| 1 | L1₹1,441.68Accepted-AOC N K TOWER NEAR KARGICHOWK DEHRADUN UTTARAKHAND | DEHRADUN | UTTARAKHAND | 248001 | ₹1,441.68 Quoted ₹14.4 Cr | L1 | Accepted-AOC Bid is responsive |
| 2 | L2₹15.1 Cr+₹67.8 L (4.70%)Rejected-Finance | ₹15.1 Cr+₹67.8 L (4.70%) | L2 | Rejected-Finance Bid is non responsive |
| 3 | Rejected-Technical 12 SADAR BAZAR CHAKRATA DEHRADUN | DEHRADUN | UTTARAKHAND | 248001 | - | - | Rejected-Technical Not Responsive |
| 4 | Rejected-Technical 9 PPCL COLONY UDAY VIHAR HARIDWAR BYPASS DEHRADUN UTTARAKHAND | DEHRADUN | DEHRADUN | UTTARAKHAND | - | - | Rejected-Technical Not Responsive |
| 5 | Rejected-Technical | - | - | Rejected-Technical Not Responsive |
Tender Value
₹15.2 Cr
EMD Value
₹30.4 L
Closing Date
8 Oct 2020, 1:00 pmClosed
CE URRDA
Chief Engineer,URRDA First Floor in Directorate Panchayati raj, Opposite IT Park,Sahastradhara Road Dehradun
UT1373 Construction of Naitwar to Halwari Motor Road Under PMGSY Length 23.750 KM stage I and II
2020_CCUK_98814_1
UT1373
National Competitive Bid
Civil Works - Roads
Item Rate
365 days
PUROLA
Refer Technical Bid
4 documents required · 4 mandatory
₹5,900
CE URRDA
₹30.4 L
Mussoorie
28 Dec 2020
2 Sept 2020
8 Oct 2020
3 Sept 2020
8 Oct 2020
3 Sept 2020
5 Sept 2020
Amount
Earth work in hill road (hill side cutting/ filling):- Excavation in hilly area for construction of raod in all type of soils& rocks as met at site, true to lines as per Plan, L section, cross slopes, superelevation as required, also including uprooting & cutting of bushes, dressing of road surface to the required level and slopes with all lead, lift and safe disposal of surplus excavated material at suitable dumping places indicated in drawings by mechenical means/manual means without damaging forest, forest land, utility and private properities, including slip clearance till the completion of work as per "SPECIAL CONDITION FOR HILL ROAD CUTTING AND MUCK DISPOSAL IN LUMP SUMP JOB " mentioned in SBD clause 9 of Section 4 (Part-II) Special condition of contract as per directed by Engineer-In-Charge as per MORD Specification clause 1601, 1602 &1603, Note : Above Lump-sump job include 9894.33 cum minimum quantity for Muck disposal. If after the measurement [as mentioned in special condition of contract clause 9.1 (g) of SBD Section 4 (part-II) dumped quantity is found less then above mentioned quantity deduction @ Rs. 92.13 per cum shall made for lump sum job amount.
MAINTENANCE DURING CONSTRUCTION Running Slip Clearance & land slides in soil and ordinary rock during rainy seasons at Construction time of Stage -II, by a bull-dozer D 80 A-12, 180 HP including supply of all materials, labour, T&P etc required for proper completion of the work. 15 % of total length
Excavation for Structures:- Excavation in foundation for cross drainage structures, Retaining walls, brest walls, breast walls and other similar structure in all types of soils and rocks as met at site with all leads, lift and disposal of surplus earth as directed by Engineer - in - Charge also including supply of all materials, labour, T&P etc required for proper completion of work.
Random rubble stone masonry for structures laid dry by locally available approved stone ncluding supply of all materials, labour, T&P etc required for proper completion of work as per Drawing and MORD specification for , retaining walls, brest walls & other smimilar structures etc as per direction of Engineer-in-charge..
Random rubble stone masonry for structures laid in 1:5 cement & sand mortar by locally available approved stone and sand from approved quarry including supply of all materials, labour, T&P etc required for proper completion of work as per Drawing and MORD specification for cross drainage structures, retaining walls, brest walls & other smimilar structures etc as per direction of Engineer-in-charge..
HP stone filling in back of walls including supply of all material,labour, T&P etc. required for proper completion of the work.
Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire conforming to IS:280 and IS: 4826 in 100 mm x 100 mm mesh (woven diagonally) including 10% extra for laps and joints laid with stone boulders weighting not less than 25 Kg each as per drawing and technical specification of MORD and as directed by Engineer-in-charge
Cement plum Masonry with 40% plum & 60% 1:3:6 cement concrete including supply of all material, labour, T&P etc. required for proper completion of the work. as per drawings and technical specifications Clause 802, 803, 1202 & 1203 of MORD Specifiction
Providing edge stone on valley side of formation as per drawing and Technical specification Clause 1608.2.6 as per MORD spec. 1600 Sr. No. 8.9 (0.49mtr @ 247.00/ mtr =121.03)
Plastering with cement mortar (1:4), 15 mm thick on stone work in substructure as per technical specification Clauses 613.4 & 1204
Flush Pointing(1 : 3) front
White wash (fornt, back and side)
Construction of Trapazoidal kutcha drain (0.60 m x 0.45 m) size as per drawing excluding gapes for C/D structures including excavation in all type of soil and rocks as met at site including supply of all materials, labour, T&P lead, lifts, disposal of excavated materials etc as per direction of Engineer-in-charge (By mechenical Mean)
Providing and laying plain cement concerte (M-10) in 1:3:6 ( 1 cement, 3 coarse sand,6 40mm stone ballast & 20mm stone ballast)
Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 (M25 grade)
Plain / reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, (M-25)
Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202. (The reinforcement steel shall be procured from original (primary) steel producers as per clause no. 2011.3.1 of MORD specifications (First Revision'2014) and IS 1786:2008 clause no. 1.6)
100mm AC pipe as Weep hole
RR Dry stone masonary in Kharanja bottom of Catchpit
Excavation in soil in Hilly Area by manual means including cutting and trimming of side slopes and disposing of excavated earth with a lift upto 1.5 m and a lead upto 20 m as per drawing and Technical Specification Clause 1603.1 Super Elevation
Construction of Embankment with Material Obtained from Roadway Cutting Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 Pattri Filling
Random Rubble stone masonary in Coolie walling including supply of all material, labour, T&P etc. required for proper completion of the work.(As per PWD Uttarakhand specifications)
Repairs of damages caused by rain/spillage of water Preparation and surface treatment of formation by removing mud and slurry, watering to the extent needed to maintain the desired moisture content, trimming to the required line, grade, profile and rolling with three wheel 80-100 kN static roller, complete as per Technical Specification Clause 301.5.5.1
Granular sub-base/base/surface course with local materials (Table 400.13) by mix in place method normal Construction of granular sub-base by providing local material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at once and compacting with smooth wheel roller to achieve the desired density complete as per Clause 401.4 as per Technical Specification Clause 408.Using Gravel mix soil
WBM Grading 2 Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405.crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405.
(WBM G-3) Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405.
Providing and applying primer coat with Bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.90- 1.2 kg/sqm using mechanical means as per Technical Specification Clause 502. (Medium porosity)
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503.
20 mm thick Open Graded Premix Carpet using Bitumen Emulsion as per Technical Specification Clause 508.2
Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type B as per Technical Specification Clause 510 (Bitumen (VG-10))
Providing and fixing of kilometer stone as per standard drawing made of precast R:C:C 1:2:4 fixed with C.C 1:3:6 including excavation of pit, painting and printing letters on kilometer stone with two coat of approved synthetic enamel paint of approved .
Same as above item No. but for 200 meter stone
Same as above item No. but for 5th Km. stone
Providing and fixing of PMGSY Logo board at starting point, as per attached standard drawing duly painted and writen as per MORD specification and direction by Engineer in charge
Providing and fixing of PMGSY Logo board at end point and every 2 Km, as per attached standard drawing duly painted and writen as per MORD specification and direction by Engineer in charge
Providing and fixing of Title Information Board with PMGSY Logo at suitable place in the starting of the road as per attached standard drawing duly painted and writen as per MORD specification and direction by Engineer in charge
Providing and fixing of Citizen information board with PMGSY Logo at at starting and prominent location (where maximum no. of fitizens can view the detail of the road)as per attached standard drawing duly painted and writen as per MORD specification and direction by Engineer in charge
Providing and fixing of Trafic Sign Boards )Cautionary, mandatory & infomatory( as per attached drawing duly painted and writen as per MORD specification and direction by Engineer in charge
Providing and fixing of semi reflective Direction and Place identification sign boards up to 0.90 sqm as per attached drawing and direction by Engineer in charge
Providing and fixing of semi reflective Direction and Place identification sign boards more then 0.90 sqm as per attached drawing and direction by Engineer in charge
Emergency Maintenance
Deploping Hydraulic Excavaters of 0.90 cum Bucket opening of road with required slip clearance in all type of soil, Rock and boulders including it oprator , fuel, all other charge and taxes required for proper complection of work.
Ist Year
IInd Year
IIIrd Year
Ivth Year
Vth Year
Slip clearance in all type of soil, Rock and Boulders in major slip including cast of all material, machine, T&P and taxes etc required for proper complection of work as per MORd specifications, clause 1611.
Ist Year
IInd Year
IIIrd Year
Ivth Year
Vth Year
Random Rubble stone masonary in Coolie walling including supply of all material, labour, T&P etc. required for proper completion of the work.(As per PWD Uttarakhand specifications)
Ist Year
IInd Year
IIIrd Year
Ivth Year
Vth Year
Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25 kg each as per drawing and technical specifications Clause 1301
Ist Year
IInd Year
IIIrd Year
Ivth Year
Vth Year
Maintainance Activities:PBMC
1] Trimming of grass and weeds from the shoulders/berms and disposing off the same to suitable locations as per technical specifications Clause 1914. 2] Maintenance of road side Drains including minor slip clearence , reshaping ,deepening and ,regrading ,as well as catch water drains as per technical specification Clause 1907. 3] Maintenance of shoulders to the required level by filling/cutting the soil and its compacting including disposal of the surplus material in approved muck disposal points as per specification clause 1903 . 4] Maintenance of scuppers & Culverts by way of clearing, Cleaning, Erosion repair, repairs to cracks, parapet walls and Protection works as per drawing and technical specification Clasue 1908. 5] Maintenance of Causeway by way of minor Surface repairs, replacing Guide Posts, repair of flood gauges, removal of debris, providing boulders and protection work and painting as per technical specification Clause 1909. 6] Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as per drawings and technical specification Clause 1910. 7] Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912. 8] Repairing of pot holes by removal of loose material, trimming of sids, cleaning of surface and providing tack coat bitumen imulsion and patch repair with 20 mm thick premix carpeting and Type B seal coat using bitumen or catonic bitumen imulsion (in 3rd and 5th year). 9] Two coat white washing on parapet walls of CD work ,edge stones, tree truncks, and prominent rock patches on hill sides including preparation of surface by cleaning scraping etc. as per technical specifications Clause 191.
Ist Year
IInd Year
IIIrd Year
Ivth Year
Vth Year
tikam singh rana
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .