Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.2 LAccepted-AOC | L1 | Accepted-AOC L1 Bidder | |
| 2 | L2₹8.6 L+₹40,157.90 (4.90%)Rejected-AOC | L2 | Rejected-AOC L2 bidder |
| Sl No | Description | Qty | Unit | JESEENA BEEVI L1 | KRISHNAKUMAR B L2 |
|---|---|---|---|---|---|
| 1.00KBC, Maravoor & Maravoor Minor Distributories | |||||
| 1.00 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 11,210 | sqm | 15 ₹1,68,150 Lowest | 17 ₹1,90,570 |
| 1.00 | 2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | 16,360 | sqm | 8.11 ₹1,32,679.6 Lowest | 8.4 ₹1,37,424 |
| 1.00 | 2.33.1:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 30 cm girth up to and including 60 cm girth | 5 | each | 481 ₹2,405 Lowest | 507 ₹2,535 |
| 1.00 | 2.33.2:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 60 cm girth up to and including 120 cm girth | 4 | each | 2,147 ₹8,588 Lowest | 2,265 ₹9,060 |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 89.15 | cum | 224 ₹19,969.6 Lowest | 234 ₹20,861.1 |
| 2.00Removal of floating bodies | |||||
| 2.00 | OD13686/2025-2026:Engaging man coolies for removal of floating materials from canal where ever necessary during
water distribution and removal of silt and slipped earth at salient points for smooth flow in the
canal as directed by the departmental officers at site. | 500 | no | 974 ₹4,87,000 Lowest | 997 ₹4,98,500 |
Tender Value
₹9.3 L
EMD Value
₹23,305
Closing Date
16 Oct 2025, 4:00 pmClosed
Assistant Executive Engineer
Assistant Executive Engineer KIP LB Subdivision No 13 Kollam
Annual Maintenance 2025 26 Clearing Jungle of KIP LB KBC Ch 0 to 4000 Maravoor and Maravoor Minor removal of floating bodies from KIP LB Main Canal and clearing the face of trash rack KBC Maravoor etc
2025_Irrig_807048_1
IRR/PII/TR/2458/2025_5_2_1/1
Open Tender
Civil Works - Canal
Item Rate
330 days
Poreekkal
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,055
₹23,305
5 Nov 2025
8 Oct 2025
17 Oct 2025
8 Oct 2025
16 Oct 2025
8 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1344892.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .