KENDUJHARGARH DIST KENDUJHAR STATE ODISHA PIN 758001 | KENDUJHARGARH | KENDUJHAR | ODISHA | 758001 | +4.99% | ₹7.9 Cr | L1 | Admitted-Finance |
| 2 | L2₹8.2 CrAdmitted-Finance | +8.13% | ₹8.2 Cr | L2 | Admitted-Finance |
| 3 | Rejected-Technical AT CHHAMUNDA PO CHHAMUNDA PS TELKOI DIST KEONJHAR STATE ODISHA PIN 758084 | CHHAMUNDA | KEONJHAR | ODISHA | 758084 | - | - | - | Rejected-Technical As per decision of tender evaluation committee. |
Tender Value
₹7.6 Cr
EMD Value
₹7.6 L
Closing Date
11 Feb 2026, 4:00 pmClosed
Circle Officer
Circle Office Keonjhar
Improvement such as widening and strengthening of Telkoi - Bimala - Petraghati - Raisuan - Kaliahata road from 0/000 km to 18/800 km except from 0/300 km to 0/775 km in the district of Keonjhar under State Plan for the year 2021-22. Balance Work
2026_EICCL_125138_1
CCEKC-19/205-26
Open Tender
Civil Works - Roads
210 days
Keonjhar
5 documents required · 5 mandatory
₹10,000
₹7.6 L
Yes
O/o CCEKC Keonjhar
6 Apr 2026
28 Jan 2026
12 Feb 2026
28 Jan 2026
11 Feb 2026
28 Jan 2026
28 Jan 2026 - 6 Feb 2026
6 Feb 2026
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth upto 300mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable materials to be used or auctioned upto a lead of 1000metres including removal and disposal of top organic soil not exceeding 150mm in thickness as per Clause 201 of MoRT&H Specifications for Road & Bridge works (5th Revision) & including cost, conveyance, taxes, cess,royalties of all materials, cost of all labour, T&P required for the work etc. complete as per specification & direction of Engineer-in-charge.
Earthwork in excavation for foundation of structures in soil by mechanical means with 0.9 Cum bucket capacity Hydraulic Excavator including setting out, Construction of sharing and bracing, removal of stumps and other deleterious Materials dressing of sides & bottom and backfilling with approved material complete in all respect as per approved drawing and technical specifications as per Clause 301 of MoRT&H Specifications for Road & Bridge works (5th Revision) & including cost, conveyance, taxes, cess,royalties of all materials, cost of all labour, T&P required for the work etc. complete as per specification & direction of Engineer-in-charge.
Scarifying and removing the existing bituminous road surface to the required depth as per approved drawing and technical specifications and disposal of scarified materials within all lifts and lead upto 1000mtr. complete in all respect as per Section 900, Clause 305.4.3, 305.8, 305.9.5, 501.8.3.2, 501.8.7.2 and 501.8.8.1 of MoRT&H Specifications for Road & Bridge works (5th Revision) & including cost, conveyance, taxes, cess,royalties of all materials, cost of all labour, T&P required for the work etc. complete as per specification & direction of Engineer-in-charge.
Reworking the scarified bituminous surface suitably after supplementing the base materials with sand and compacting finished surface as per approved drawing and technical specifications as per Section 900, Clause 501.8.3.2 and 501.8.8.1 of MoRT&H Specifications for Road & Bridge works (5th Revision) & including cost, conveyance, taxes, cess,royalties of all materials, cost of all labour, T&P required for the work etc. complete as per specification & direction of Engineer-in-charge.
Loosening to a depth of 150mm, leveling and compacting original ground supporting embankment /sub-grade as per approved drawing and technical specifications complete in all respect as per Section 900 and Clause 305 of MoRT&H Specification for Road & Bridge works (5th Revision) & including cost, conveyance, taxes, cess,royalties of all materials, cost of all labour, T&P required for the work etc. complete as per specification & direction of Engineer-in-charge.
Construction of embankment with approved materials deposited at site from road-way cutting and foundation excavation of other structures with all lifts and leads, graded and compacted to meet requirement as per approved drawing and technical specifications complete in all respect as per Section 900 and Clause 305 of MoRT&H Specification for Road & Bridge works (5th Revision) & including cost, conveyance, taxes, cess,royalties of all materials, cost of all labour, T&P required for the work etc. complete as per specification & direction of Engineer-in-charge.
Construction of embankment with approved materials obtained from borrow pits by mechanical means, graded and compacted to meet requirement as per approved drawing and technical specifications complete in all respect as per Section 900 and clause 305 of MoRT&H Specification for Road & Bridge works (5th Revision) & including cost, conveyance, taxes, cess,royalties of all materials, cost of all labour, T&P required for the work etc. complete as per specification & direction of Engineer-in-charge.
Fine dressing, providing and laying turfing with live sods of perennial turf forming grass on embankment slope, verges or other locations including preparation of ground, fetching of sods with all lifts & leads upto 5 Km. and watering complete in all respect as per approved drawing and technical specifications as per Section 900 and Clause 307 of MoRT&H Specifications for Road & Bridge works (5th Revision) & including cost, conveyance, taxes, cess,royalties of all materials, cost of all labour, T&P required for the work etc. complete as per specification & direction of Engineer-in-charge.
Construction of granular subbase by providing close graded granular subbase Grading-VI material (hard granite crusherbroken) as per Table 400-2,satisfying all physical,chemical properties of Granular subbase material (road aggregate), spreading in uniform layer with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired denisity complete as per clause No.401 and section 900 of MoRT&H specification for Road & Bridge works(5th Revision) including cost, conveyance, taxes, cess,royalties of all materials, cost of all labour, T&P required for the work etc. complete as per specification & direction of Engineer-in-charge.
Providing Wet Mix Macadam using crushed stone aggregates as per approved drawing and technical specifications complete in all respect as per Section 900 and Clause 406 of MoRT&H Specifications for Road & Bridge works (5th Revision) & including cost, conveyance, taxes, cess,royalties of all materials, cost of all labour, T&P required for the work etc. complete as per specification & direction of Engineer-in-charge.
Providing and applying primer coat with medium setting bitumen emulsion on prepared surface of granular base, including clearing road surface and spraying primer @ 0.60 Kg/ Sqm using mechanical means as per approved drawing and technical specifications complete in all respect as per Section 900, Clause 501.5.2 & 502 of MoRT&H Specifications for Road & Bridge works (5th Revision) & including cost, conveyance, taxes, cess,royalties of all materials, cost of all labour, T&P required for the work etc. complete as per specification & direction of Engineer-in-charge.
Providing and applying Tack Coat with medium setting bitumen emulsion on the prepared bituminous/ granular surface including cleaning with mechanical broom and spraying bitumen emulsion @ 0.20 Kg/ Sqm using mechanical means as per approved drawing and technical specifications complete in all respect as per Section 900, Clause 501.5.2 & 503 of MoRT&H Specifications for Road & Bridge works (5th Revision) & including cost, conveyance, taxes, cess,royalties of all materials, cost of all labour, T&P required for the work etc. complete as per specification & direction of Engineer-in-charge. a) For Road Work
b) For Mastic Asphalt Work
Providing & laying compacted Bituminous Macadam (Grading-II ) using 60/70 (VG-30) penetration grade Bitumen with Hot Mix Plant using crusher broken hard granite aggregates of specified grading premixed with bituminous binder @ 3.3 % by weight of total mix and filler, transporting the hot mix to works site, lying with Hydrostatic Paver Finisher with Sensor Control to the required grade, level and alignment, rolling with Smooth Wheeled, Vibratory and Tandem Rollers to achieve the desired compaction as per Clause No.106, 108, 111, 112, 501, 503 , 504 and section 900 of specifications for Road and Bridge works of Ministry of Road Transport & Highways (5th Revision) & including cost, conveyance, taxes, cess,royalties of all materials, cost of all labour, T&P required for the work etc. complete as per specification & direction of Engineer-in-charge.
Providing and laying compacted Semi Dense Bituminous Concrete (Grading-II) with Batch type Hot Mix Plant using crushed stone aggregates of specified grading, premixed with bituminous binder of 60/70 (VG-30) penetration grade of bitumen, and filler transporting the hot mix to work site, laying with a Hydrostatic Paver Finisher with Sensor Control to the required grade, level and alignment, rolling with Smooth Wheeled, Vibtratory and Tandem Rollers to achieve the desired compaction as per approved drawing and technical specifications complete in all respect as per Section 900, Clause 501 & 508 of MoRT&H Specifications for Road & Bridge works (4th Revision) & including cost, conveyance, taxes, cess,royalties of all materials, cost of all labour, T&P required for the work etc. complete as per specification & direction of Engineer-in-charge.
Providing and laying 25 mm thick Mastic Asphalt Wearing Course with paving grade bitumen meeting the requirments given in table 500-29, prepared by using mastic cooker and laid to required level and slope after cleaning the surface, including providing antiskid surface with bitumen precoated fine grained hard stone chipping of 12.2 mm nominal size @ 0.005 cum per 10 sqm and at an apporoximate spacing of 10cm center to center in both directions, pressed into surface when the temperature of surfaces is not less than 100 dehree centigrade, protruding 1 mm to 4mm over mastic surface all complete as per Clause 515 of MoRT&H Specifications for Road & Bridge works (5th Revision) & including cost, conveyance, taxes, cess,royalties of all materials, cost of all labour, T&P required for the work etc. complete as per specification & direction of Engineer-in-charge.
Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse hard granite crusher broken aggregate (Using Branded Cement) and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per Table 600.1,cement content not to be less than 150kg/cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10Mpa at 7 days, mixed in a Batching Plant, transported to site, laid and compacting with vibratory roller, finishing and curing as per Clause 601 and section 900 of MoRT&H Specifications for Road & Bridge works(5th Revision) including cost, conveyance, taxes, cess,royalties of all materials, cost of all labour, T&P required for the work etc. complete as per specification & direction of Engineer-in-charge.
Construction of un-reinforced,dowel jointed, plain cement concrete pavement M-35 grade (using branded cement) over a prepared sub base using 43 grade Cement not less than @ 400kg / cum with 20mm and down grade hard granite (crusher broken) aggregate and fine aggregate conforming to IS 383) over a prepared sub base , mixed in concrete mixer as per approved mix design, transported to site, laid , spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, admixtures as approved, curing compound, dowel bar, tie bars etc as required for the work, finishing to lines and grades as per drawing and as per Clause 602 and section 900 of MoRT&H Specifications for Road & Bridge works (5th Revision) including cost, conveyance, taxes, cess,royalties of all materials, cost of all labour, T&P required for the work etc. complete as per specification & direction of Engineer-in-charge.
Supplying and fixing of 80mm thick cement concrete interlocking paver block of M-40 grade of approved make, design, colour and size made by Block making machine with proper compaction laid in required pattern etc complete in all respect conforming to IRC SP-63:2018 including cost, conveyance, taxes, cess, royalties of all materials, cost of all labour, T&P required for the work etc. complete as per specification & direction of Engineer-in-charge
Providing and fixing R.C.C. (M-15) (using Branded Cement) Guard Posts of 1.00metre height and 15 cm diameter including cost of steel reinforcement for finished item of work as per approved drawing and technical specifications complete in all respect as per Section 800, 900, 1000, 1500, 1600 & 1700 of MoRT&H Specifications for Road & Bridge works (5th Revision) & including cost, conveyance, taxes, cess,royalties of all materials, cost of all labour, T&P required for the work etc. complete as per specification & direction of Engineer-in-charge.
Providing & fixing RCC M-15 grade (Using Branded Cement) Ordinary Km. Stone along with reinforcement for finished item of work as per drawing as per IRC -25 / 1967 & IRC-8-1980 fixed in position including finishing, lettering and painting as per approved drawing and technical specification complete in all respect as per Clause No. 805 & Section 800, 900, 1000, 1500, 1600, 1700 of MoRT&H specification for road & bridge works (5th Revision) & including cost, conveyance, taxes, cess,royalties of all materials, cost of all labour, T&P required for the work etc. complete as per specification & direction of Engineer-in-charge. a) 5th Km Stone
b) Hectometer Stone
c) Ordinary Km Stone
Providing road marking with Hot Applied Thermoplastic Compound 2.5mm thick including reflectorising glass beads@250gms per sqm area , thickness of 2.5mm is exclusive of surface applied glass beads as per IRC:35.The finished surface to be level, uniform and free from streaks and holes etc. for finished item of work as per approved drawing and technical specification complete in all respect as per Section 900 and Clause 803 of MoRT&H specification for road and bridge work (5th Revision) & including cost, conveyance, taxes, cess,royalties of all materials, cost of all labour, T&P required for the work etc. complete as per specification & direction of Engineer-in-charge.
Providing and erecting a W metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 811 of specifications for Road and Bridge works of Ministry of Road Transport & Highways (5th Revision) & including cost, conveyance, taxes, cess,royalties of all materials, cost of all labour, T&P required for the work etc. complete as per specification & direction of Engineer-in-charge.
Providing and fixing of Retro-Reflectorised Cautionary, Mandatory and Informatory Sign Board as per IRC:67 made of high intensity grade sheeting vide Clause No. 801.3 of specifications for Road and Bridge works of Ministry of Road Transport & Highways (5th Revision) fixed over aluminium sheeting, 1.5mm thick supported on a mild steel angle iron post 75mm x 75mm x 6mm , firmly fixed to the ground by means of properly designed foundation with M-25 grade cement concrete 45cm x 45cm x 60cm, 60cm below ground level as per approved drawing & including cost, conveyance, taxes, cess,royalties of all materials, cost of all labour, T&P required for the work etc. complete as per specification & direction of Engineer-in-charge. i) 90cm Equilateral triangle
ii) 80cm x 60 cm Facility Information Signs
iii) 60cm x 50 cm Chevron
iv) 90cm high Octagon
v) 60 cm circular
vi) Hazard Marker
vii) Route Marker Signs
Removing all type of Hume Pipes upto 600mm to 900mm dia and Stacking within a lead of 1000 metres including Earthwork and Dismantling of Masonry Works including T&P, sorting the dismantled material, disposal of unserviceable material as per Clause 202 of MORT&H Specifications for Road & Bridge works (5th Revision) & including cost, conveyance, taxes, cess,royalties of all materials, cost of all labour, T&P required for the work etc. complete as per specification & direction of Engineer-in-charge. a) Above 600 mm to 900 mm dia
Dismantling of Cement Concrete Grade M-15 & M-20 including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres etc. complete as per Clause No. 202 of Section 200 of MoRT&H Specifications for Road & Bridge works (5th Revision) including cost, conveyance, taxes, cess,royalties of all materials, cost of all labour, T&P required for the work etc. complete as per specification & direction of Engineer-in-charge.
Earthwork in excavation for roadway in ordinary rock by mechanical means with 0.9 Cum bucket capacity Hydraulic Excavator including cutting and loading in tippers, transporting to embankment site within all lifts and lead upto 1000m, trimming bottom and side slopes in accordance with requirment of lines, grades and cross sections complete in all respect as per approved drawing and technical specifications as per Clause 301 of MoRT&H Specifications for Road & Bridge works (5th Revision) & including cost, conveyance, taxes, cess,royalties of all materials, cost of all labour, T&P required for the work etc. complete as per specification & direction of Engineer-in-charge.
Providing and laying Plain cement concrete of grade M-15 (Using Branded Cement) in foundation for levelling course in Toe Wall etc complete as per drawing and technical specification using High Strength approved quality Cement and coarse granite aggregate conforming to Table 1000-1 with formwork as per Section 900,1000,1500,1700 & 2100 of specifications for Road and Bridge works of Ministry of Road Transport & Highways (5th Revision) & including cost, conveyance, taxes, cess,royalties of all materials, cost of all labour, T&P required for the work etc. complete as per specification & direction of Engineer-in-charge. a) Foundation for Box Culvert, Drain, Toe wall
Providing P.C.C M-20 (Using Branded Cement) grade with 40mm and down grade hard granite (crusherbroken) aggregate including hoisting and laying in open foundation/substructure of Abutment,Pier,Wing wall/ Return wall, Cutoff wall,Rigid Apron, Toe Wall etc. of C.D. work or in places as shown in the drawing as per approved drawing & section 900,1000,1500, 1700,2100,2200,2300 of MoRT&H specification for Road & Bridge works (5th Revision) including dewatering, centering and shuttering, cost, conveyance, taxes, cess,royalties of all materials, cost of all labour, T&P required for the work etc. complete as per specification & direction of Engineer-in-charge. a) Foundation of Box Culvert, Toe wall
Providing R.C.C M-25 grade (Using Branded Cement) with 20mm and down grade hard granite (crusher broken) aggregate and fine aggregate conforming to IS 383) in abutment, wing wall/ return walll, pier,dirt wall, etc. of C.D. works / Box Cell Culverts as per approved drawing and Section 900,1000,1500,1700,2100,2200, 2300 of MoRT&H Specifications for Road & Bridge works (5th Revision) including dewatering, centering and shuttering, cost, conveyance, taxes, cess,royalties of all materials, cost of all labour, T&P required for the work etc. complete as per specification & direction of Engineer-in-charge. a) Foundation of Box Culvert, Raft, Key, Return wall
b) Sub Structure of Box Culvert Wall, Middle wall, Hunch, Return wall
c) Super Structure of Slab Kerb wall
Supplying steel i.e. Tor Steel / HYSD Bars conforming IS-1786 including straightening, cutting, bending, binding, welding and jointing if necessary and tying the grills and placing in position as required for R.C.C. Work and providing fan hooks as required, hoisting, lowering, laying including cost, conveyances, taxes tor steel and binding wires of 18 to 20 gauge and labour required for the work for bending, binding and tying the grills in all floors with labour cess etc. (Linear measurement will be taken and quantity will be calculated on standard weight of tor steel / HYSD bars for all heights) complete as per specification & direction of Engineer-in-charge.
Providing and laying of Filter Media with stone crushed aggregates(black hard granite (crusher broken) aggregate) of 45 mm size satisfying the requirements laid down in clause 2504.2.2. of MoRT&H specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment , wing wall and return wall to the full height compacted to a firm condition complete as per drawing and section no 900,2500 of MoRT&H specification for Road & Bridge works (5th Revision).including cost, conveyance, taxes,cess, royalties of all materials, cost of labour, T&P required for the work etc. complete as per specification & direction of the Engineer - in- Charge
Construction of Reinforced cement concrete crash barrier of M-40 grade (Using Branded Cement) with HYSD reinforcement confirming to IRC-21 and dowel bars 25mm dia, 450mm long at expnasion joints filled with premoulded asphalt filler board, keyed to the structure on which it is built and installed as per design given in the enclosure of MOST Circular No. RW-NH-33022-1-94-DO-III dtd.24 June 1994 as per dimension in the approved drawing and location as per Clause 811 of MoRT&H specifications for Road & Bridge works (5th Revision) including cost, conveyance, taxes, cess, royalties of all materials, cost of all labour, T&P required for the work etc. complete as per specification & direction of Engineer-in-charge.
Gravel backing to Aprons, Revetments and providing filter material using gravel underneath pitching in slopes as per approved drawing and technical specifications complete in all respect as per Section 900, 1000 & 2500 of MoRT&H Specifications for Road & Bridge works (5th Revision) including cost, conveyance, taxes, cess,royalties of all materials, cost of all labour, T&P required for the work etc. complete as per specification & direction of Engineer-in-charge.
Rough stone dry packing in Aprons and Revetments and Stone Pitching in slopes etc with hard granite stone of size 30 cm and above as per approved drawing and technical specifications complete in all respect as per Section 900, 1000, & 2500 and Clause 2504 of MoRT&H Specifications for Road & Bridge works (5th Revision) including cost, conveyance, taxes, cess,royalties of all materials, cost of all labour, T&P required for the work etc. complete as per specification & direction of Engineer-in-charge.
Providing Weep Holes in abutment, wing wall, retaining wall, toe wall and RCC drain etc with 100mm dia A.C. pipe as per approved drawing and technical specifications complete in all respect as per Section 2200 & Clause 2706 of MoRT&H Specifications for Road & Bridge works (5th Revision) including cost, conveyance, taxes, cess,royalties of all materials, cost of all labour, T&P required for the work etc. complete as per specification & direction of Engineer-in-charge.
Providing and laying R.C.C M-30 grade in wearing coat excluding cost of steel reinforcement for finished item of work as per approved drawing and technical specifications complete in all respect as per Section 900, 1000, 1500,1600, 1700 2200 & 2700 and clause no. 2702 of MoRT&H specifications for Road & Bridge works (5th Revision) & including cost, conveyance, taxes, cess,royalties of all materials, cost of all labour, T&P required for the work etc. complete as per specification & direction of Engineer-in-charge.
Providing and fixing Drainage Spouts in deck slab with 1.00m long and 100 mm diameter G.I pipe for finished item of work as per approved drawing and technical specifications complete in all respect as per section 2700 & Clause 2705 of MoRT&H Specifications for Road & Bridge works (5th Revision) including cost, conveyance, taxes, cess,royalties of all materials, cost of all labour, T&P required for the work etc. complete as per specification & direction of Engineer-in-charge.
Painting two coats with Synthetic Enamel Paint of approved quality and shade on any elevation, kerb, guard post and other structures etc for the finished item of work as per technical specifications complete in al lrespect as per Section 800 of MoRT&H Specifications for Road & Bridge works (5th Revision) including cost, conveyance, taxes, cess,royalties of all materials, cost of all labour, T&P required for the work etc. complete as per specification & direction of Engineer-in-charge.
Providing, filling Clean Sand of approved quality in road work for construction of drainage layer and foundation trenches of structures in uniform layers, watered and rammed/ compacted as per approved drawing and technical specifications complete in all respect as per Section 900, 2100 and Clause 401 & 304 of MoRT&H specifications for Road & Bridge works (5th Revision) & including cost, conveyance, taxes, cess,royalties of all materials, cost of all labour, T&P required for the work etc. complete as per specification & direction of Engineer-in-charge.
Providing and laying Reinforced cement concrete of grade M-20 (Using Branded Cement) with 20mm and down grade hard granite (crusher broken) aggregate and fine aggregate conforming to IS 383 and table 1000-1 in Box Cell Culvert, Drain, Retaining wall etc as per drawing and technical specification using High Strength approved quality Cement with formwork as per Section 900,1000,1500,1700 & 2200, 2300 of specifications for Road and Bridge works of Ministry of Road Transport & Highways (5th Revision) & including centering, shuttering, cost, conveyance, taxes, cess,royalties of all materials, cost of all labour, T&P required for the work etc. complete as per specification & direction of Engineer-in-charge. a) Drain bed
b) Drain wall
c) Drain Slab
Providing and laying of Metal Spall Backing in the rear side of abutment and wing wall using 45mm size crushed hard granite stone aggregates to the required thickness with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall and return wall of CD works to the full height compacted to a firm condition as per drawing and technical specifications complete in all respect satisfying the requirements laid down in Clause 2504 and Section 900, 2500 of MoRT&H Specifications for Road & Bridge works (5th Revision) including cost, conveyance, taxes, cess,royalties of all materials, cost of all labour, T&P required for the work etc. complete as per specification & direction of Engineer-in-charge.
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 6.88 MB
Tendernotice_1.pdf
PDF • 1.65 MB
BOQ_577951.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid