Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹16.9 L
EMD Value
₹33,780
Closing Date
24 Oct 2026, 3:00 pm5d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
EXECUTIVE ENGINEER
SARYU NAHAR KHAND KHALILABAD
Protection work of constructed VRB at km 67.860 of Khalilabad branch in District sant kabir nagar
2026_UPIDC_1197993_8
05/EE/2026-27
Open Tender
Civil Works - Canal
Item Rate
60 days
SANT KABIR NAGAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹854
₹33,780
19 Oct 2026
19 Oct 2026
24 Oct 2026
19 Oct 2026
24 Oct 2026
19 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation in foundation in all type of soil including all lead & lift and it's proper disposal as per direction of Enginner -In - Charge etc. required for proper completion of the work . | 187.29 | M3 | - | - |
| 2 | Centering and shuttering work for Plain Cement Concrete in foundation / C.C. work including cost of all materials, labour and T&P etc. required for proper completion of the work. | 199.69 | M2 | - | - |
| 3 | Laying P.C.C. 1:3:6 in foundation / levelling course with 20 mm to 40 mm size Dala crushed stone grit and Chopan coarse sand having F.M. not less than 2.0 including cost of all material, labour proper compaction with required tools and T&P etc. required for proper completion of the work. | 18.06 | M3 | - | - |
| 4 | Laying C.C. 1:2:4 with 4.75 mm to 20 mm size Dala crushed stone grit and Chopan coarse sand having F.M. not less than 2.0 including cost of all material, labour,proper compaction with required tools and T&P etc. required for proper completion of the work. | 100.19 | M3 | - | - |
| 5 | Making subgrade for lining work including watering, proper compaction required as per site situation and prepration of workable surface, labour and T&P etc. required for proper completion of the work. | 392.51 | M2 | - | - |
| 6 | Supplying & laying of local sand in bed & side slope of canal including cost of all material, proper compaction, labour and T&P etc. required for proper completion of the work. | 62.36 | M3 | - | - |
| 7 | Supply and Laying LDPE film 200 micron thick (1st grade) including cost of all material, contractor profit, labour and T&P etc. required for proper completion of the work. | 392.51 | M2 | - | - |
| 8 | Supplying & pitching of Mirzapur quarry stone boulder 40 to 60 kg in two layer with proper manner , each layer must be 225 mm thick at site of work / as per direction of Engineer -In- Charge including cost of boulder, carriage up to site , loading, unloading, stacking , labour ,T&P etc complete in all respect. | 49.5 | M3 | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.45 MB
BOOKLET05.pdf
Tender Documents • 7.03 MB
BOQ_2263669.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .