| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 CrAccepted-AOC | ₹1.9 Cr | L1 | Accepted-AOC Lowest bidder |
| 2 | L2₹2.4 Cr+₹51.6 L (27.2%)Rejected-Finance | ₹2.4 Cr+₹51.6 L (27.2%) | L2 | Rejected-Finance Second lowest bidder |
Tender Value
₹1.9 Cr
EMD Value
₹50,000
Closing Date
20 Jan 2020, 5:00 pmClosed
Chief Engineer Renewable Energy and Energy Savings
Chief Engineer Renewable Energy and Energy Savings KSEBL Vydyuthi Bhavanam Pattom
Appointment of EPC Contractor for the design as per site conditions erection testing and commissioning of Grid Tied Rooftop SPV Power plants, on the Roof of buildings owned by LSGD Malabar of capacity 385kWp in 21 locations
2019_KSEB_329460_1
KSEBL_REES_LSGDMLBR_10_2019_20
Open Tender
Solar Power Plants
Turn-key
180 days
Various locations in Kannur and 1location in KKDo
Appointment of EPC Contractor for the design as per site conditions erection testing and commissioning of Grid Tied Rooftop SPV Power plants, on the Roof of buildings owned by LSGD Malabar of capacity 385kWp in 21 locations
9 documents required · 9 mandatory
₹5,900
online
₹50,000
Yes
Trivandrum
14 Aug 2020
12 Dec 2019
23 Jan 2020
13 Dec 2019
20 Jan 2020
26 Dec 2019
13 Dec 2019 - 20 Dec 2019
21 Dec 2019
Total prrice for the design, planning, investigation, survey, engineering, manufacture/procurement, manufacturer’s quality assurance, shop testing (including type testing where specified/required), transportation, handling storage, erection including all civil/structural works, electrical and general works, piping, cabling, instrumentation, installation, testing and commissioning, training, services, permits and insurance at all stages, and all related works for connectivity, Statuatory Inspection & Testing, Additional work/Cabling for Power Evacuation and works related with Single Phase to Three Phase Conversion and installation of Power evacuation transformers if required, in necessary locations and executing everything necessary to complete the project in all respects for the Grid-tied 325 kWp (in total from 19 locations) solar photovoltaic system on the rooftop of buildings under LSGD-Malabar Viz Kannur District Panchayath and handing over the SPV Plants to LSGD-Malabar Viz Kannur District Panchayath to its full satisfaction after proving the performance ratio(AC) as detailed in clause 2.2.3 of volume 1 of the tender document.
Description of Work / Item(s)
Total prrice for the design, planning, investigation, survey, engineering, manufacture/procurement, manufacturer’s quality assurance, shop testing (including type testing where specified/required), transportation, handling storage, erection including all civil/structural works, electrical and general works, piping, cabling, instrumentation, installation, testing and commissioning, training, services, permits and insurance at all stages, and all related works for connectivity, Statuatory Inspection & Testing, Additional work/Cabling for Power Evacuation and works related with Single Phase to Three Phase Conversion and installation of Power evacuation transformers if required, in necessary locations and executing everything necessary to complete the project in all respects for the Grid-tied 50 kWp (in total from 1 location) solar photovoltaic system on the rooftop of buildings under LSGD-Malabar Viz Perambra Block Panchayath and handing over the SPV Plants to LSGD-Malabar Viz Perambra Block Panchayath to its full satisfaction after proving the performance ratio(AC) as detailed in clause 2.2.3 of volume 1 of the tender document.
Description of Work / Item(s)
Total prrice for the design, planning, investigation, survey, engineering, manufacture/procurement, manufacturer’s quality assurance, shop testing (including type testing where specified/required), transportation, handling storage, erection including all civil/structural works, electrical and general works, piping, cabling, instrumentation, installation, testing and commissioning, training, services, permits and insurance at all stages, and all related works for connectivity, Statuatory Inspection & Testing, Additional work/Cabling for Power Evacuation and works related with Single Phase to Three Phase Conversion and installation of Power evacuation transformers if required, in necessary locations and executing everything necessary to complete the project in all respects for the Grid-tied 10 kWp (in total from 1 location) solar photovoltaic system on the rooftop of buildings under LSGD-Malabar Viz Chengalayi Grama Panchayath and handing over the SPV Plants to LSGD-Malabar Viz Chengalayi Grama Panchayath to its full satisfaction after proving the performance ratio(AC) as detailed in clause 2.2.3 of volume 1 of the tender document.
Description of Work / Item(s)
O & M Charges for first year for the Grid-tied 325 kWp (in total from 19 locations) solar photovoltaic system on the rooftop of buildings under LSGD-Malabar Viz Kannur District Panchayath.
O & M Charges for second year for the Grid-tied 325 kWp (in total from 19 locations) solar photovoltaic system on the rooftop of buildings under LSGD-Malabar Viz Kannur District Panchayath..
O & M Charges for third year for the Grid-tied 325 kWp (in total from 19 locations) solar photovoltaic system on the rooftop of buildings under LSGD-Malabar Viz Kannur District Panchayath..
O & M Charges for fourth year for the Grid-tied 325 kWp (in total from 19 locations) solar photovoltaic system on the rooftop of buildings under LSGD-Malabar Viz Kannur District Panchayath..
O & M Charges for fifth year for the Grid-tied 325 kWp (in total from 19 locations) solar photovoltaic system on the rooftop of buildings under LSGD-Malabar Viz Kannur District Panchayath..
Description of Work / Item(s)
O & M Charges for first year for the Grid-tied 50 kWp (in total from 1 location) solar photovoltaic system on the rooftop of buildings under LSGD-Malabar Viz Perambra Block Panchayath.
O & M Charges for second yearfor the Grid-tied 50 kWp (in total from 1 location) solar photovoltaic system on the rooftop of buildings under LSGD-Malabar Viz Perambra Block Panchayath.
O & M Charges for third year for the Grid-tied 50 kWp (in total from 1 location) solar photovoltaic system on the rooftop of buildings under LSGD-Malabar Viz Perambra Block Panchayath.
O & M Charges for fourth year for the Grid-tied 50 kWp (in total from 1 location) solar photovoltaic system on the rooftop of buildings under LSGD-Malabar Viz Perambra Block Panchayath.
O & M Charges for fifth year for the Grid-tied 50 kWp (in total from 1 location) solar photovoltaic system on the rooftop of buildings under LSGD-Malabar Viz Perambra Block Panchayath.
Description of Work / Item(s)
O & M Charges for first year for the Grid-tied 10 kWp (in total from 1 location) solar photovoltaic system on the rooftop of buildings under LSGD-Malabar Viz Chengalayi Grama Panchayath.
O & M Charges for second year for the Grid-tied 10 kWp (in total from 1 location) solar photovoltaic system on the rooftop of buildings under LSGD-Malabar Viz Chengalayi Grama Panchayath.
O & M Charges for third year for the Grid-tied 10 kWp (in total from 1 location) solar photovoltaic system on the rooftop of buildings under LSGD-Malabar Viz Chengalayi Grama Panchayath.
O & M Charges for fourth yearfor the Grid-tied 10 kWp (in total from 1 location) solar photovoltaic system on the rooftop of buildings under LSGD-Malabar Viz Chengalayi Grama Panchayath.
O & M Charges for fifth year for the Grid-tied 10 kWp (in total from 1 location) solar photovoltaic system on the rooftop of buildings under LSGD-Malabar Viz Chengalayi Grama Panchayath.
Description of Work / Item(s)
Total prrice for the design, planning, investigation, survey, engineering, manufacture/procurement, manufacturer’s quality assurance, shop testing (including type testing where specified/required), transportation, handling storage, erection including all civil/structural works, electrical and general works, piping, cabling, instrumentation, installation, testing and commissioning, training, services, permits and insurance at all stages, and all related works for connectivity, Statuatory Inspection & Testing, Additional work/Cabling for Power Evacuation and works related with Single Phase to Three Phase Conversion and installation of Power evacuation transformers if required, in necessary locations and executing everything necessary to complete the project in all respects for the Grid-tied 385 kWp (in total from 21 locations) solar photovoltaic system on the rooftop of buildings under LSGD-Malabar Viz Kannur District Panchayath,Perambra Block Panchayath and Chengalayi Grama Panchayath and handing over the SPV Plants to LSGD-Malabar Viz Kannur District Panchayath to its full satisfaction after proving the performance ratio(AC) as detailed in clause 2.2.3 of volume 1 of the tender document.
Total price for Operation and Maintenance (O & M) charges of the Solar Photovoltaic Power Plant for a period of 5 year including arrangement of cost of replacement of all the defective parts, consumables, tools, tackles, testing equipments & instruments, manpower, all administrative work, maintenance of records and submissions to all concerned authorities for the Grid-tied 385 kWp (in total from 21 locations) solar photovoltaic system on the rooftop of buildings under LSGD-Malabar Viz Kannur District Panchayath,Perambra Block Panchayath and Chengalayi Grama Panchayath including all taxes as per GST, covered under Guarantee period for a period of 5 years from the date of handing over.
SOLGEN ENERGY PVT LTD
SOLGEN ENERGY PVT LTD
SOLGEN ENERGY PVT LTD
SOLGEN ENERGY PVT LTD
SOLGEN ENERGY PVT LTD
SOLGEN ENERGY PVT LTD
SOLGEN ENERGY PVT LTD
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .