| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | l1₹1.4 LAccepted-AOC | l1 | Accepted-AOC l1 | |
| 2 | l2₹1.5 L+₹9,413 (6.63%)Rejected-AOC | l2 | Rejected-AOC l2 | |
| 3 | l3₹1.6 L+₹22,349 (15.7%)Rejected-AOC | l3 | Rejected-AOC l3 |
Tender Value
₹1.6 L
EMD Value
₹4,000
Closing Date
27 Oct 2023, 3:00 pmClosed
AEE
Asst Executive Engineer, SewerageSub Division, Kerala Water Authority, Kuriathy. Thiruvananthapuram 695036 www.kwa.kerala.gov.in/kwa
DEPOSIT Fort Taluk Hospital Relaying of connection line and construction of RCC manhole Sewerage work
2023_KWA_613966_1
CE(SR)/TR/17417/2023_27_1_1/1
Open Tender
Civil Works - Water Works
Item Rate
30 days
fort hospital
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
Yes
₹4,000
Yes
4 Jan 2024
18 Oct 2023
28 Oct 2023
18 Oct 2023
27 Oct 2023
18 Oct 2023
18 Oct 2023 - 27 Oct 2023
Amount
CONSTRUCTION OF MANHOLES
15.43.2:Dismantling manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in-Charge:Bituminous road
15.7.4:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
OD95111/2023-2024:Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m for 2nd depth of 1.50m to 3.0m in all kinds of soil.
100.8.2:Fencing 1.50m high with two rows of casuarina poles (girth 15cm to 24cm) tied with coir yarn on vertical casuarina pole (girth 15cm to 24cm) fixed at 1.5m intervals.
OD95112/2023-2024:Providing Steel Sheet shoring to the sides of the trenches to depths upto 2.00 M using 5mm M>S Sheet 0.5m wide stiffen on edges with 50mm x50mmx6mm M.S angles driving down vertically on either side one after another in lines and levels with suitable pile driving equipments and accessories to a maximum depth of 0.50 M below the bottom of the proposed excavation 0.50m above ground level suitably braced by horizontal walling pieces at 75MMX100 MMx 8MM angles on either side at intervals not exceeding 1.5M and horizontal screw jack type struts at 1.50M intervals and maintaining the shoring till the pipes are laid and works are completed ,dismantling,cleaning restacking for reuse including all labour,hire charges and conveyance for equipments ,tools and plants and sundries etc .complete.
OD95113/2023-2024:Providing Steel Sheet shoring to the sides of the trenches to depths of ABOVE 2 M But Not exceeding 4 M using 6mm M>S Sheet 0.5m wide stiffen on edges with 50mm x50mmx6mm M.S angles driving down vertically on either side one after another in lines and levels with suitable pile driving equipments and accessories to a maximum depth of 0.50 M below the bottom of the proposed excavation 0.50m above ground level suitably braced by horizontal walling pieces at 75MMX125MMx 8MM angles on either side at intervals not exceeding 1.5M and horizontal screw jack type struts at 1.50M intervals and maintaining the shoring till the pipes are laid and works are completed ,dismantling,cleaning restacking for reuse including all labour,hire charges and conveyance for equipments ,tools and plants and sundries etc .complete.
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
OD95114/2023-2024:Centering and Shuttering including strutting, propping etc and removal of form work etc for cover slab(Circular)
OD95115/2023-2024:Centering and Shuttering including strutting, propping etc and removal of form work etc Well Steining (including 20% extra for circular works)
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
5.7:Reinforced cement concrete work in well - steining excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand (Zone - III) : 3 graded stone aggregate 20 mm nominal size)
5.22.4:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelHot rolled deformed bars
19.21.2:Making connection of drain or sewer line with existing manhole including breaking into and making good the walls, floors with cement concrete 1:2:4 mix( 1 cement:2 coarse sand: 4 graded stone aggregate 20 mm nominal size) cement plastered on both sides with cement mortar 1:3 ( 1 cement: 3 coarse sand) finished with a floating coat of neat cement and making necessary channels for the drain etc. complete.For pipes 250 to 300 mm diameter
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
13.9.1:Cement plaster 1:3 ( 1 cement : 3 coarse sand) finished with a floating coat of neat cement.12 mm cement plaster
19.16:Providing orange colour safety foot rest of minimum 6 mm thick plastic encapsulated as per IS: 10910 on 12 mm dia steeel bar conforming to IS:1786, having minimum cross section as 23 mm x 25 mm and over all minimum length 263 mm and width as 165 mm with minimum 112 mm space between protruded legs having 2 mm tread on top surface by ribbing or chequering besides necessary and adequate anchoring projections on tail length on 138 mm as per standard drawing and suitable to with stand the bend test and chemical resistance test as per specifications and having manufactures permanent identification mark to be visible even after fixing including fixing in manholes with 30x20x15 cm cement concrete block 1:3:6 ( 1cement: 3 coarse sand: 6 graded stone aggregate 20 mm nominal size) Complete as per design
OD95116/2023-2024:Conveying from casting yard and fixing the RCC cover slab of size 1.60 M dia,18 cm thick including 5 kg cement/each
15.48:Taking out C.I cover with frame from R.C.C. top slab of manholes of various sizes including demolishing of R.C.C. work manually / by mechanical means and stacking of useful materials near the site and disposal of unserviceable materials with 50 metres lead as per direction of Engineer -in- Charge.
2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
Pipe laying
100.1.1:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil.
2.17.2:Close timbering in case of shafts, wells, cesspits, manholes and the like including strutting, shoring and packing cavities (wherever required) etc. complete (Measurements to be taken of the face area timbered).Depth exceeding 1.5 m but not exceeding 3 m
100.8.1:Fencing one side of trenches, 1.50m height with two rows of 10cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2m intervals.
100.98.214:Supply of PVC Pipe, 6kg/cm2, 110mm Dia.
100.9.9:Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipeline to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipeline with water to the required test pressure (excluding cost of pipes and specials): 110 mm nominal outside diameter pipes.
MAINTENANCE WORKS
OD95098/2023-2024:Plugging the full portion of the mouth of 100mm dia sewer main using clay filled gunny bags and removing the same after completion of work etc complete
OD95099/2023-2024::Plugging the full portion of the mouth of 150mm to 200mm dia sewer main using clay filled gunny bags and removing the same after completion of work etc complete
OD95100/2023-2024:Plugging the full portion of the mouth of 225 to 300mm dia sewer main using clay filled gunny bags and removing the same after completion of work etc complete.
OD95102/2023-2024:Manhole cleaning upto 3m depth- <br>Cleaning the manhole at main line and branches up to a depth of 3m including removing the silt and other floated matters and destroying the debries at convenient places as directed by deptl officers
100.7.1:Bailing out water with 5HP engine and pump set including conveyance to the site, erecting, dismantling and taking back of engine and pump, cost of fuel lubricating oil and other stores pay of staff etc., complete.
100.98.1008:Engaging Coolie.
100.98.1035:Engaging sewer man.
GENERAL ITEMS
OD95104/2023-2024:Providing protection works to the Electric post by using 3 no. of Kattadi poles and removing the same after completion of work
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
OD95108/2023-2024:Removal of Dumped earth, silt, deposits received from manhole, well etc, conveying by lorry for minimum mechanical conveyance and disposing safely
M ASHOK KUMAR
Anoop AJ
Bidder Name
M ASHOK KUMAR
G ANIRUDHAN NAIR
Anoop AJ
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .