| 1.00 | 4.1.B.2:Construction of granular sub-base by providing graded material, spreading in uniform layers with a motor grader on a prepared surface, mixing by mix in-place method with rotavator at OMC, and compacting with a vibratory roller to achieve the desired density, complete as per clause 401. Grading-VI - For sub-base cum drainage layer - Mix in Place Method | 57.8 | cum | 4,061.24 ₹2.3 L | 3,428.76 ₹2.0 L |
| 2.00Road way Concrete and culvert works | |||||
| 2.00 | 3.13.1.B:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. Ordinary soil - Mechanical Means - (Depth upto 3 m) | 69.8 | cum | 69.32 ₹4,838.54 | 58.53 ₹4,085.39 |
| 2.00 | 12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. | 107.09 | cum | 8,046.2 ₹8.6 L | 6,793.11 ₹7.3 L |
| 2.00 | 12.8.A.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M15 | 6 | cum | 9,320.83 ₹55,924.98 | 7,869.23 ₹47,215.38 |
| 2.00 | 12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications | 1.1 | MT | 1,10,548.83 ₹1.2 L | 93,332.22 ₹1.0 L |
| 2.00 | 12.8.1.C.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer | 57.61 | cum | 10,125.74 ₹5.8 L | 8,548.78 ₹4.9 L |
| 2.01 | 3.16:Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. | 38.67 | cum | 614.11 ₹23,745.18 | 518.47 ₹20,047.16 |
| 2.01 | OD55652/2025-2026: Dry Stone Masonry work for foundation and Superstructure etc. complete as per drawing and technical specifications. | 108.6 | cum | 4,686.45 ₹5.1 L | 3,956.59 ₹4.3 L |
Tender Value
₹22.0 L
EMD Value
₹50,000
Closing Date
22 Oct 2025, 3:00 pmClosed
The Executive Engineer
The Executive Engineer Roads Division Kollam
LAC-ADS-Improvements to Keezhoottu - Moozhiyil Ela Road under Pathanapuram LAC-By providing Roadway concrete-General Civil Work
2025_PWD_797899_3
44/EE/ET/2025-26
Open Tender
Civil Works - Roads
180 days
Kollam
Please refer Tender documents.
11 documents required · 11 mandatory
₹2,760
Yes
₹50,000
Yes
20 Dec 2025
14 Oct 2025
24 Oct 2025
14 Oct 2025
22 Oct 2025
14 Oct 2025
Amount
Subgrade strengthening
4.1.B.2:Construction of granular sub-base by providing graded material, spreading in uniform layers with a motor grader on a prepared surface, mixing by mix in-place method with rotavator at OMC, and compacting with a vibratory roller to achieve the desired density, complete as per clause 401. Grading-VI - For sub-base cum drainage layer - Mix in Place Method
Road way Concrete and culvert works
3.13.1.B:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. Ordinary soil - Mechanical Means - (Depth upto 3 m)
12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
12.8.A.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M15
12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications
12.8.1.C.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer
3.16:Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2.
OD55652/2025-2026: Dry Stone Masonry work for foundation and Superstructure etc. complete as per drawing and technical specifications.
OD55687/2025-2026:Bailing out water and removing slush etc. by using pump set including cost of labour, oil, hire charges of pump etc. complete.
OD55688/2025-2026:Daily labour for engaging petty works
Binu P (BID ID -2402077)
Bidder Name
S SURENDRAN PILLAI
Binu P
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1351017.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
viewsbd.pdf
Tender Documents • 1.63 MB
viewnit.pdf
Tender Documents • 0.03 MB
BOQ_1351017.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid