| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.9 LAccepted-AOC AT MUKHIGUDA JAIPATNA DIST KALAHANDI | ₹4.9 L Quoted ₹5.2 L | L1 | Accepted-AOC Winner of lottery |
| 2 | L1₹4.9 LRejected-AOC AT NUAGARHPATANA PO HARIPUR PS NIRAKARPUR DIST KHORDHA PIN 752021 | KHORDHA | KHORDHA | ODISHA | 752021 | ₹4.9 L | L1 | Rejected-AOC loser of lottery |
| 3 | L3₹5.8 LRejected-AOC AT SATATIRA PO BHAGANAI PS GHASIPURA DIST KEONJHAR PIN 758043 | GHASIPURA | KEONJHAR | ODISHA | 758043 | ₹5.8 L | L3 | Rejected-AOC Not qualify for lottery |
Tender Value
₹5.8 L
EMD Value
₹5,850
Closing Date
15 Apr 2026, 5:00 pmClosed
SE Kanupur Reh. C and B Division Basudevpur
O/o SE Kanupur Reh. C and B Division Basudevpur
Construction of Boundary Wall to Ayurvedic center at Angulia R and R colony For the DPs of Village Chamakapur Under KIP
2026_KPRIP_127848_3
SE,KRC AND BD-25(2025-26)
National Competitive Bid
Civil Works - Buildings
Percentage
120 days
SE Kanupur Reh. C and B Division Basudevpur
please refer tender details
3 documents required · 3 mandatory
₹4,000
₹5,850
Yes
2 Jun 2026
6 Apr 2026
16 Apr 2026
6 Apr 2026
15 Apr 2026
6 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation in hard soil or gravelly soil with all leads & lifts with shoring and shuttering with working pump if required etc. complete as per the direction of the Engineer-in-charge. | - | Cum. | - | - |
| 2 | Supplying & filling foundation & plinth with sand well watered and rammed including all cost of materials, labour charges etc. complete as per the direction of the Engineer-in-charge. | 1 | Cum. | - | - |
| 3 | Cement concrete ( 1:3:6) in foundation and floors (i.e below the base course of terrace flooring using 4 cm size black hard crusher broken granite stone metal (free from weathered skinned & debris etc.) of approved quality including cost and conveyance royalities and taxes of all materials and cost of all labour with T& P required for the work complete and as directed by the Engineer-in-charge . | 1 | Cum. | - | - |
| 4 | R.C.C/C.C work M-20 using 20mm size down graded black hard crusher broken granite chips (free from weathered skinned and debris) etc. including hoisting, lowering, laying and compacting concrete using vibrator watering , and curing for 28days including cost, conveyance, royalities and taxes of all materials & cost of all labour with T&P required for the work etc. complete in all respect but excluding cost of m.s Rod or Tor steel and binding wires and labour charges for bending binding and tying the grill etc. complete and as directed by the Engineer-in-charge | 1 | Cum. | - | - |
| 5 | Rigid & smooth centering and shuttering for R.C.C./C.C.works including falseworks and dismentaling then after casting including cost of materials etc.complete.a) Foundation footing and column base & plinth beam. | - | Sqm. | - | - |
| 6 | Column & beam , Ground Floor | - | Sqm. | - | - |
| 7 | Providing F.A. Brick masonry in C.M. (1:6) using F.A. bricks of approved quality having crushing strength not less than 75 kg/cm2 in including all costs, conveyance, royalty and all others taxes of all materials and cost of all labour with T & P required for the work and with all leads, lifts & delifts including watering, curing & scaffolding etc. all complete as per per drawing & specification and as directed by the Engineer-in-charge. Super structure, Ground Floor | 1 | Cum. | - | - |
| 8 | 12mm (1/2") thick cement plaster ( 1:6) finished smooth to outside smooth surface of brick walls after rackingout the joints including watering and curing etc. scaffolding if requiredetc. complete with cost, conveyance, royalities and taxes of all materials with cost of all labour with T&P required for the work etc. complete as directed by Engineer-in-charge. | - | Sqm. | - | - |
| 9 | 16mm thick C.P (1:6)in all floors finished smooth to inside rough surface of brick walls with scafolding after racking out the joints including watering,curing cost ,conveyance, royalities taxes of all materials and cost of all labour T&P required for the work complete in all respect and as directed by the Engineer-in-charge. | 1 | Sqm. | - | - |
| 10 | Painting two coat with weathercoat over one coat of primer including cost,coveyance,royality & T& P materials labour etc.complete as per the direction of the Engineer in charge. | 1 | Sqm. | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.42 MB
BwallAyurvedic.pdf
Tender Documents • 1.33 MB
BOQ_587066.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .