| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹46.6 LAccepted-AOC | L1 | Accepted-AOC ACCEPTED | |
| 2 | Rejected-Technical | - | Rejected-Technical S.No. 6,7,10,12 A B C D, 13 |
Tender Value
₹56.7 L
EMD Value
₹56,700
Closing Date
19 Jan 2023, 3:00 pmClosed
EXECUTIVE OFFICER
TOWN PANCHAYAT OFFICE ILLUPPUR PUDUKKOTTAI DISTRICT
STRENGTHENING OF BT ROAD AT MATHIRAMPATTI IN ILLUPPUR TOWN PANCHAYAT, PUDUKKOTTAI DISTRICT
2023_DTP_278376_1
62/2022
Open Tender
Civil Works - Roads
Works
180 days
ILLUPPUR TOWN PANCHAYAT
I CLASS
3 documents required · 3 mandatory
₹0
₹56,700
ILLUPPUR TOWN PANCHAYAT
7 Jun 2024
3 Jan 2023
19 Jan 2023
4 Jan 2023
19 Jan 2023
10 Jan 2023
10 Jan 2023
Amount
Picking the existing surface 3 to 5 cm deep removal of picked up staff to the side berms and using the useful metal to the road hand packing to camber sectioning levelling etc.,complete as per including labour charges for picking and other tools and plants etc., complete as per standard specifications. 404 of MORTH
Providing and laying, spreading and compacting graded stone aggregates to Wet Mix Macadam specification including premixing the materials with waterat OMC in mechnanical mix plant carriage of mixed material by tipper to site laying inuniform layers with paver sin Sub Base/Base course on well prepared surface and compacting with vibratory roller to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5
Providing and laying Prime Coat over WMM surface using 7Kg of Emulsion Bitumen (SS1) per 10sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 502 of MORTH Rev-5
Providing and laying Tack Coat over WMM surface (treated with primer) using 2.50Kg of Bitumen Emulsion (RS1) per 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5
Providing and laying 50mm Consolidated thick Dense Bituminous Mecadam using 0.24 cum of 26.50 – 13.20 mm Graded metal and 0.25 cum of 13.20 – 2.36 mm Grade metal and 0.23 cum of 2.36 mm & below with 53.20 kgs of 60/70 Grade Bulk bitumen for premixing per 10 Sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20 – 30 ton capacity, Conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50 mm with mechanical pavers to the specified grades and cross sections and compaction by Vibratory/Pneumatic rollers to the required density etc., including labour for loading bitumen into bitumen tank and Metal to feeder unit, labour for attending to paver site etc., including hire charges and fuel charges for 20 – 30 ton CMP With bitumen boiler tipper,trucks, paver Finisher/9M, Vibrator rollers and all other tools and plants required,including all other incidental charges etc., complete as per standard specification using CMP Clause 505 of MORTH Rev-5
Providing and laying Bituminous Concrete to 30mm thick using 0.13cum of 19.00-9.50mm, 0.17cum of 9.50-2.36mm and 0.26cum of 2.36 and below with 46.28 kgs of VG30( 60/70) bitumen with Shredded plastic waste 4.02kg for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30t on capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory/Pneumatic Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher/9mpaver finisher, Vibratory/Pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Supplying and Spreading of well Gravel from approved quarry in Layer of not more than 15cm thick including watering with all layers and consolidation complying with standard specification including cost and conveyance of sand at site and all labour charges and all other incidential charges etc., complete as per Standard Specification.
Providing and laying of hot applied thermoplastic compound f2.5mm thick including refllectorising glass beads @ 250grms per sqm area thickness of 2.5mm is exclusive of surface applied glass beads as per IRC:35 the Finished surface to be level, uniform and free from steaks and holes etc., complete as per MORT & H Specification NO.803
Earthwork excavation for foundation in all soils with initial lead of 10m and lift of 2m bailing water wherever necessary and refilling the sides of foundation with excavated earth etc. complete as per standard specification
Cement Concrete of mix 1 : 4 : 8 (One Cement four sand eight aggregates) using 40mm gauge hard broken including cost conveyance of all materials to site including formwork and centering labour charges, transporting and placing in position including shoring, strutting, forming protective bunds, cofferdams bailing out of water labour for mixing compacting, finishing and curing, working at depths, tools and plants and incidental charges such as sheeting, shoring and bracing and their subsequent removal etc., complete as per standard specification.
Centering for PCC work including cost of material all labour charges etc. compeleted as per standard speifications
Cement Concrete 1: 2 : 4 mix (One part cement, Two part of sand and Four part of agrrigate) using 20mm size HBG metal from approved quary including cost and convayance of all material to site loading and unloading charges and labour charges mixing. Laying and curing etc. complete. Complying with standard specifications.
Centering for sides and sofilts for RCC slabs and beams lintels and other flat surfaces below 3m height including strutting arrangements as per standard specification and removing the same after the specified period and including cost of all chargescomplete as per standard specification. (Deck Slab)
Supplying fabrication and placing in position of mild steel or ribbed for steel for all RCC works including cost of steel, binding wire and labour charges for cutting, bending etc. complete as per standard specification.
Reinforced Cement concrete 1:11/2:3 (one cement, One one and half sand, three aggregate) using machine crushed 20mm size ISS guage HBG metal for foundation including cost of all materials to site and all labour charges for mixing, laying, ramming, curing, concrete etc. co
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .