Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹21.0 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹21.7 L+₹63,294.54 (3.01%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹25.3 L+₹4.2 L (20.1%)Rejected-AOC EDATHILCHIRA PRASANTHI VARANAM P O CHERTHALA ALAPPUZHA 688555 | CHERTHALA | ALAPPUZHA | KERALA | 688555 | L3 | Rejected-AOC L3 |
Tender Value
₹23.4 L
EMD Value
₹50,000
Closing Date
27 Mar 2021, 1:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
HOU(T)
KMML, Chavara
Area clearing/sectioning,Earth work, Solling, PCC, RCC
2021_KMML_420586_1
KMML/TP/M/C/T/14/20, Dtd 17/03/2021
Open Tender
Civil Works - Buildings
Item Rate
120 days
KMML, Chavara
Please refer Tender documents.
6 documents required · 6 mandatory
₹2,950
₹50,000
9 Aug 2021
19 Mar 2021
29 Mar 2021
19 Mar 2021
27 Mar 2021
19 Mar 2021
120 days
Sectioning works : Area grading/ Sectioning not exceeding 30 cm in depth but exceeding 1.5m in width as well as 10 sqm on plan including disposal of excavated earth up to 50 m and lift up to 1.5 m, disposed soil to be levelled and neatly dressed: All Kinds of soil
Brickwork Demolition : Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar
Earthwork Excavation : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
PCC 1:4:8 : Providing and laying in position cement concrete of specified grade excluding the cost of cement, centering and shuttering - All work up to plinth level:<br>1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
RCC works : Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:<br>1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size excluding cost of cement and TMT steel bars.
Centering and shuttering : Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
Steel reinforcement works excluding cost of steel bars : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth level; Thermo - Mechanically Treated bars of grade Fe-500D or more
Taking soil from MS unit or any other area within 2 kms : Taking excavated soil from MS unit or any other location within 2 kilumeters as per the instruction of engineer-in-charge. Consider 1 JCB and 2 Tippers for the work.<br>JCB will work for 8 hours.<br>2 Tippers will transfer 3 trips in a day and will carry 48 m3 of excavated soil from MS unit to TP unit
Soling with soling stone of size 200mm : Soling with rough stone of size 200 mm, well packed and filling voids with available earth and stone chips for subbase below road work and foundations.
Filling the available earth inside basement , compacting in layers not exceeding 30 cm: Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
Miscellaneous Labours
Laying polythene sheet 400 G below concrete surfaces : Laying polythene sheets of 400 G below concrete works
ARUN REMESH
Amrita builders
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .