| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.2 CrAdmitted-Finance | -10.10% | ₹1.2 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.4 CrAdmitted-Finance | +2.00% | ₹1.4 Cr | L2 | Admitted-Finance |
| 3 | L3₹1.5 CrAdmitted-Finance BHAJAN GARH KAILASH GATE MUNI KI RETI DISTT TEHRI GARHWAL | +5.00% | ₹1.5 Cr | L3 | Admitted-Finance |
| 4 | L4₹1.7 CrAdmitted-Finance | +22.55% | ₹1.7 Cr | L4 | Admitted-Finance |
Tender Value
₹1.2 Cr
EMD Value
₹2 L
Closing Date
26 Jun 2026, 2:00 pmClosed
GM WCS
GM WEX HEEP BHEL HARIDWAR
CIVIL WORK FOR CONSTRUCTIION OF FOUNDATION FOR CNC 5 AXIS MACHINE IN BAY 1 NEW TURBINE SHOP HEEP HARIDWAR
2026_BHEL_61996_1
BHEL/HEEP/WEX-WCS/26-27/ 6200/202600121 Dt 05.06.2026
Open Tender
Civil Works
Percentage
274 days
HEEP Haridwar
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹2 L
10 Aug 2026
5 Jun 2026
26 Jun 2026
5 Jun 2026
26 Jun 2026
5 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Carriage of materials by mechanical transport including loading, unloading and stacking: Lime, moorum, building rubbish:2 km Unit:cum | 80 | cum | 75.15 | ₹6,012 |
| 2 | Carriage of materials by mechanical transport including loading, unloading and stacking: Earth:2 km Unit:cum | 1,500 | cum | 93.94 | ₹1,40,910 |
| 3 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth. 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5m, disposed earth to be levelled and neatly dressed.: All kinds of soil Unit:cum | 2,500 | cum | 129.35 | ₹3,23,375 |
| 4 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. Unit:cum | 1,000 | cum | 83.8 | ₹83,800 |
| 5 | Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials.:All kinds of soil Unit:cum | 2,500 | cum | 34.6 | ₹86,500 |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering-All work upto plinth level:1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) Unit:cum | 20 | cum | 4,514.05 | ₹90,281 |
| 7 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering-All work upto plinth level:1:3:6 (1 Cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) Unit:cum | 60 | cum | 4,024 | ₹2,41,440 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for ::Foundations, footings, bases of columns, etc. for mass concrete Unit:sqm | 300 | sqm | 166.9 | ₹50,070 |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form for :: Edges of slabs and breaks in floors and walls:Under 20 cm wide Unit:metre | 60 | metre | 99.45 | ₹5,967 |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form for :: Edges of slabs and breaks in floors and walls:Above 20 cm wide Unit:sqm | 20 | sqm | 441.1 | ₹8,822 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.36 MB
Tendernotice_2.pdf
PDF • 1.08 MB
BOQ_67179.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].