Tender Value
₹10.0 L
EMD Value
₹10,000
Closing Date
28 Sept 2026, 6:00 pmDue tomorrow
Assistant Manager (North West Zone)
Providing Supplying & Laying Wetmix at Drainage line & Water line Exacavation Area And Labour work of laying Hotmix Material Patch work at TP 1 Area And Other Area in Ghatlodia ward North West Zone (ARC)
346551
06/2025-26 T No 46
Open
Civil Works
Works
Ahmedabad
3 documents required · 3 mandatory
₹900
Municipal Commissioner, Ahmedabad
₹10,000
19 Sept 2026
19 Sept 2026
19 Sept 2026
28 Sept 2026
19 Sept 2026
Name of Work :- Providing , Supplying & Laying Wetmix at Drainage line & Water line
Exacavation Area And Labour work of laying Hotmix Material Patch work at TP-1 Area And
Other Area in Ghatlodia ward North West Zone. (A.R.C.)
Sr. Quantity Item Description Rate in Rs. Per Amount in
Extra rate over item of excavation of earth for
excavation of asphalt pavement of thickness up to
0.20 meter including demolishing the asphalt
1 carpet,metal,soiling etc.comp. with stacking the
material as directed. AMC SOR Year 2016 (As On
a 30.00 a) up to 0.20 meter thickness (By Manual) 80.00 smt
b)Up to 0.30 meter (By Breaker Machine including cost
b 50.00 of operator, fuel, & transportation etc complete. 200.00 smt
c) 0.30 meter & above (By Breaker Machine including
c 10.00 cost of operator, fuel, 350.00 smt
& transportation etc complete.
Barricading the entire break down or excavated area
on rental basis using wooden ballies / M.S.angles at
max. 2.00 meter centre to centre, C.G.I. Sheet,
reflective paint / Board out side to avoid accident & for
smooth traffic diversion & movement including
cautionary board etc. Item also includes for making
2 50.00 temporary sufficient nos of lighting arrangement 90.00 Rmt
through out the work with necessary required
arrangement. ..The same shall be removed after
completion of work. (Only for break down work
from start to complete) (Based on Drainage SOR
Box cutting the road surface to proper slope and
camber for making a base for road work including
removing the excavated stuff and depositing on the
3 400.00 road side slope as directed upto 50Mt.lead. 67.94 Cu.M
(EXECUTED WITH MECHANISED EFFORTS /
MACHINARY) SOR -(Jan- 2021/22 AMC)
Conveyance charge of earth, lime, murrum,
buildingrubbish, manure, garbage, sludge, excavated
rock, fly ash,aggregates of any kind Including
4 spreading & levelling etc. complete.
Sta.5 5 SOR -(Jan- 2021/22 AMC)
a 10.00 a) Lead up to 3 Km. 42.97 CMT
b 10.00 b) Lead up to 4 Km. 50.98 CMT
c 10.00 c)Lead up to 5 Km. 58.71 CMT
d 10.00 d)Lead up to 10 Km. 87.96 CMT
e 500.00 e)Lead up to 15 Km. 117.21 CMT
Rolling of earthwork in layers with power roller
5 200.00 including filling in depressions which occur during the 12.50 Cmt
process. SOR ‐(Jan‐ 2021/22 AMC)
Watering of earth work as directed. SOR ‐(Jan‐
2021/22 AMC) SOR ‐(Jan‐ 2021/22 AMC)
Construction of granular Sub base by providing coarse
graded material , spreading in uniform layers with
motor grader on prepared surface mixing by mix in
7 place method with front end loader at OMC and 738.00 Cmt
compacting with vibratory roller to achieve the desired
density, complete as per Clause 401. For all grade
SOR ‐(Jan‐ 2021/22 AMC)
a 100.00 (A) Production & Supply of GSB (Natural) 704.00 Cmt
b 100.00 (B) Laying of GSB (Natural) 34.00 Cmt
Construction of granular Sub base using crusher run,
spreading in uniform layers with motor grader on
prepared surface mixing by mix in place method with
8 front end loader at OMC and compacting with vibratory 1467.00 Cmt
roller to achieve the desired density, complete as per
Clause 401. For all grade SOR ‐(Jan‐ 2021/22 AMC)
Production & Supply of GSB (Crusher Run)
10.00 Laying of GSB (Crusher Run) 30.00 Cmt
Providing, laying, spreading and compacting graded
stone aggregate to wet mix macadam specification
including premixing the Material with water at OMC in
mechanical mix plant carriage of mixed Material by
9 tipper to site, laying in uniform layers in sub‐ base / 1710.00 Cmt
base course on well prepared surface and compacting
with vibratory roller to achieve the desired density as
per Codal Provision. SOR ‐(Jan‐ 2021/22 AMC)
A 300.00 Production & Supply of WMM 1975.00 Cmt
B 300.00 Laying of WMM 35.00 Cmt
Providing and applying primer coat with cationic
bitumen emulsion SS1 grade conforming to ASTM
GRADE on prepared surface of wet mix macadam
including clearing of Wet mix macadam surface with air
compressor to remove all loose material other foreign
material. The primer shall be sprayed uniformly at the
10 1400.00 rate of 0.70‐1.0 kg/sqm. It shall be applied by a
self‐propelled or towed bitumen pressure sprayer,
equipped for spraying the material uniformly at a
specified rate. No dilution or heating at site of RS1
bitumen emulsion shall be permitted. SOR ‐(Jan‐
Labour charges for hand laying hotmix material
DBM/BC on the road surface in line & level incl.
cleaning the surface with air compressor and if require
re carting material by JCB at necessory place of work
also rolling with 8 ‐ 10 tonnes vibratory roller and Dust
11 144.00 spreading on BC after rolling, rate also includes 511.00 MT
re‐carting of Hotmix material from place of Work / AMC
store to Location of laying having narrow width like
chawls, poles, gamtal roads etc.
complete SOR ‐(Jan‐ 2021/22 AMC)
Hiring of Tractor with trolley considering 8 Hrs. As
working Day hours inclu. Driver (GWSSB SOR‐2022‐
23 Section‐2E‐ Miscellenous Item No.7) SOR ‐(Jan‐
BASIC RATES OF LABOUR
13 (R&B Building SOR Year 2024‐25)
A 40.00 (A) Labour charges ‐ Excavator (Item Code No.L012) 566 NO
(B) Labour charges ‐ Mazdoor (Female) (Item Code
(C) Labour charges ‐ Mazdoor (Male) (Item Code
Providing & Supplying JCB Machine on rental basis in
case of emergency situation and break down type work
& also during unavoidable condition as per instruction
of engg.incharge , rate includes all nece. shifting,
fuel and operating charges and stacking of useful &
non-useful materials separately up to store. (No
14 18.00 payment should be allowed for non working 600.00 hr
condition of machinery and for pipe line excavation
and laying work) ( Based on Previously approved
rate by C E sir ) SOR ‐(Jan‐‐ 2021/22 AMC)
Bitumen Cutting Labour charge of cutting in
bituminous pavement. Cutting to be done with
heavy duty tandom cutting machine consist of
diamond blade. Minimum cutting depth shall be 75 mm
from the finished level. Cutting shall be perfeclty in line.
The width and depth of the removal of asphalt towards
kerb stone shall be as per the drawing. Bitumen
shall be carefully removed so that the the cutting
15 20.00 edge towards the road should not be disturbed. The 113.39 Rmt
work of removal of the asphalt will be considered
in this item as running meter of the cutting done by
machine. One cutting line will be considered per length
of the kerb stone. Bitumen and other debris shall be
disposed within 10.0 km. as per the instruction of the
engineer in charge. Surroundings shall be cleaned to
the satisfaction of the engineer in charge. SOR ‐(Jan‐
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
T.No.46 TP-1 Abstract Wetmix Tender.pdf
T.No-46 TP-1 Wetmix Tender.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .