Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.9 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹20.8 L+₹8.9 L (74.9%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹88.9 L+₹77.0 L (646.6%)Admitted-Finance | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | MSM ENGINEERING L3 | Vignesh Marine Technical Services Pvt Ltd L2 | Shree Mahalakshimi Electrical service L1 |
|---|---|---|---|---|---|---|
| 1.00 | CALIBERATION OF DOL STARTER[as per SOW Ser (i),(iii),(iv),(viii),(ix),(x) ,(xi)](UP TO 2 HP)FOR THREE YEAR | 2 | NOS | 32,000 ₹33,600 | 2,720 ₹2,856 Lowest | 2,832 ₹2,973.6 |
| 2.00 | RENEWAL OF CONTROL CABLES & TERMINAL STRIP OF DOL STARTER[(as per SOW Ser (i),(ii)](UP TO 2 HP)FOR THREE YEAR | 2 | NOS | 32,000 ₹33,600 | 9,300 ₹9,765 | 3,068 ₹3,221.4 Lowest |
| 3.00 | COMPLETE OVERHAULING OF DOL STARTER [As per SOW Ser (i),(ii),(iii),(iv),(v),(vi),(vii),(ix),(xi),(xii),(xiv),(xv),xvi),(xix),(xviii)](UP TO 2 HP)FOR THREE YEAR | 2 | NOS | 44,000 ₹46,200 | 11,700 ₹12,285 Lowest | 12,980 ₹13,629 |
| 4.00 | CALIBERATION OF DOL STARTER[as per SOW Ser (i),(iii),(iv),(viii),(ix),(x) ,(xi)](2.1-5 HP)FOR THREE YEAR | 2 | NOS | 44,000 ₹46,200 | 3,500 ₹3,675 | 2,832 ₹2,973.6 Lowest |
| 5.00 | RENEWAL OF CONTROL CABLES & TERMINAL STRIP OF DOL STARTER[(as per SOW Ser (i),(ii)(2.1-5 HP)for three year | 2 | NOS | 56,000 ₹58,800 | 10,140 ₹10,647 | 3,068 ₹3,221.4 Lowest |
| 6.00 | COMPLETE OVERHAULING OF DOL STARTER [As per SOW Ser (i),(ii),(iii),(iv),(v),(vi),(vii),(ix),(xi),(xii),(xiv),(xv),xvi),(xix),(xviii)](2.1-5 HP)for three year | 2 | NOS | 56,000 ₹58,800 | 11,700 ₹12,285 Lowest | 15,340 ₹16,107 |
| 7.00 | CALIBERATION OF DOL STARTER[as per SOW Ser (i),(iii),(iv),(viii),(ix),(x) ,(xi)](5.1-10 HP)for three year | 2 | NOS | 64,000 ₹67,200 | 3,500 ₹3,675 | 2,830 ₹2,971.5 Lowest |
| 8.00 | RENEWAL OF CONTROL CABLES & TERMINAL STRIP OF DOL STARTER[(as per SOW Ser (i),(ii)(5.1-10 HP)for three year | 2 | NOS | 64,000 ₹67,200 | 13,000 ₹13,650 | 3,068 ₹3,221.4 Lowest |
| 9.00 | COMPLETE OVERHAULING OF DOL STARTER [As per SOW Ser (i),(ii),(iii),(iv),(v),(vi),(vii),(ix),(xi),(xii),(xiv),(xv),xvi),(xix),(xviii)](5.1-10 HP))for three year | 2 | NOS | 80,000 ₹84,000 | 15,600 ₹16,380 Lowest | 16,050 ₹16,852.5 |
| 10.00 | CALIBERATION OF DOL STARTER[as per SOW Ser (i),(iii),(iv),(viii),(ix),(x) ,(xi)](10.1-20 HP)for three year | 2 | NOS | 88,000 ₹92,400 | 3,500 ₹3,675 | 2,832 ₹2,973.6 Lowest |
Tender Value
Refer Docs
EMD Value
₹1 L
Closing Date
18 Sept 2022, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CDR K SARAVANAN
FTSU(CHN), C/O-NAVY OFFICE, VARUNA SALAI, CHENNAI- 600009
RRC OF STARTER AND CONTROLLERS FITTED ONBOARD IN SHIPS AT CHENNAI FOR A PERIOD OF THREE YEARS
2022_NAVY_548708_1
FOTNA/FTSU/L/RRC/STARTERS AND CONTROLLERS/22-23
Open Tender
Miscellaneous Services
Works
1095 days
ONBOARD IN SHIPS AT CHENNAI
AS PER TENDER DOCUMENTS
3 documents required · 3 mandatory
₹0
₹1 L
Yes
FTSU(CHN), C/O NAVY OFFICE
3 Oct 2022
30 Aug 2022
19 Sept 2022
30 Aug 2022
18 Sept 2022
2 Sept 2022
30 Aug 2022 - 2 Sept 2022
2 Sept 2022
CALIBERATION OF DOL STARTER[as per SOW Ser (i),(iii),(iv),(viii),(ix),(x) ,(xi)](UP TO 2 HP)FOR THREE YEAR
RENEWAL OF CONTROL CABLES & TERMINAL STRIP OF DOL STARTER[(as per SOW Ser (i),(ii)](UP TO 2 HP)FOR THREE YEAR
COMPLETE OVERHAULING OF DOL STARTER [As per SOW Ser (i),(ii),(iii),(iv),(v),(vi),(vii),(ix),(xi),(xii),(xiv),(xv),xvi),(xix),(xviii)](UP TO 2 HP)FOR THREE YEAR
CALIBERATION OF DOL STARTER[as per SOW Ser (i),(iii),(iv),(viii),(ix),(x) ,(xi)](2.1-5 HP)FOR THREE YEAR
RENEWAL OF CONTROL CABLES & TERMINAL STRIP OF DOL STARTER[(as per SOW Ser (i),(ii)(2.1-5 HP)for three year
COMPLETE OVERHAULING OF DOL STARTER [As per SOW Ser (i),(ii),(iii),(iv),(v),(vi),(vii),(ix),(xi),(xii),(xiv),(xv),xvi),(xix),(xviii)](2.1-5 HP)for three year
CALIBERATION OF DOL STARTER[as per SOW Ser (i),(iii),(iv),(viii),(ix),(x) ,(xi)](5.1-10 HP)for three year
RENEWAL OF CONTROL CABLES & TERMINAL STRIP OF DOL STARTER[(as per SOW Ser (i),(ii)(5.1-10 HP)for three year
COMPLETE OVERHAULING OF DOL STARTER [As per SOW Ser (i),(ii),(iii),(iv),(v),(vi),(vii),(ix),(xi),(xii),(xiv),(xv),xvi),(xix),(xviii)](5.1-10 HP))for three year
CALIBERATION OF DOL STARTER[as per SOW Ser (i),(iii),(iv),(viii),(ix),(x) ,(xi)](10.1-20 HP)for three year
RENEWAL OF CONTROL CABLES & TERMINAL STRIP OF DOL STARTER[(as per SOW Ser (i),(ii)](10.1-20 HP)for three year
COMPLETE OVERHAULING OF DOL STARTER [As per SOW Ser (i),(ii),(iii),(iv),(v),(vi),(vii),(ix),(xi),(xii),(xiv),(xv),xvi),(xix),(xviii)](10.1-20 HP)for three year
CALIBERATION OF DOL STARTER[as per SOW Ser (i),(iii),(iv),(viii),(ix),(x) ,(xi)](20.1 AND ABOVE) for three year
RENEWAL OF CONTROL CABLES & TERMINAL STRIP OF DOL STARTER[(as per SOW Ser (i),(ii)](20.1 AND ABOVE) for three year
COMPLETE OVERHAULING OF DOL STARTER [As per SOW Ser (i),(ii),(iii),(iv),(v),(vi),(vii),(ix),(xi),(xii),(xiv),(xv),xvi),(xix),(xviii)](20.1 AND ABOVE) for three year
CALIBERATION OF STAR DELTA STARTER(BELOW 10 HP)[as per SOW Ser (i),(iii),(iv),(viii),(ix),(x) ,(xi)]FOR THREE YEAR
RENEWAL OF CONTROL CABLES & TERMINAL STRIP OF STAR DELTA STARTER(BELOW 10 HP)[(as per SOW Ser (i),(ii)]FOR THREE YEAR
COMPLETE OVERHAULING OF STAR DELTA STARTER (BELOW 10HP)[As per SOW Ser (i),(ii),(iii),(iv),(v),(vi),(vii),(ix),(xi),(xii),(xiv),(xv),xvi),(xix),(xviii)]FOR THREE YEAR
CALIBERATION OF STAR DELTA STARTER( 10.1-20 HP)[as per SOW Ser (i),(iii),(iv),(viii),(ix),(x) ,(xi)]FOR THREE YEAR
RENEWAL OF CONTROL CABLES & TERMINAL STRIP OF STAR DELTA STARTER( 10.1-20 HP)[(as per SOW Ser (i),(ii)]FOR THREE YEAR
COMPLETE OVERHAULING OF STAR DELTA STARTER( 10.1-20 HP) [As per SOW Ser (i),(ii),(iii),(iv),(v),(vi),(vii),(ix),(xi),(xii),(xiv),(xv),xvi),(xix),(xviii)]FOR THREE YEAR
CALIBERATION OF STAR DELTA STARTER(20.1 - 30 HP)[as per SOW Ser (i),(iii),(iv),(viii),(ix),(x) ,(xi)]FOR THREE YEAR
RENEWAL OF CONTROL CABLES & TERMINAL STRIP OF STAR DELTA STARTER(20.1 - 30 HP)[(as per SOW Ser (i),(ii)]FOR THREE YEAR
COMPLETE OVERHAULING OF STAR DELTA STARTER(20.1 - 30 HP) [As per SOW Ser (i),(ii),(iii),(iv),(v),(vi),(vii),(ix),(xi),(xii),(xiv),(xv),xvi),(xix),(xviii)]FOR THREE YEAR
CALIBERATION OF STAR DELTA STARTER(30.1 - 50 HP)[as per SOW Ser (i),(iii),(iv),(viii),(ix),(x) ,(xi)]FOR THREE YEAR
RENEWAL OF CONTROL CABLES & TERMINAL STRIP OF STAR DELTA STARTER(30.1 - 50 HP)[(as per SOW Ser (i),(ii)]FOR THREE YEAR
COMPLETE OVERHAULING OF STAR DELTA STARTER(30.1 - 50 HP) [As per SOW Ser (i),(ii),(iii),(iv),(v),(vi),(vii),(ix),(xi),(xii),(xiv),(xv),xvi),(xix),(xviii)]FOR THREE YEAR
CALIBERATION OF STAR DELTA STARTER(50.1 HP AND ABOVE)[as per SOW Ser (i),(iii),(iv),(viii),(ix),(x) ,(xi)]
RENEWAL OF CONTROL CABLES & TERMINAL STRIP OF STAR DELTA STARTER(50.1 HP AND ABOVE)[(as per SOW Ser (i),(ii)]FOR THREE YEAR
COMPLETE OVERHAULING OF STAR DELTA STARTER(50.1 HP AND ABOVE) [As per SOW Ser (i),(ii),(iii),(iv),(v),(vi),(vii),(ix),(xi),(xii),(xiv),(xv),xvi),(xix),(xviii)]FOR THREE YEAR
CALIBERATION AUTO TRANSFORMER STARTER (20 HP – 50 HP)[as per SOW Ser (i),(iii),(iv),(viii),(ix),(x) ,(xi)]FOR THREE YEAR
RENEWAL OF CONTROL CABLES & TERMINAL STRIP AUTO TRANSFORMER STARTER (20 HP – 50 HP) [(as per SOW Ser (i),(ii)]FOR THREE YEAR
COMPLETE OVERHAULING AUTO TRANSFORMER STARTER (20 HP – 50 HP)[As per SOW Ser (i),(ii),(iii),(iv),(v),(vi),(vii),(ix),(xi),(xii),(xiv),(xv),xvi),(xix),(xviii)]FOR THREE YEAR
CALIBERATION AUTO TRANSFORMER STARTER (50.1 and above)[as per SOW Ser (i),(iii),(iv),(viii),(ix),(x) ,(xi)]FOR THREE YEAR
RENEWAL OF CONTROL CABLES & TERMINAL STRIP AUTO TRANSFORMER STARTER (50.1 and above) [(as per SOW Ser (i),(ii)]FOR THREE YEAR
COMPLETE OVERHAULING AUTO TRANSFORMER STARTER (50.1 and above)[As per SOW Ser (i),(ii),(iii),(iv),(v),(vi),(vii),(ix),(xi),(xii),(xiv),(xv),xvi),(xix),(xviii)]FOR THREE YEAR
CALIBERATION OF SOFT STARTERS ( UPTO 15 HP) [as per SOW Ser (i),(iii),(iv),(viii),(ix),(x) ,(xi)]FOR THREE YEAR
RENEWAL OF CONTROL CABLES & TERMINAL STRIP OF SOFT STARTERS ( UPTO 15 HP)[(as per SOW Ser (i),(ii)]FOR THREE YEAR
COMPLETE OVERHAULING OF SOFT STARTERS ( UPTO 15 HP)[As per SOW Ser (i),(ii),(iii),(iv),(v),(vi),(vii),(ix),(xi),(xii),(xiv),(xv),xvi),(xix),(xviii)]FOR THREE YEAR
CALIBERATION OF SOFT STARTERS (15.1 HP - 30 HP) [as per SOW Ser (i),(iii),(iv),(viii),(ix),(x) ,(xi)]
RENEWAL OF CONTROL CABLES & TERMINAL STRIP OF SOFT STARTERS (15.1 HP - 30 HP)[(as per SOW Ser (i),(ii)]
COMPLETE OVERHAULING OF SOFT STARTERS (15.1 HP - 30 HP)[As per SOW Ser (i),(ii),(iii),(iv),(v),(vi),(vii),(ix),(xi),(xii),(xiv),(xv),xvi),(xix),(xviii)]
CALIBERATION OF SOFT STARTERS (30.1 HP - 50 HP) [as per SOW Ser (i),(iii),(iv),(viii),(ix),(x) ,(xi)]FOR THREE YEAR
RENEWAL OF CONTROL CABLES & TERMINAL STRIP OF SOFT STARTERS (30.1 HP - 50 HP)[(as per SOW Ser (i),(ii)]FOR THREE YEAR
COMPLETE OVERHAULING OF SOFT STARTERS (30.1 HP - 50 HP) [As per SOW Ser (i),(ii),(iii),(iv),(v),(vi),(vii),(ix),(xi),(xii),(xiv),(xv),xvi),(xix),(xviii)]FOR THREE YEAR
CALIBERATION OF SOFT STARTERS (50.1 HP AND ABOVE) [as per SOW Ser (i),(iii),(iv),(viii),(ix),(x) ,(xi)]FOR THREE YEAR
RENEWAL OF CONTROL CABLES & TERMINAL STRIP OF SOFT STARTERS (50.1 HP AND ABOVE)[(as per SOW Ser (i),(ii)]FOR THREE YEAR
COMPLETE OVERHAULING OF SOFT STARTERS (50.1 HP AND ABOVE) [As per SOW Ser (i),(ii),(iii),(iv),(v),(vi),(vii),(ix),(xi),(xii),(xiv),(xv),xvi),(xix),(xviii)]FOR THREE YEAR
CALIBERATION OF AUTO CHANGE OVER SWITCHES(0-30 AMPS) [as per SOW Ser (i),(iii),(iv),(viii),(ix),(x) ,(xi)]FOR THREE YEAR
RENEWAL OF CONTROL CABLES & TERMINAL STRIP OF AUTO CHANGE OVER SWITCHES(0-30 AMPS)[(as per SOW Ser (i),(ii)]FOR THREE YEAR
COMPLETE OVERHAULING OF AUTO CHANGE OVER SWITCHES(0-30 AMPS)[As per SOW Ser (i),(ii),(iii),(iv),(v),(vi),(vii),(ix),(xi),(xii),(xiv),(xv),xvi),(xix),(xviii)(xxxiii)]FOR THREE YEAR
CALIBERATION OF AUTO CHANGE OVER SWITCHES(30.1-50 AMPS) [as per SOW Ser (i),(iii),(iv),(viii),(ix),(x) ,(xi)]FOR THREE YEAR
RENEWAL OF CONTROL CABLES & TERMINAL STRIP OF AUTO CHANGE OVER SWITCHES(30.1-50 AMPS)[(as per SOW Ser (i),(ii)]FOR THREE YEAR
COMPLETE OVERHAULING OF AUTO CHANGE OVER SWITCHES(30.1-50 AMPS)[As per SOW Ser (i),(ii),(iii),(iv),(v),(vi),(vii),(ix),(xi),(xii),(xiv),(xv),xvi),(xix),(xviii)(xxxiii)]FOR THREE YEAR
CALIBERATION OF AUTO CHANGE OVER SWITCHES(50.1-75 AMPS) [as per SOW Ser (i),(iii),(iv),(viii),(ix),(x) ,(xi)]FOR THREE YEAR
RENEWAL OF CONTROL CABLES & TERMINAL STRIP OF AUTO CHANGE OVER SWITCHES(50.1-75 AMPS)[(as per SOW Ser (i),(ii)]FOR THREE YEAR
COMPLETE OVERHAULING OF AUTO CHANGE OVER SWITCHES(50.1-75 AMPS)[As per SOW Ser (i),(ii),(iii),(iv),(v),(vi),(vii),(ix),(xi),(xii),(xiv),(xv),xvi),(xix),(xviii)(xxxiii)]FOR THREE YEAR
CALIBERATION OF AUTO CHANGE OVER SWITCHES(75.1 AND ABOVE) [as per SOW Ser (i),(iii),(iv),(viii),(ix),(x) ,(xi)]FOR THREE YEAR
RENEWAL OF CONTROL CABLES & TERMINAL STRIP OF AUTO CHANGE OVER SWITCHES(75.1 AND ABOVE)[(as per SOW Ser (i),(ii)]FOR THREE YEAR
COMPLETE OVERHAULING OF AUTO CHANGE OVER SWITCHES(75.1 AND ABOVE)[As per SOW Ser (i),(ii),(iii),(iv),(v),(vi),(vii),(ix),(xi),(xii),(xiv),(xv),xvi),(xix),(xviii)(xxxiii)]FOR THREE YEAR
COMMISSIONING AND SERVICEABILITY CHECKS OF CONTROL PANEL BATTERIES (UPTO 45 AH) [as per SOW Ser (xxx)]FOR THREE YEAR
COMMISSIONING AND SERVICEABILITY CHECKS OF CONTROL PANEL BATTERIES ( 45 .1AH TO 90 AH) [as per SOW Ser (xxx)]FOR THREE YEAR
COMMISSIONING AND SERVICEABILITY CHECKS OF CONTROL PANEL BATTERIES ( 90.1 AH TO 125 AH) [as per SOW Ser (xxx)]FOR THREE YEAR
COMMISSIONING AND SERVICEABILITY CHECKS OF CONTROL PANEL BATTERIES ( 125.1 AH TO 180 AH) [as per SOW Ser (xxx)]FOR THREE YEAR
OVERHAULING OF AC PLANT CONTROL PANEL[as per SOW Ser (i) (ii),(viii),(xi),(xvii)FOR THREE YEAR
OVERHAULING OF BOAT DAVIT CONTROL PANEL[as per SOW Ser (i) (ii),(viii),(xi),(xvii)FOR THREE YEAR
OVERHAULING OF ANCHOR CAPSTAN CONROL PANEL[as per SOW Ser (i) (ii),(viii),(xi),(xvii)FOR THREE YEAR
OVERHAULING OF NLCP[As per SOW Ser (i),(ii), (iii), (iv),(viii),(ix),(xi)]FOR THREE YEAR
OVERHAULING OF GENERAL POWER CONTROL PANEL[As per SOW Ser (i),(ii), (iii), (iv),(viii),(ix),(xi)(xvii)]FOR THREE YEAR
OVERHAULING OF RECTIFIER PANEL[As per SOW Ser (i),(ii), (iii), (iv),(viii),(ix),(xi),(xvii),(xxii)]FOR THREE YEAR
CALIBERATION OF VOLTMETER [As per SOW Ser (xviii),(xx)]FOR THREE YEAR
CALIBERATION OF AMMETER [As per SOW Ser (xviii),(xx)]FOR THREE YEAR
CALIBERATION OF FREQUNECY METER [As per SOW Ser (xviii),(xx)]FOR THREE YEAR
CALIBERATION OF POWER FACTOR METER [As per SOW Ser (xviii),(xx)]FOR THREE YEAR
CALIBERATION OF KW METER [As per SOW Ser (xviii),(xx)]FOR THREE YEAR
CALIBERATION OF UV/OV RELAY [As per SOW Ser (xviii),(xx)]FOR THREE YEAR
CALIBERATION OF OL RELAY [As per SOW Ser (xviii),(xx)]FOR THREE YEAR
CALIBERATION OF REVERSE POWER RELAY [As per SOW Ser (xviii),(xx)]FOR THREE YEAR
CALIBERATION OF DOUBLE VOLT METER [As per SOW Ser (xviii),(xx)]FOR THREE YEAR
CALIBERATION OF DOUBLE FREQUENCY METER METER [As per SOW Ser (xviii),(xx)]FOR THREE YEAR
CALIBERATION OF SYNCHROSCOPE [As per SOW Ser (xviii),(xx)]FOR THREE YEAR
CALIBERATION OF GENERATOR MAIN BREAKER [As per SOW Ser (xviii),(xx)]FOR THREE YEAR
CALIBERATION OF LOAD BALANCING RELAY[As per SOW Ser (xviii),(xx)]FOR THREE YEAR
CALIBERATION/OVERHAULING OF AVR [As per SOW Ser (xx),(xxii)]FOR THREE YEAR
PARALLELING DEFECTS ON SWBD [as per SOW Ser (i) (ii),(viii),(xi),(xvii)]FOR THREE YEAR
DEFECTS FOR QDC SETTING[As per SOW Ser (ii),(xxi)]FOR THREE YEAR
REMOTE OPERATION OF BREAKER AND SWBD/CONTROL PANEL[as per SOW Ser (i) (ii),(viii),(xi),(xvii),(xxix)]FOR THREE YEAR
REMOTE OPERATION OF CONTROL PANEL[as per SOW Ser (i) (ii),(viii),(xi),(xvii),(xxix)]FOR THREE YEAR
Vignesh Marine Technical Services Pvt Ltd
MSM ENGINEERING
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .