Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹45.0 LAdmitted-Finance | -11.88% | ₹45.0 L | L1 | Admitted-Finance |
| 2 | L2₹48.5 L+₹3.5 L (7.68%)Admitted-Finance | -5.11% | ₹48.5 L+₹3.5 L (7.68%) | L2 | Admitted-Finance |
| 3 | L3₹51.0 L+₹6.0 L (13.4%)Admitted-Finance | -0.05% | ₹51.0 L+₹6.0 L (13.4%) | L3 | Admitted-Finance |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹51.1 L
EMD Value
₹1.2 L
Closing Date
1 Jul 2026, 5:00 pmClosed
DIRECTOR(H)
SECTOR-39, NOIDA
M/o Green Belt ( Barbed Wire Fencing in Green Belt sector-151) Noida.
2026_NOIDA_1161576_1
01/D(H)/DD(H)-III/2026-27
Open Tender
Civil Works - Others
Fixed-rate
120 days
NOIDA
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,832
NOIDA
₹1.2 L
18 Sept 2026
18 Jun 2026
2 Jul 2026
18 Jun 2026
1 Jul 2026
18 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavating holes more than 0.10 cum & upto 0.5 cum including getting out the excavated soil, then returning the soil as required in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering etc, disposing of surplus excavated soil, as directed within a lead of 50 m and lift upto 1.5 m. All kinds of soil | 1,215 | Hole | 36.24 | ₹44,031.6 |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement: 4 coarse sand (zone-III):
8 graded stone aggregate 40 mm nominal size) | 43.74 | Cum | 5,746.88 | ₹2,51,368.53 |
| 3 | Supplying at site : R.C.C. Standards post/struts/rails/pales of mix 1:1.5:3 (1 cement : 1.5 coarse sand 3 graded stone aggregate 12.5 mm nominal size) with wooden plugs or 6mm bar nibs wherever required as per direction of Engineer-in-charge (cost of earth works in excavation, concrete works in foundation to the paid separately). | 150.66 | Cum | 20,727.84 | ₹31,22,856.37 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (1 cement: 2 coarse sand (zone-III): 4 graded stone aggregate 20 mm nominal size) | 218.7 | Cum | 6,753.45 | ₹14,76,979.52 |
| 5 | Fencing with R.C.C. post placed at required distance, embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post one side only, provided with horizontal lines and two diagonals of barbed wire weighing 9.38 kg per 100 metres (minimum), between the two posts fitted and fixed with G.I. staples on wooden plugs or G.I. binding wire tied to 6 mm bar nibs fixed while casting the post (cost of R.C.C. posts, struts, earth work and concrete to be paid for separately):- Payment to be made per metre cost of total length of barbed wire used. 16.17.1 With G.I. barbed wire | 23,975 | Rm | 8.79 | ₹2,10,740.25 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.66 MB
BOQ_2177346.xls
BOQ • 0.28 MB
td01.pdf
Tender Documents • 2.60 MB
Capability2026.xls
Additional Documents • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .