| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.1 LAccepted-AOC 676521 | MALAPPURAM | KERALA | 676521 | L1 | Accepted-AOC Agreement executed | |
| 2 | L2₹7.1 L+₹51 (<0.01%)Rejected-AOC | L2 | Rejected-AOC L2 Agreement executed by the lowest bidder | |
| 3 | L3₹7.8 L+₹71,872 (10.1%)Rejected-Finance | L3 | Rejected-Finance 3rd Lowest | |
| 4 | Rejected-Technical | - | Rejected-Technical 4th Lowest | |
| 5 | Not Admitted-Fee/PreQual/Technical/Finance | - | Not Admitted-Fee/PreQual/Technical/Finance EMD exemption certificate not valid |
| Sl No | Description | Qty | Unit | RAMAN UNNI MANIKANTAN L3 | SHAHUL HAMEED V L1 | NIZAM A M L2 | ABHISHEK C V L4 |
|---|---|---|---|---|---|---|---|
| 1.00Routine work July2026-June2027 | |||||||
| 1.00 | OD6766/2026-2027:Periodical measurement of shoreline changes-Labour charges for assisting in survey work such as measuring distances along the coast (directly accessible) for a stretch of 2 km/day using hand-held GPS as directed by the departmental officers (details for 2 km). | 420 | km | 452.27 ₹1,89,953.4 | 406.7 ₹1,70,814 | 395 ₹1,65,900 Lowest | 474.89 ₹1,99,453.8 |
| 1.00 | OD6765/2026-2027:Periodical measurement of shoreline changes-Labour charges for assisting in survey work such as measuring distances along the coast (Difficult terrain) for a stretch of 2 km/day using hand-held GPS and in areas where tape is necessary, as directed by the departmental officers (details for 2 km). | 108 | km | 904.54 ₹97,690.32 | 813.4 ₹87,847.2 | 785 ₹84,780 Lowest | 949.76 ₹1,02,574.08 |
| 1.00 | OD6767/2026-2027:Conducting survey operations for the delineation of shoreline along the seacoast of all-terrain 4km per day (both plain and difficult) and also carrying out beach profile survey at every 200m interval (unless otherwise specified by the engineer in charge with respect to the site condition) with levels at 3m intervals along the cross section from seawall to low tide level(LTL) ,utilizing Differential Global Positioning System (DGPS) integrated with Real-Time Kinematic (RTK) technology plotted after connecting available nearest GTS benchmarking to the existing Benchmark (BM) stone and subsequently to the CP stone with respect of MSL as specified by the Engineer in charge. Traverse report (cross sections) and longitudinal shoreline mapping should be submitted in WGS 84 datum and UTM/TM projection system as well as in hard copy (3nos each) of scale cross-section H(1:250) and V (1:100) with the longitudinal section in scale 1:5000. | 125 | km | 3,125.67 ₹3,90,708.75 | 2,848.3 ₹3,56,037.5 Lowest | 2,900 ₹3,62,500 | 3,281.95 ₹4,10,243.75 |
| 1.00 | OD6758/2026-2027:Taking simultaneous observation using rubber ball including all labor charges for taking shoreline changes and littoral drift etc complete as instructions of departmental officers at site | 9 | each | 1,105.32 ₹9,947.88 | 995.4 ₹8,958.6 Lowest | 1,000 ₹9,000 | 1,160.58 ₹10,445.22 |
| 1.00 | OD6759/2026-2027:Taking simultaneous observation using metal float including all labour chrges for taking shore line changes and littoral drift and conveyance equipment etc complete as per instructions of departmental officers at site. | 27 | each | 1,491.23 ₹40,263.21 | 1,348 ₹36,396 | 1,320 ₹35,640 Lowest | 1,565.79 ₹42,276.33 |
| 1.01 | OD6760/2026-2027:Collecting and testing Soil samples from beach (both pre-monsoon and post-monsoon) etc.
complete as per instructions of departmental officers at site | 6 | each | 143.91 ₹863.46 | 129.5 ₹777 Lowest | 150 ₹900 | 151.1 ₹906.6 |
| 1.01 | OD6762/2026-2027:Supply of Non - rechargeable 3.6 Volt Lithium Thionyl Chloride ( LiSOCL2) batteries | 18 | 1 nos | 1,638.29 ₹29,489.22 | 1,496.9 ₹26,944.2 | 1,465 ₹26,370 Lowest | 1,720.2 ₹30,963.6 |
| 1.01 | OD6761/2026-2027:Cleaning of self recording tidal gauge installed at Elathur using hydrochloric acid at regular intervals (once in 2 months) | 6 | 1 nos | 970.93 ₹5,825.58 | 873.1 ₹5,238.6 Lowest | 1,000 ₹6,000 | 1,019.48 ₹6,116.88 |
| 1.01 | 10.2:Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 100 | kg | 117.36 ₹11,736 | 105.5 ₹10,550 Lowest | 110 ₹11,000 | 123.23 ₹12,323 |
Tender Value
₹8.7 L
EMD Value
₹21,712
Closing Date
21 Jul 2026, 5:30 pmClosed
Deputy Director, C E S Sub Division , Kozhikode
Office of the Deputy Director, Coastal Erosion Studies Sub Division, B block Civil Staton Kozhikode 673020
Conducting physical survey and collecting field data under CES Section Kozhikode from Kadalundi to Poozhithala Mahe CP 1745 to CP 2120 using Hand held GPS and tape and periodic maintenance of Staff Guage during the period July 2026 to June 2027
2026_Irrig_860358_1
IRR/IDRB/TR/3269/2026_5_1_1/1
Open Tender
Civil Works - Others
Item Rate
365 days
Kozhikode
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,915
Yes
₹21,712
Yes
14 Aug 2026
13 Jul 2026
23 Jul 2026
13 Jul 2026
21 Jul 2026
13 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Routine work July2026-June2027 | |||||
| 1.001 | OD6766/2026-2027:Periodical measurement of shoreline changes-Labour charges for assisting in survey work such as measuring distances along the coast (directly accessible) for a stretch of 2 km/day using hand-held GPS as directed by the departmental officers (details for 2 km). | - | km | - | - |
| 1.002 | OD6765/2026-2027:Periodical measurement of shoreline changes-Labour charges for assisting in survey work such as measuring distances along the coast (Difficult terrain) for a stretch of 2 km/day using hand-held GPS and in areas where tape is necessary, as directed by the departmental officers (details for 2 km). | - | km | - | - |
| 1.003 | OD6767/2026-2027:Conducting survey operations for the delineation of shoreline along the seacoast of all-terrain 4km per day (both plain and difficult) and also carrying out beach profile survey at every 200m interval (unless otherwise specified by the engineer in charge with respect to the site condition) with levels at 3m intervals along the cross section from seawall to low tide level(LTL) ,utilizing Differential Global Positioning System (DGPS) integrated with Real-Time Kinematic (RTK) technology plotted after connecting available nearest GTS benchmarking to the existing Benchmark (BM) stone and subsequently to the CP stone with respect of MSL as specified by the Engineer in charge. Traverse report (cross sections) and longitudinal shoreline mapping should be submitted in WGS 84 datum and UTM/TM projection system as well as in hard copy (3nos each) of scale cross-section H(1:250) and V (1:100) with the longitudinal section in scale 1:5000. | - | km | - | - |
| 1.004 | OD6758/2026-2027:Taking simultaneous observation using rubber ball including all labor charges for taking shoreline changes and littoral drift etc complete as instructions of departmental officers at site | - | each | - | - |
| 1.005 | OD6759/2026-2027:Taking simultaneous observation using metal float including all labour chrges for taking shore line changes and littoral drift and conveyance equipment etc complete as per instructions of departmental officers at site. | - | each | - | - |
| 1.006 | OD6760/2026-2027:Collecting and testing Soil samples from beach (both pre-monsoon and post-monsoon) etc.
complete as per instructions of departmental officers at site | - | each | - | - |
| 1.007 | OD6762/2026-2027:Supply of Non - rechargeable 3.6 Volt Lithium Thionyl Chloride ( LiSOCL2) batteries | - | 1 nos | - | - |
| 1.008 | OD6761/2026-2027:Cleaning of self recording tidal gauge installed at Elathur using hydrochloric acid at regular intervals (once in 2 months) | - | 1 nos | - | - |
| 1.009 | 10.2:Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | - | kg | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.06 MB
BOQ_1454883.xls
BOQ • 0.24 MB
BID.pdf
Other Document • 1.64 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .