Tender Value
₹1.1 Cr
EMD Value
₹2.1 L
Closing Date
1 Oct 2026, 3:00 pm
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
S AND T
20 conditions · 3 needing a document upload
Financial Eligibility Criteria: The tenderer must have minimum average annual contractual turnover of V/N or V whichever is less, where V= Advertised value of the tender in crores of Rupees, N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure -VI B, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/Certificate from Chartered Accountant duly supported by Audited Balance Sheet. Format of Annexure VI B is attached with document tab for reference.
Date of inviting tender shall be the date of publishing tender notice on IREPS website if tender is published on website or the date of publication in newspaper in case tender is not published on website.
The balance sheet and all other financial documents attested/certified by CAs to substantiate fulfilment of Financial Eligibility Criteria should be with UDIN (Unique Document Identification Number), failing which the offer is likely to be rejected without any further reference.
(a)The tenderer must have successfully completed or substantially completed any one of the following categories of work(s)during last 07 years ending last day of month previous to the one in which tender is invited:Three similar works each costing not less than the amount equal to 30% of advertised value of the tender or Two similar works each costing not less than the amount equal to 40% of advertised value of the tender,or One similar work costing not less than the amount equal to 60% of advertised value of the tender.b(1)In case of tenders for composite works(e.g.works involving more than one distinct component, such as Civil Engineering works, S&T works, Electrical works, OHE works etc. and in the case of major bridges-substructure, superstructure etc),tenderer must have successfully completed or substantially completed any one of the following categories of work(s)during last07(seven)years, ending last day of month previous to the one in which tender is invited:(i)Three similar works each costing not less than the amount equal to 30% of advertised value of each component of tender, or(ii)Two similar works each costing not less than the amount equal to 40% of advertised value of each component of tender, or(iii)One similar work each costing not less than the amount equal to60% of advertised value of each component of tender. Note for b(1):Separate completed works of minimum required values shall also be considered for fulfillment of technical eligibility criteria for different components.(b) (2) In such cases, what constitutes a component in a composite work shall be clearly pre-defined with estimated tender cost of it, as part of the tender documents without any ambiguity.(b)(3)To evaluate the technical eligibility of tenderer, only components of work as stipulated in tender documents for evaluation of technical eligibility, shall be considered. The scope of work covered in other remaining components shall be either executed by tenderer himself if he has work experience as mentioned in clause7of the Standard General Conditions of Contractor through subcontractor fulfilling the requirements as per clause7of the Standard General Conditions of Contract or jointly i.e, partly himself and remaining through subcontractor, with prior approval of Chief Engineer in writing. However, if required in tender documents by way of Special Conditions, a formal agreement duly notarised, legally enforceable in the court of law, shall be executed by the main contractor with the subcontractor for the component(s) of work proposed to be executed by the subcontractor(s),and shall be submitted along with the offer for considering subletting of that scope of work towards fulfilment of technical eligibility. Such subcontractor must fulfill technical eligibility criteria as follows: The subcontractor shall have successfully completed at least one work similar to work proposed for subcontract, costing not less than 35% value of work to be subletted, in last 5 years, ending last day of month previous to the one in which tender is invited through a works contract. Note: for subletting of work costing up to Rs 50lakh,no previous work experience of subcontractor shall be asked for by the Railway. In case after award of contract or during execution of work it becomes necessary for contractor to change subcontractor, the same shall be done with subcontractor(s)fulfilling the requirements as per clause7of the IRSGCC,with prior approval of Chief Engineer in writing.
Work experience certificate from private individual shall not be considered. However, in addition to work experience certificates issued by any Govt. Organisation, work experience certificate issued by Public listed company having average annual turnover of Rs 500 crore and above in last 3 financial years excluding the current financial year, listed on National Stock Exchange or Bombay Stock Exchange, incorporated/registered at least 5 years prior to the date of closing of tender, shall also be considered provided the work experience certificate has been issued by a person authorized by the Public listed company to issue such certificates. In case tenderer submits work experience certificate issued by public listed company, the tenderer shall also submit along with work experience certificate, the relevant copy of work order, bill of quantities, bill wise details of payment received duly certified by Chartered Accountant, TDS certificates for all payments received and copy of final/last bill paid by company in support of above work experience certificate.
Explanation for Eligibility Criteria- 1. Substantially Completed Work means an ongoing work in which payment equal to or more than 90% of the present contract value (excluding the payment made for adjustment of Price variation (PVC), if any) has been made to the contractor in that ongoing contract and no proceedings of termination of contract on Contractor's default has been initiated. The credential certificate in this regard should have been issued not prior to 60 days of date of invitation of present tender. 2. In case a work is started prior to 07 (seven) years, ending last day of month previous to the one in which tender is invited, but completed in last 07 (seven) years, ending last day of month previous to the one in which tender is invited, the completed work shall be considered for fulfillment of credentials. 3. If a work is physically completed and completion certificate to this extent is issued by the concerned organization but final bill is pending, such work shall be considered for fulfillment of credentials 4. In case of completed work, the value of final bill (gross amount) including the PVC amount (if paid) shall be considered as the completion cost of work. In case final bill is pending, only the total gross amount already paid including the PVC amount (if paid) shall be considered as the completion cost of work. In case of substantially completed work, the total gross amount already paid including the PVC amount (if paid), as mentioned in the certificate, shall be considered as the cost of substantially completed work. 5. If a 1.1.1 bidder has successfully completed a work as subcontractor and the work experience certificate has been issued for such work to the subcontractor by a Govt. Organization or public listed company as defined in Note for Item 10.1 Para 10 of the Tender Form (Second Sheet) of GCC JULY 2022, the same shall be considered for the purpose of fulfillment of credentials. 6. In case a work is considered similar in nature for fulfillment of technical credentials, the overall cost including the PVC amount (if paid) of that completed work or substantially completed work, shall be considered and no separate evaluation for each component of that work shall be made to decide eligibility. 7. In case of newly formed partnership firm, the credentials of individual partners from previous propriety firm(s) or dissolved previous partnership firm(s) or split previous partnership firm(s), shall be considered only to the extent of their share in previous entity on the date of dissolution / split and their share in newly formed partnership firm. For example, a partner A had 30% share in previous entity and his share in present partnership firm is 20%. In the present tender under consideration, the credentials of partner A will be considered to the extent of 0.3*0.2*value of the work done in the previous entity. For this purpose, the tenderer shall submit along with his bid all the relevant documents which include copy of previous partnership deed(s), dissolution deed(s) and proof of surrender of PAN No.(s) in case of dissolution of partnership firm(s) etc.
8. In case of existing partnership firm, if any one or more partners quit the partnership firm, the credentials of remaining partnership firm shall be re-worked out i.e., the quitting partner(s) shall take away his credentials to the extent of his share on the date of quitting the partnership firm(e.g. in a partnership firm of partners A, B & C having share 30%, 30% & 40% respectively and credentials of Rs 10 crore; in case partner C quits the firm, the credentials of this partnership firm shall remain as Rs 6 crore). For this purpose, the tenderer shall submit along with his bid all the relevant documents which include copy of previous partnership deed(s), dissolution deed(s) and proof of surrender of PAN No.(s) in case of dissolution of partnership firm(s) etc.9. In case of existing partnership firm if any new partner(s) joins the firm without any modification in the name and PAN/TAN no. of the firm, the credentials of partnership firm shall get enhanced to the extent of credentials of newly added partner(s) on the same principles as mentioned in item 6 above. For this purpose, the tenderer shall submit along with his bid all the relevant documents which include copy of previous partnership deeds, dissolution/splitting deeds and proof of surrender of PAN No.(s) in case of dissolution of partnership firm etc. 10. Any partner in a partnership firm cannot use or claim his credentials in any other firm without leaving the 1.1.2 partnership firm i.e., In a partnership firm of A&B partners, A or B partner cannot use credentials of partnership firm of A&B partners in any other partnership firm or propriety firm without leaving partnership firm of A&B partners. 11. In case a partner in a partnership firm is replaced due to succession as per succession law, the proportion of credentials of the previous partner will be passed on to the successor.12. If the percentage share among partners of a partnership firm is changed, but the partners remain the same, the credentials of the firm before such modification in the share will continue to be considered for the firm as it is without any change in their value. Further, in case a partner of partnership firm retires without taking away any credentials from the firm, the credentials of partnership firm shall remain the same as it is without any change in their value. 13. In a partnership firm "AB" of A&B partners, in case A also works as propriety firm "P" or partner in some other partnership firm "AX", credentials of A in propriety firm "P" or in other partnership firm "AX" earned after the date of becoming a partner of the firm AB shall not be added in partnership firm AB.14. In case a tenderer is LLP, the credentials of tenderer shall be worked out on above lines similar to a partnership firm. 15. In case company A is merged with company B, then company B would get the credentials of company A also.
Date of inviting tender shall be the date of publishing tender notice on IREPS website if tender is published on website or the date of publication in newspaper in case tender is not published on website.
Definition of Similar Work :-Any of the Following works are considered as similar nature of work--->>> (1)Track Circuit, (2)LVCD, (3)LC Gate Interlocking, (4)Electro-mech. Rehabilitation, (5)Panel Work (Outdoor), (6)Panel Work (Indoor), (7)Panel Work (Outdoor+Indoor), (8)RRI Work (Outdoor), (9)RRI Work (Indoor), (10)RRI Work (Outdoor+Indoor), (11)EI/SSI Work (Outdoor), (12)EI/SSI Work (Indoor), (13)EI/SSI Work (Outdoor+Indoor), (14)4/6 Quad Cable outdoor work, (15)4/6 Quad Cable & OFC outdoor work, (16) OFC outdoor work, (17)Electronic Telephone Exchange Work(Indoor), (18)Electronic Telephone Exchange Work(Outdoor), (19) Electronic Telephone Exchange Work (Indoor +Outdoor), (20)SDH Indoor Equipment for OFC Communication, (21)Train Indication Board, (22)Train Indication Board Coach Indication Board, (23)Coach Guidance Display Board, (24)Integrated Passenger Information System, (25)GPS based Platform Digital Clock, (26) Networking for 500 users(min) with creation of AD Server, VLAN configuration, implementation of CNS and NMS in any Govt Sector/Semi Govt/Govt undertaking/PSU, (27)CCTV Work.
44 conditions · 8 needing a document upload
A copy of certificate stating that they are not liable to be disqualified and all their statements/documents submitted along with bid are true and factual. Standard format of certificate to be submitted by the bidder is enclosed as per Annexure V. In addition to Annexure-V, in case of other than Company/Proprietary firm, Annexure-V(A) shall also be submitted by the each member of a Partnership Firm/Joint Venture (JV)/Hindu Undivided Family (HUF)/Limited Liability Partnership (LLP) etc. as the case may be. Non submission of a copy of certificate by the bidder shall result in summarily rejection of his/their bid. It shall be mandatorily incumbent upon the tenderer to identify, state and submit the supporting documents duly self attested/digitally signed by which they/he are/is qualifying the Qualifying Criteria mentioned in the Tender Document.
Payment of Supply Items: - Upon successful delivery at the designated Store, 80% of Agreement value of the supply items shall be paid. Balance 20% shall be released after successful execution/installation/commissioning of the items. (An undertaking regarding acceptance of payment conditions must be submitted at the time of bidding)
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Mandate form containing PAN No. should be uploaded.
The Tenderer must go through the IR GCC- 2022 available in the documents section and submit the Documents regarding constitution of the firm viz.(i) Proprietorship affidavit/ declaration, Partnership Firm/Company/Joint Venture (JV)/Registered Society/Registered Trust, MOA (Memorandum of Association)/AOA(Articles of Association) of the company; and (ii)A copy of Authorization/Power of Attorney issued by the Company (backed by the resolution of Board of Directors)in favour of the individual to sign the tender on behalf of the company must be submitted by the Tenderer etc. In absence of such documents the tender shall be treated as having been submitted by the individual who has signed the tender. Besides the above the tenderer also has to submit a declaration regarding blacklisted/ not blacklisted
As per GCC-2022(i)The tenderer shall clearly specify whether the tender is submitted on his own(Proprietary Firm)or on behalf of a Partnership Firm/Company/Joint Venture (JV)/Registered Society/Registered Trust/HUF etc. The tenderer(s)shall enclose the attested copies of the constitution of their concern, and copy of PAN Card along with their tender. Tender Documents in such cases are to be signed by such persons as may be legally competent to sign them on behalf of the firm, company, association, trust or society, as the case may be(ii)Following documents shall be submitted by the tenderer: a)Sole Proprietorship Firm:(i)An undertaking that he is not blacklisted or debarred by Railways or any other Ministry/Department of Govt. of India from participation in tender on the date of opening of bids, either in individual capacity or as a member of the partnership firm or JV in which he was/is a partner/member. Concealment/wrong information in regard to above shall make the contract liable for determination under Clause 62 of the GCC of Contract(b)HUF:(i)A copy of notarized affidavit on Stamp Paper declaring that he who is submitting the tender on behalf of HUF is in the position of 'Karta' of Hindu Undivided Family (HUF) and he has the authority, power and consent given by other members to act on behalf of HUF.(ii)An undertaking that the HUF is not blacklisted or debarred by Railways or any other Ministry/Department of Govt. of India from participation in tender on the date of opening of bids, either in individual capacity or as a member of the partnership firm or JV in which HUF was/is a partner/member. Concealment/wrong information in regard to above shall make the contract liable for determination under Clause 62 of the GCC.(C)For partnership firm The Tenderer shall submit -(i)A notarized copy of partnership deed.(ii)A notarized or registered copy of Power of Attorney in favour of the individual to tender for the work, sign the agreement etc. and create liability against the firm.(iii)An undertaking by all partners of the partnership firm that they are not blacklisted or debarred by Railways or any other Ministry/ Department of the Govt. of India from participation in tenders/contracts as on the date of opening of bids, either in their individual capacity or in any firm in which they were / are partners. Concealment /wrong information in regard to above shall make the contract liable for determination under Clause 62 of the General Conditions of Contract.(D)Company registered under Companies Act 2013:(i)The copies of MOA(Memorandum of Association) / AOA (Articles of Association) of the company. (ii)A copy of Certificate of Incorporation.(iii) A copy of Authorization/Power of Attorney issued by the Company (backed by the resolution of Board of Directors) in favour of the individual to sign the tender on behalf of the company and create liability against the company.(iv)An undertaking that the Company is not blacklisted or debarred by Railways or any other Ministry/Department of Govt. of India from participation in tender on the date of opening of bids, either in individual capacity or as a member of the partnership firm or JV in which the Company was/is a partner/member. Concealment/wrong information in regard to above shall make the contract able for determination underClause62GCC(e)Registered Society & Registered Trust and LLP-Tenderer shall submit documents as per Clause 14 of GCC-2022.
(I)If it is NOT mentioned in the submitted tender that tender is being submitted on behalf of a Sole Proprietorship firm / Partnership firm / Joint Venture /Registered Company etc., then the tender shall be treated a s having been submitted by the individual who has signed the tender.(II)After opening of the tender, any document pertaining to the constitution of Sole Proprietorship Firm/ Partnership Firm / Registered Company/ Registered Trust / Registered Society / HUF etc. shall be neither asked nor considered, if submitted. Further, no suo moto cognizance of any document available in public domain (i.e., on internet etc.) or in Railway's record/office file set c. will be taken for consideration of the tender, if no such mention is available in tender offer submitted. (III)A tender from JV / Partnership firm etc. shall be considered only where permissible as per the tender conditions. (IV)The Railway will not be bound by any change in the composition of the firm made subsequent to the submission of tender. Railway may, however, recognize such power of attorney and changes after obtaining proper legal advice, the cost of which will be chargeable to the Contractor.
The tenderer whether his own(Proprietary Firm)or on behalf of a Partnership Firm/Company/Joint Venture (JV)/Registered Society/Registered Trust/HUF etc shall also submit all documents as per instructions given in the General Conditions of contract- 2022(Second Sheet) wherever applicable. Tenderer are thus advised to read the same before submitting their bids and upload the required documents.
A declaration regarding engagement/employment/ partnership etc. (or Not) of retired Railway employees should be uploaded by the Tenderer.
The list of personnel/organization on hand and proposed to be engaged for the tendered work. Similarly list of Plant & Machinery available on hand and proposed to be inducted and hired for the tendered work.
The tenderers shall submit a copy of certificate stating that all their statements/documents submitted along with bid are true and factual. Standard format of certificate to be submitted by the bidder is enclosed as per Annexure V. In addition to Annexure-V, in case of other than Company/Proprietary firm, Annexure-V(A) shall also be submitted by the each member of a Partnership Firm/Joint Venture (JV)/Hindu Undivided Family (HUF)/Limited Liability Partnership (LLP) etc. as the case may be. Non submission of above certificate(s) by the bidder shall result in summarily rejection of his/their bid. It shall be mandatorily incumbent upon the tenderer to identify, state and submit the supporting documents (if any) duly self attested. NOTE- Format of Annexure V is also enclosed in document Tab for references.
For Sole Proprietorship Firm: (i) An undertaking that he is not blacklisted or debarred by Railways or any other Ministry / Department of Govt. of India from participation in tender on the date of opening of bids, either in individual capacity or as a member of the partnership firm or JV in which he was / is a partner/member. Concealment / wrong information in regard to above shall make the contract liable for determination under Clause 62 of the General Conditions of Contract.
For Partnership Firm :-(i) A notarized copy of partnership deed. (ii) A notarized or registered copy of Power of Attorney in favour of the individual to tender for the work, sign the agreement etc. and create liability against the firm. (iii) An undertaking by all partners of the partnership firm that they are not blacklisted or debarred by Railways or any other Ministry / Department of the Govt. of India from participation in tenders / contracts as on the date of opening of bids, either in their individual capacity or in any firm in which they were / are partners. Concealment / wrong information in regard to above shall make the contract liable for determination under Clause 62 of the General Conditions of Contract.
For Company registered under Companies Act-2013 :- (i) The copies of MOA (Memorandum of Association) / AOA (Articles of Association) of the company (ii) A copy of Certificate of Incorporation (iii) A copy of Authorization/Power of Attorney issued by the Company (backed by the resolution of Board of Directors) in favour of the individual to sign the tender on behalf of the company and create liability against the company.All other documents in terms Para 10 of the Tender Form (Second Sheet of the GCC) (iv) An undertaking that the Company is not blacklisted or debarred by Railways or any other Ministry / Department of Govt. of India from participation in tender on the date of opening of bids, either in individual capacity or as a member of the partnership firm or JV in which the Company was / is a partner/member. Concealment / wrong information in regard to above shall make the contract liable for determination under Clause 62 of the General Conditions of Contract.
Registered Society & Registered Trust:(i) A copy of Certificate of Registration (ii) A copy of Memorandum of Association of Society/Trust Deed (iii) A copy of Power of Attorney in favour of the individual to sign the tender documents and create liability against the Society/Trust. (iv) A copy of Rules & Regulations of the Society (v) All other documents in terms of Para 10 of the Tender Form (Second Sheet of the GCC)
LLP (Limited Liability Partnership): (i) A copy of LLP Agreement (ii) A copy of Certificate of Incorporation (iii) A copy of Power of Attorney/Authorization issued by the LLP in favour of the individual to sign the tender on behalf of the LLP and create liability against the LLP. (iv) An undertaking by all partners of the LLP that they are not blacklisted or debarred by Railways or any other Ministry / Department of the Govt. of India from participation in tenders / contracts as on the date of submission of bids, either in their individual capacity or in any firm/LLP or JV in which they were / are partners/members. Concealment / wrong information in regard to above shall make the contract liable for determination under Clause 62 of the Standard General Conditions of Contract. (v) All other documents in terms of Para 10 of the Tender Form (Second Sheet of the GCC)
HUF- A copy of notarized affidavit on Stamp Paper declaring that he who is submitting the tender on behalf of HUF is in the position of 'Karta' of Hindu Undivided Family (HUF) and he has the authority, power and consent given by other members to act on behalf of HUF. (ii) An undertaking that the HUF is not blacklisted or debarred by Railways or any other Ministry / Department of Govt. of India from participation in tender on the date of opening of bids, either in individual capacity or as a member of the partnership firm or JV in which HUF was / is a partner/member. Concealment / wrong information in regard to above shall make the contract liable for determination under Clause 62 of the General Conditions of Contract.
An undertaking by all partners/members of JV / HUF/proprietor etc, of the partnership firm or JV or HUF or Proprietorship Firm etc. as the case may be that they are not blacklisted or debarred by Railways or any other Ministry/ Department of the Govt. of India from participation in tenders/contracts as on the date of opening of bids, either in their individual capacity or in any firm in which they were / are partners/ members/Proprietors/HUF etc. as the case may be is to be submitted.
Clarification of Bids: To assist in the examination, evaluation & comparison and prequalification of the Tender, the Railway may, at its discretion, ask any Bidder for a clarification of its Bid. Any clarification submitted by a Bidder that is not in response to a request by the Railway shall not be entertained or considered. The Railway request for clarification and the response of the bidder in this regard shall be in writing. However, if a Bidder does not provide clarification of its bid by the date and time communicated in the Railway request for clarification, the bid shall be evaluated as per the documents submitted along with the bid.
The tenderer whether sole proprietor / a company or a partnership firm / registered society / registered trust / HUF / LLP etc if they want to act through agent or individual partner(s), should submit along with the tender, a copy of power of attorney duly stamped and authenticated by a Notary Public or by Magistrate in favour of the specific person whether he/they be partner(s) of the firm or any other person, specifically authorizing him/them to sign the tender, submit the tender and further to deal with the Tender/ Contract up to the stage of signing the agreement except in case where such specific person is authorized for above purposes through a provision made in the partnership deed / Memorandum of Understanding / Article of Association /Board resolution, failing which tender shall be summarily rejected. A separate power of attorney duly stamped and authenticated by a Notary Public or by Magistrate in favour of the specific person whether he/they be partner(s) of the firm or any other person, shall be submitted after award of work, specifically authorizing him/them to deal with all other contractual activities subsequent to signing of agreement, if required. Note: A Power of Attorney executed and issued overseas, the document will also have to be legalized by the Indian Embassy and notarized in the jurisdiction where the Power of Attorney is being issued. However, the Power of Attorney provided by Bidders from countries that have signed the Hague Legislation Convention 1961 are not required to be legalized by the Indian Embassy if it carries a conforming Appostille certificate.
The Tender Form(First Sheet) available in the document section must be filled in by the tenderer and uploaded duly filled in.
The Tenderer must go through the Tender Form(Second Sheet) thoroughly and submit all the required documents even if not clearly mentioned in the Conditions or compliances in the Tender document.
Letter of Credit as Mode of Payment in Works Tender or Service Tender has been introduced as per Rly Board's letter no. 2018/CE-I/CT/9, New Delhi, dtd: 04.06.2018. The details in this regard are given in Special conditions of contract which may be seen by the tenderers before bidding in IREPS Portal.
Tenderers(s) should read carefully the instructions given in the Tender Form (Second Sheet) of Indian Railway Standard General Conditions of Contract-2022 and submit all the required documents in compliance to the Instructions containing in the said Tender Form (Second Sheet). A copy of the Indian Railway Standard General Conditions of Contract(GCC)- 2022 is available in the document section.
S&T work for Construction of Bridges and other associated works for Drainage improvement of TATA East Yard.
ST-CKP-OT-26-27-91~SER
ST-CKP-OT-26-27-91
Open
Works - General
12 Months
West Singhbhum, Jharkhand
₹0
₹2.1 L
9 Sept 2026
9 Sept 2026
17 Sept 2026
98 items across 5 schedules · ₹1,07,26,270.75 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| 1 | Excavation of trench in all kinds of soils including soft rocky area and clearing of roots of trees,rocks, bushes,ballast & reconditioningetc.including bailing out water and disposal of extra soil including back filling with excavated earth and ramming o f trenches after cable laying for the following depths and widths as specified in Technical Circular No. 2 of 1988 & 01/2010 issued by CSTE/SER. Note:- In case, trenches are other than prescribed depth & width, Proportionate payment shall be released. (i) Depth 1.0 meter, Width 0.3 meter. | Kilometre 4.00 | — | 79,869 | 3,19,476 |
| 2 | Excavation of trench in all kinds of soils including soft rocky area and clearing of roots of trees,rocks, bushes,ballast & reconditioningetc.including bailing out water and disposal of extra soil including back filling with excavated earth and ramming o f trenches after cable laying for the following depths and widths as specified in Technical Circular No. 2 of 1988 & 01/2010 issued by CSTE/SER. Note:- In case, trenches are other than prescribed depth & width, Proportionate payment shall be released. (ii) Depth 1.2 meter, Width 0.5 meter. | Kilometre 1.00 | — | 95,893 | 95,893 |
| 3 | Laying of S&T Cables (Signal/Quad/Power) in the excavated trench to Drawing No. CON/SK/T/5 or latest. Supply and transportation of 'U' clamps, anchoring of cable at every 10 metres interval with 'U' clamp on trench to Drawing No. CSTE/ CON /CABLES/81 or latest. Supply, transportation, and placing of cable demarcating led belt to Drawing No. CON/ SK/ T/6 or latest punched at an interval of 30 metres and wrapped round each cable throughout the cable route and also at every track/ Road/ platform crossing as above specified in Technical Circular No. 2/1988 & 01/2010 issued by CSTE/SER or as per latest guidelines and guarding the cables. Collecting empty drums with left over cable and to be returned to the stores of stock holder. Note: Cables will be meggered before & after its laying by contractor under supervision of Railway representative & Contractor will submit their reports. | Kilometre 55.00 | — | 20,239 | 11,13,145 |
| 4 | Supply & laying of 300 mm X 100 mm pre- cast/cast in -situ RCC cable ducts including top cover as per RDSO drawing No. SDO/S&T/RCC DUCT/1018/1 & 2, dated 29.5.23 or latest. Note- The rate is inclusive of all type of transportation including labour till it is placed into trenches. The laying of cables shall be paid separately fulfilling the laying procedure as per above drawings. (Inspection by representative of Sr. DSTE/CKP) | Metre 300.00 | — | 2,926 | 8,77,800 |
| 5 | Supply, transportation and fixing of RCC Cable Route Marker as per SEM drawing No. 15-D1 or latest. (Inspection by representative of Sr. DSTE/CKP) | Numbers 50.00 | — | 576 | 28,800 |
| 6 | Physical tracing and opening/locating of existing working cables by precision digging for diversion of cables in connection with cable clearance for engineering earth work or for utility shifting without interfering the circuits as per the advice of Railway site engineer. | Metre 100.00 | — | 257 | 25,700 |
| 7 | Transportation of cables in rolls with or without wooden drums (S&T Cables) from concerned store to the site of works. Note: The unit Drum- KM indicates Drum X length of cable in that drum. It doesn't have any significance over the distance it has to be carried for execution of the work. | Drum-Km 55.00 | — | 2,328 | 1,28,040 |
| 8 | Transferring of Signaling/Telecom cables from existing Location box to New Location box. The work includes breaking/ Dismantling of Existing foundation of locations, excavating and removing / segregating coils of 2C/ 6C/ 12C/ 19C/24C/30C/Quad cables which may be about 10 mtrs. in length. These cables are to be disconnected and removed from the existing location one by one as per the instruction and under the supervision of Railway staff present at site. The cable is then to be inserted and terminated in new location box. The item includes neatly dressing of cable, making wiring tree etc. The material required to dressing /lacing will be arranged by contactor. The work is required to be done systematically and with due precaution during the block or disconnection within the time that may be allowed. The excavation work to be done carefully without damaging the cable to avoid undue failure. (Termination charges will be given separately). Note: Proportionate payment will be made if cable of other length. One No unit = One cable of 10 m length). | Numbers 4.00 | — | 362 | 1,448 |
| 9 | Termination of Outdoor Cables (Main Cables/tail cables) at location boxes, cable termination rack in relay room, station building, etc. The item includes dressing of cablesand wires with dressing threads as per standard practice. All material required for this item will be supplied by contractor. | Per 3500.00 Conductor | — | 9 | 31,500 |
| 10 | Transportation including loading/unloading of Optical Fibre Cable along with HDPE pipe from the stores of SSE/Store or from any store of SE Railway to the site with care and laying of HDPE pipe & blowing of OFC in it as per procedure and returning empty cable drums with or without left over cable to the stores of SSE/Store. It also includes supply and placing of warning & Detection tape orange colour of 100 mm wide printed in black as "CAUTION OFC CABLE" and laid throughout the trench as directed by the Representative of Railway. Note: OTDR of cables will be done before & after its laying by contractor under supervision of Railway representative & contractor will submit their reports. | Kilometre 16.00 | — | 34,734 | 5,55,744 |
| 11 | Splicing of Optical Fiber Core and routing in joint closure/ FDMS as per instruction of site Engineer. | CORE 768.00 | — | 152 | 1,16,736 |
| 12 | Installation, splicing and commissioning of Fibre Distribution Management system (FDMS) for 24 Fiber complete with all accessories such as patch cord & pigtail etc. as per TEC Spec. with latest amendment. The sundry material if required any to be supplied by contractor. | Numbers 4.00 | — | 4,016 | 16,064 |
| 13 | Blowing/Drawing/Pulling of OFC cable through already laid HDPE duct /GI pipe /DWC pipe etc. | Metre 1500.00 | — | 16 | 24,000 |
| 14 | Laying of HDPE duct in trench and its protective work as per direction of site engineer. | Metre 1500.00 | — | 6 | 9,000 |
| 15 | Transportation and fixing of following types of C.T. Box (Aluminium/Wago type) and termination of cable as per details of jointing schedule approved by the Railway Engineers. (i) 20 pair C.T. Box/Krone type DP Box. | Numbers 20.00 | — | 916 | 18,320 |
| 16 | Supply, transportation and installation of RCC joint chamber with two piece top cover and bottom cover with holes for drainage and cable entry, as per Drawing No. RDSO/ TCDO/COP-21 or latest. This includes trenching for jointing pit of size min 1.5 m X 1.5 m X 1.2m for all types of soils, back filling and ramming of the pit after placing the joint closure and cable loop in the chamber including dry sand upto 600mm height without causing any damage to same and consolidation of soil as well as disposal of excess soil. (Inspection by representative of Sr. DSTE/CKP) | Numbers 10.00 | — | 4,811 | 48,110 |
| 17 | Execution of Straight joint on Quad cable/ jelly filled Telecom cable using Thermo- shrink/Universal jointing kit (RTSF). This includes excavation of cable joint pit of size 1.5 m X 1.5 m X 1.2 m for jointing of cables, back filling and ramming after jointing. After jointing, the cable through test such as insulation test, continuity test etc. to be carried out jointly with Railway Engineer. If any defect or any damage is observed during jointing the contractor has to redo the joint free of cost. Note: In case jointing is required to be done in the Location boxes, then 80% payment will be released. | Numbers 20.00 | — | 1,437 | 28,740 |
| 18 | Mechanised Drilling/Micro Tunnelling under important/ busy metal/concrete road/Railway track and laying of GI pipe including supply (make: TATA/Jindal or better) of min.75mm inner diameter Grade Medium with Spec. No. IS- 1239, Pt-1, 2004 including supply, Boring and pulling cable upto 110mm dia. at a depth of min. 1 meter as per site condition. This also includes reinstatement of the surface to the original state. | Metre 350.00 | — | 2,215 | 7,75,250 |
| 19 | Supply, transportation and fixing of Galvanised Iron Pipe (make: TATA/Jindal or better) with threaded collars (for jointing pipe) of 80 mm nominal bore Specification No. IS: 1239, Pt-1, 2004 thickness 3.2 mm medium grade, on bridges, culverts, drain or at places as per instruction of the site Engineer including supply and transportation of materials required for fixing the pipe as per SEM Drawing No.15-D7 on culverts and others including drawing of cables inside the pipe with masonry work at bridge entry and exit of the culvert and curing for 72 hours and pipes are to be clamped at max. 2 meter apart with drilling of holes on the pipe at 10 cm apart for S&T Cables. Note:- This also includes dismantling of released GI Pipe/Trough and released material should be returned at concerned store. (Inspection by representative of Sr. DSTE/CKP) | Metre 250.00 | — | 1,018 | 2,54,500 |
| 20 | HDD: In case of short stretches (less than 100 m in single stretch) Micro Tunnelling through Horizontal directional drilling (HDD) machine, preparation of sites, boring and laying of HDPE pipes of size (Outer/Inner diameter= 50mm/42mm) for crossing of S&T cable through HDPE pipe at bridges/ culverts/track crossing/pucca road crossing. Boring trench shall be minimum 3 (three) meter below the surface/ river bed and minimum 1 m at track/road/pucca road crossing area etc. This includes supply of permanently lubricated HDPE telecom ducts of equal length as per Specification No. DSO/ SPN/ TC/ 45/2013 REVISION 2.0 with latest amendments. For each HDPE duct the following items are to be supplied as per requirement (a) End plug, (b) Cable sealing plugs, (c) Plastic coupler slip fit/push fit type & (d) End plugs to be provided along with drum. In case the site doesn't allow to perform as per schedule, written approval must be obtained from at least site incharge officer. Note: The boring profile should be recorded and submitted for verification of depth and length of boring. (i) 2 HDPE pipe. | Metre 150.00 | — | 1,572 | 2,35,800 |
| 21 | HDD: In case of short stretches (less than 100 m in single stretch) Micro Tunnelling through Horizontal directional drilling (HDD) machine, preparation of sites, boring and laying of HDPE pipes of size (Outer/Inner diameter= 50mm/42mm) for crossing of S&T cable through HDPE pipe at bridges/ culverts/track crossing/pucca road crossing. Boring trench shall be minimum 3 (three) meter below the surface/ river bed and minimum 1 m at track/road/pucca road crossing area etc. This includes supply of permanently lubricated HDPE telecom ducts of equal length as per Specification No. DSO/ SPN/ TC/ 45/2013 REVISION 2.0 with latest amendments. For each HDPE duct the following items are to be supplied as per requirement (a) End plug, (b) Cable sealing plugs, (c) Plastic coupler slip fit/push fit type & (d) End plugs to be provided along with drum. In case the site doesn't allow to perform as per schedule, written approval must be obtained from at least site incharge officer. Note: The boring profile should be recorded and submitted for verification of depth and length of boring. (ii) 4 HDPE pipe. | Metre 500.00 | — | 1,964 | 9,82,000 |
| 22 | Horizontal Drilling by using manual pushing method (also called moling) at minimum depth of 1.5 meter below the formation level of earth as per decision of Engineer in charge. Boring diameter should be atleast 110mm. The ground level shall be considered ignoring the bank height of the bank of the road. Note: DWC/ HDPE/GI Pipe Supply is covered under this item. Contactor shall provide all material required for work and adequate nos. of labours for proper laying of cables into the bore. Cable shall be laid cautiously so that it should not get damage due to rough handling & pressure on cable. Payment of boring shall be made only after laying of the cables into DWC/HDPE/GI pipe. | Metre 200.00 | — | 1,023 | 2,04,600 |
| 23 | Cement Concrete o f proportion 1:3:6 (Cement: Sand: Stone chips o f 2 5 m m nominal size) for miscellaneous items. I t includes excavation, ramming o f C C b y using vibrator, curing and plastering w i t h c e m e n t a n d sand mixture (aggregate w i l l n o t exceed b e y o n d 3 . 8 cm). Note: All materials required for foundation are to be supplied by the contractor. | cum 25.00 | — | 3,647 | 91,175 |
| 24 | Execution of Full Apparatus Case with earth excavation for pit, concrete foundation, surrounding earth work, erection and installation as per Drawing No. Con/SK/T/8 or latest and wiring to be done as per SEM Drawing No.19-D8 or as per direction of site engineer. Supply and fixing of Hylam sheet strip of appropriate size of 3 mm or 6 mm as required with hole for fixing of terminals, fuse blocks, relay and other accessories for signal/track circuit, termination of cable with number embossed ferrules, bunching of cables with PVC tape, proper soldering of cable armour with earth catenary wire, earthing of cable armour as required. Writing & terminal description including Painting of the apparatus case inside and outside after clearing the surface thoroughly and first coating of anticorrosive paint and subsequent two coats of Aluminium paint outside and red oxide inside and lettering etc. This also includes transportation of 25 mm/12mm Hylam sheet for shelf or as required and also includes minor modification in L/Boxes as per site requirement. The contractor shall supply 4 no. of foundation nuts & bolts of size 22 mm dia. x 450 mm long with 2 flat spring washers, with each nut & bolts, sand for filling up cable pit inside the apparatus case including plaster and bolts, nuts, screws, MS Clamps for fixing equipment/cable. Note: - Part payment shall be released after completion of- (i) Foundation- 40%, (ii) Erection - 10%, (iii) Wiring, earthing, testing - 20%, (iv) Painting, writings - 10%, (v) Plastering, sand filling & etc. - 10%, (vi) Commissioning - 10%. | Numbers 20.00 | — | 9,147 | 1,82,940 |
| 25 | Excavation of earth pit, placing & fixing of Earth electrode with construction of cement enclosure to SEM Drawing No. 19-D6 and drawl of 6 SWG GI/Copper cable from earth electrode to goomties/ relay room/cabin/station, etc. and drawl of MS flat 35mm x 6mm for signal post/Location box shall be used as the case may be, including fixing at both ends of the wire/MS flat. This includes transportation of materials. Note: Materials such as charcoals, salt, sal ammoniac, 6 SWG GI wire, copper lugs with Steel bolts & nuts etc. shall be supplied by the contractor. MS flat 35mm x 6mm/Copper cable shall be supplied by Railway. | Numbers 30.00 | — | 1,791 | 53,730 |
| 26 | Excavation of trenches at kacha roads/under the low flooded bridges/culverts or places as advised by the site in-charge of the Railway and placing of full RCC pipe 100 mm dia. inside excavated trenches of suitable depth at kacha road/ culverts and Concreting the collars at the places of joints and at both ends. Note:-RCC pipe 100 mm dia. with collars Spec. No. IS: 10262-2019 or latest and IS-456-2000 as per RCC structural drawing of SEM Drawing No. 15-D3 (Sheet-2) Class NP2 and concreting materials for collars will be supplied by the contractor. | Metre 80.00 | — | 446 | 35,680 |
| 27 | Supply, Transportation and laying of Split RCC pipe as per Spec. No. IS: 10262-2019 or latest and IS-456-2000 & SEM Drawing No.15-D3 having plain ends with their jointing loose split collar half round of size 250 mm (inner diameter)/25mm thickness at site over the single/multiple cable laid in the trench. (Inspection by representative of Sr. DSTE/CKP) | Metre 100.00 | — | 376 | 37,600 |
| 28 | Excavation of trench in all kinds of soils including soft rocky area and clearing of roots of trees, rocks etc. to a depth of 1 metre and width 0.3 mtr. Track/ Pucca road/Platform crossing/ Level crossing as per SEM Drawing No.15-D5 including supply, transportation and laying of DWC pipes (full) with collar(for jointing pipes) Inner diameter/Outer diameter:103mm/120mm to Specification No.14830 (Part-2): 2001 as per SEM Drawing No. 15-D4 and drawing of cable through DWC pipes with collar(for jointing pipes) including back filling and ramming after cable laying as specified in Tech. Circular No. 2 of 1988 & 01/2010 issued by CSTE/SER for S&T Cables or any latest guidelines. This includes repairing and plastering of Platform/Pucca road after cable laying. | Metre 300.00 | — | 691 | 2,07,300 |
| 29 | Provision of double bonding wire by drilling suitable holes as directed by site Engineer with contractor's materials such as channel pin, GI wire & other misc. Items as required at site. | Set 50.00 | — | 128 | 6,400 |
| 30 | Installation, testing and commissioning of track circuit on Point & Crossings as per Drawing No. SK/DRG/OL/27 or latest and track bonding plan. The work includes drilling of 9/32" hole on Rails, provision of bonding, fixing and painting of Track Lead Junction Boxes, termination of tail cables, termination of Track lead wires, double Jumper wires, Installation & wiring of track feed set (Track Charger, Adjustable Resistance, choke coil, fuses, battery, relays etc.), testing of Glued/Block Joints and also lettering/numbering of track lead junction boxes, block joints and track circuits. This also includes transportation of all materials required for the above installation. Note: Track feed set, bonding wires, TLJB, channel pin, tail cable to be supplied by Railway. | Set 4.00 | — | 8,108 | 32,432 |
| 31 | Transportation & Fixing of insulated lead wire in track circuits. This includes cutting of insulated lead wire in two pieces of required length (one of not less than 3.5 meter. & another not less than 1.5Mtr.) and eyelet of suitable diameter is to be crimped at one end of each wire. The crimped end is to be connected to the terminals of JB and the other end to be fixed to Rail with channel pin by removing existing channel pin etc. Note: All required sundry materials like channel pin, eyelet & insulated lead wire shall be supplied by the contractor. | Numbers 10.00 | — | 921 | 9,210 |
| 32 | Transportation, installation and charging of 2V lead acid type Secondary Cell and preparation of electrolyte for each cell. Charging to be done as per OEM's instruction with uninterrupted power supply in presence of Railway representative. After charging, it should be kept at the dedicated location as per use. Note- If power is not available at site of work, charging may be done at nearby location as per convenience of the railway. This includes transportation of uncharged cells at the site of charging, supply of acid, distilled water at the site of charging and transportation of charged cells back to the site of work. (i) 2 Volt 80AH. | Numbers 12.00 | — | 405 | 4,860 |
| 33 | Shifting of HASSDAC/SSDAC from old location and installation, wiring, testing and commissioning in new axle counter room/ location box. This includes fixing of DPs at site if shifting required, evaluator in relay room/ location box or goomties together with termination of cables, fixing and wiring of LV boxes, painting, lettering etc as required. Necessary insertion/ modification on the control/ indication panel to be carried out as per site condition. Note: 1 set means one end of the block section. | Set 4.00 | — | 22,461 | 89,844 |
| 34 | Shifting/re-locating, fixing, wiring, testing of existing MSDAC DP as per direction of site engineer of Railway. This includes excavation of trenches for fixing of Tx/Rx cable, foundation etc. if required and re-erection of same DP. Rail connect/Track device opening from railway track and refitted with rail connect accessories as per instruction of SSE/Sig in-charge of the section. Note: Track device means 01 DP of MSDAC. Any Rail connect/Track device accessories like nut & bolt, insulation etc. and damage during shifting has to be supplied by the contractor. | Per 30.00 Detection Point (DP) | — | 2,612 | 78,360 |
| 35 | Alteration/modification in existing location boxes, includes fixing/Removal or both the equipment, cable insertion, termination, wiring, testing & commissioning, two coat painting, lettering to suit the circuits as per approved wiring diagram. This includes filling with sand and plastering the same. Note: All the sundry materials such as paint, sand, cement, screws etc to be supplied by the contractor. | Numbers 8.00 | — | 2,734 | 21,872 |
| 36 | Transportation and installation of 2-Aspect Signal Post for MACLS as per drawing no. Con/SK/T/12 or SEM-Drawing No. 19-D3 or RDSO/M-00011RU dated 12.01.18 or latest complete with signal units, base, ladder and other fittings, excavation of earth pit, casting concrete foundation, erection of posts, thereof as specified in the note given in drawing, fixing of complete fittings of the signals with necessary earth screen protection arrangement as required including termination of cables, painting and lettering as required. Foundation nuts & bolts of appropriate size as per above drawings or latest as per RDSO Drawing No. SA-116 A/M confirming to IS: 226 and IRS:S-10/78 Rev.8. or latest to be supplied. | Numbers 1.00 | — | 10,788 | 10,788 |
| 37 | Transportation, installation of Position light Shunt Signal as per Con/SK/T/13 or SEM Drawing No. 19-D4 or latest complete with units, base and other fittings, excavation of earth pit, casting of concrete foundation thereof as per note given in drawing, fixing in complete fittings of signal including termination of cables, painting and lettering as required. Foundation nuts & bolts of size 20 mm x 305 mm as per RDSO Drawing No. SA-110 A/M confirming to IS: 226 and IRS:S-10/78 Rev.8. | Numbers 3.00 | — | 5,101 | 15,303 |
| 38 | Transportation and fixing of Calling ON Signals/ Guard Repeater unit/Dependent Shunt Signals / Illuminated 'A' / Illuminated 'AG' marker for MACLS on the erected signal post complete with marker including termination of cables, wiring, painting and lettering as required. | Numbers 1.00 | — | 2,367 | 2,367 |
| 39 | Transportation and fixing of Junction type Route Indicator with Route arm on the erected signal post including termination of cables, painting lettering as required.(a) Route Indicator with Route arm Three way. | Numbers 1.00 | — | 1,117 | 1,117 |
| 40 | Transportation, Installation, Wiring, Testing & Commissioning of LED Signals Lamps for Main signals Lighting Unit (i.e. Red/Yellow/Green) as per instruction of railway Engineer at the site. Note: LED particulars such as aspect, make, type, Sr. No. etc. to be recorded in proper in proper register. | Numbers 4.00 | — | 1,099 | 4,396 |
| 41 | Transportation, Installation, Wiring, Testing & Commissioning of LED Signals Lamps for Subsidiary signals lighting unit (i.e. Route aspect/Shunt Signal/Calling on aspect/A marker/AG marker etc.) as per instruction of railway Engineer at the site. Note: LED particulars such as aspect, make, type, Sr. No. etc. to be recorded in proper register. | Numbers 23.00 | — | 926 | 21,298 |
| 42 | Removal of normally 13m Rail in the way of cable route trench, signal/location box foundation, track crossing etc. In case of less or more than 13 m, proportionate payment to be done. These obstructions will be removed by the contractor for ensuring proper execution of related works. | Numbers 25.00 | — | 117 | 2,925 |
| 43 | Removal of PSC/Wooden/Steel sleeper in the way of cable route trench, signal/location box foundation, track crossing etc. These obstructions will be removed by the contractor for ensuring proper execution of related works. Note: In case of broken sleepers, proportionate payment will be made. | Numbers 25.00 | — | 118 | 2,950 |
| 44 | Cleaning of Debris and Bushes surrounding the Goomty/ Apparatus Case/Store Complex/under the existing running rod or any other Signalling installation as instructed by Engineer-in-charge. | Sqm 150.00 | — | 11 | 1,650 |
| 45 | Earth work around location boxes, signals etc. where necessary including 50 m lead and 1.5m lift by excavation. The lead to be measured from the centre of gravity of excavation to the centre of filling. The earth shall be rammed including breaking of clods, levelling and dressing. | cum 150.00 | — | 148 | 22,200 |
| 46 | Removal of Earth of all kinds of soils/rocks, boulders including mud/slush, slipped earth in catch water drains, side drains, over berms in cutting, water way of bridges, over coping of toe/ breast/ retaining walls etc. including crossing of nallah, railway tracks, making/repairing approach roads if required, all lead, lift, handling, re-handling, ascent, descents, or any other obstruction including all labour and material as a complete job. Earth spoils to be dumped outside the cutting or railway embankments as per direction of Engineer-in-charge. | cum 20.00 | — | 142 | 2,840 |
| 47 | Chase cutting and smoothening of inside surface of sizes 80 mm deep and 170 mm width for single/multiple cable chase in concrete or hard rocks or platform or cemented floor. Note: Sundries materials such as sand, cement, etc., shall be supplied by the contractor at site and to be inspected by Railway Site Engineer before placing in the chase. Note: In case, chase cutting & smoothening are other than prescribed depth & width, Proportionate payment shall be released. | Metre 50.00 | — | 146 | 7,300 |
| 48 | Design, Preparation & Checking of cable corrage plan in size U(A3) or latest as per SEM. Note- i) Contractor has to collect approved Signal Interlocking Plan (SIP)/ESP from the Rly. ii) After design, development & Preparation of above diagram & drawings, contractor has to submit initially two (02) sets of paper print for checking in the Rly office. Thereafter, contractor will collect one (01) set of checked copy for necessary correction/modification/alteration, if any. iii) Only minor corrections, if any will be incorporated in the original tracing paper will be done by the Railways. iv) If there are major corrections/mistakes found during checking on paper print by Railways, then the same one (01) set of the original prints tracing papers & two (02) sets of paper prints has to be re-submitted for checking & approval. v) After approval, contractor will collect approved copies and submit 3 sets paper print along with, original tracing paper. vi) After commissioning of the work, contractor shall prepare all the completion drawings in 2 sets and put up it to approval of Rlys. Within one month or as defined in the tender document and subsequently after their approval submit the original prints on tracing papers. vii) After approval on the original tracing all drawings in 3 sets except SIP in 06 nos. of hard copy/blueprint along with the original tracing complete in all respects and two sets of soft copies pendrive to be handed over to the railways. viii) In course of execution of the work, any future development, additions and alterations etc., also to be incorporated in the circuit diagram as well as soft copy by the contractor at the completion stage. ix) The drawings shall be minutely prepared by the contractor. Maximum permissible mistakes will be 5% of the total submitted sheets in those drawings. In case, it goes beyond 5%, penalty of Rs. 250 per sheet will be deducted. x) All the drawing should be provided on good quality plotter paper. | Station 1.00 | — | 2,495 | 2,495 |
| 49 | Design, Preparation & Checking of cable route plan / Track bonding Plan in size U(A3) or latest as per SEM. Note- i) Contractor has to collect approved Signal Interlocking Plan (SIP)/ESP from the Rly. ii) After design, development & Preparation of above diagram & drawings, contractor has to submit initially two (02) sets of paper print for checking in the Rly office. Thereafter, contractor will collect one (01) set of checked copy for necessary correction/ modification/ alteration, if any. iii) Only minor corrections, if any will be incorporated in the original tracing paper will be done by the R a i l w a y s . iv) If there are major corrections/mistakes found during checking on paper print by Railways, then the same one (01) set of the original prints tracing papers & two (02) sets of paper prints has to be re-submitted for checking & approval. v) After approval, contractor will collect approved copies and submit 3 sets paper print along with, original tracing paper. vi) After commissioning of the work, contractor shall prepare all the completion drawings in 2 sets and put up it to approval of Rlys. Within one month or as defined in the tender document and subsequently after their approval submit the original prints on tracing papers. vii) After approval on the original tracing all drawings in 3 sets except SIP in 06 nos. of hard copy/blueprint along with the original tracing complete in all respects and two sets of soft copies pendrive to be handed over to the railways. viii) In course of execution of the work, any future development, additions and alterations etc., also to be incorporated in the circuit diagram as well as soft copy by the contractor at the completion stage. ix) The drawings shall be minutely prepared by the contractor. Maximum permissible mistakes will be 5% of the total submitted sheets in those drawings. In case, it goes beyond 5%, penalty of Rs. 250 per sheet will be deducted. x) All the drawing should be provided on good quality plotter paper. | Station 1.00 | — | 1,248 | 1,248 |
| 50 | Fixing of 'P'/'G'/'C'/'A'/'AG'/'IB'/Marker/Arrow marker/ Signal Number plates with complete fittings as per site requirement. | Numbers 7.00 | — | 196 | 1,372 |
| 51 | Dismantling of Concrete foundation/ Demolishing RCC/CC/Stone work/Cutting Tar carpeting/CC Flooring/ Precast concrete slab/ Brick work including leading the debris inside Railway limit or outside Railway limit as directed by site in charge. This work to be done by contactors with his own vehicle and labour. | cum 10.00 | — | 584 | 5,840 |
| 52 | Shifting of Exposed cables. The item includes Removal of exposed cable from existing trench & laying the same in new trenches. Digging, placing of capping/Half round RCC pipe covered separately. | Kilometre 1.00 | — | 6,862 | 6,862 |
| 53 | Hiring of JCB/Hydra/Poclain machine in good working condition for earth cutting, levelling, dressing etc., of round/dismantling structures including disposal of debris through dumpers/Shifting the location box or signal post with foundation etc. with contractor's labour including machine operator, fuel etc. Payment shall be made for actual working hours at site & proportionate payment to be made in case less than hours. Note: Vehicle shall not be more than 3 years old. | Hour 4.00 | — | 995 | 3,980 |
| 54 | Transportation and fixing of LED based 2way Stencil type route indicator/Multi lamp route indicator (LED Single/Double digit) on the erected signal post including termination of cables, painting lettering as required. | Numbers 10.00 | — | 3,462 | 34,620 |
| 55 | Dismantling of location box/RCC Goomty including all its accessories & concrete foundation. | Numbers 10.00 | — | 651 | 6,510 |
| Schedule total | ₹69,00,130 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Annexure-1and2.pdf
ATTACHMENT
Annexure-L.pdf
ATTACHMENT
Annexure-MandN.pdf
ATTACHMENT
Anneure-V.pdf
ATTACHMENT
Annexure-VA.pdf
ATTACHMENT
AnnexureVIA.pdf
ATTACHMENT
Annexure-VI-B.pdf
ATTACHMENT
Annexure-Z.pdf
ATTACHMENT
TENDERFORMFirstSheet.pdf
ATTACHMENT
Gcc 2022
ATTACHMENT
GCCAdvanceCorrectionSlipNo.11..pdf Gcc Advance Correction Slip
ATTACHMENT
Annexure-A.pdf
ATTACHMENT
SpecialConditionsofContract.pdf
ATTACHMENT
ColouredFinal_GCC_April-22_pdf_27.04.22.pdf
ATTACHMENT
GCCAdvanceCorrectionSlipNo.11..pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .