Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹43.9 LAccepted-Finance NO 12 HARIKRISHNAPURAM SAWYERPURAM TUTICORIN THOOTHUKUDI TAMIL NADU 628251 | TUTICORIN | TAMIL NADU | 628251 | ₹43.9 L | L1 | Accepted-Finance bid fulfills all tender criteria. |
| 2 | L2₹56.5 L+₹12.5 L (28.5%)Accepted-Finance | ₹56.5 L+₹12.5 L (28.5%) | L2 | Accepted-Finance bid fulfills all tender criteria |
| 3 | L3₹1.3 Cr+₹81.7 L (186.1%)Accepted-Finance | ₹1.3 Cr+₹81.7 L (186.1%) | L3 | Accepted-Finance bid fulfills all tender criteria |
| 4 | Rejected-Technical | - | - | Rejected-Technical Failed to submit required tender docs even after repeated requests. |
Tender Value
Refer Docs
Closing Date
2 Apr 2024, 2:00 pmClosed
S R UNNIGOPAN
CSL COCHIN, P O PERUMANOOR
ELECTRICAL PACKAGE JOB FOR THE VESSEL ICGS SAMUDRA PAHEREDAR AT CKSRU, KOLKATA
2024_CSL_191474_1
KP1/Electrical Package 1/ ICGS Samudra Paheredar
Open Tender
Repair and Maintenance Services
Turn-key
90 days
CKSRU KOLKATA
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
Exempted
11 Oct 2024
16 Mar 2024
3 Apr 2024
16 Mar 2024
2 Apr 2024
16 Mar 2024
16 Mar 2024 - 1 Apr 2024
Electrical Repair Package Jobs
Lub oil priming pump motors of all four main Das to be overhauled. (Material contractor supply).
SHAFT GENERATOR (2300 KW, 415V, 3- PHASE) – 02 NOS, M/S AVKDEUTSCHAND,
Overhaul both (Port &Stbd) Shaft Generator as follows:- (a) Examination of power cables, cable entry, cable shoes and CT on terminal box. (b) Cleaning &examination of insulators for cracks. (c) Check and re-tightening of all screws and nuts in aux. terminal box. (d) Check and re-tightening of all screws and nuts in aux. terminal box by dynamometric key. (e) Inspection of stator and rotor winding with endoscope. On completion of overhauling Laser alignment of Shaft Generators to be carried out with main shaft of Prime mover. (All in way jobs/materials and spares under contractor scope)
EMERGENCY SWITCH BOARD (M/S RRMI)
Circuit breakers {(Make-Merlin Gerlin, 400 Amps} to be overhauled and safety trip checks (over current, short circuit & under voltage) to be carried out. (a) Record the bus bar insulation. Insulation should be >5 mega ohm. (b) Rubber beading of the panel doors to be renewed. (Mat contractor supply) Calibration certificate to be provided.
Following meters to be calibrated and Calibration certificate to be provided.
Ammeter (0 – 1000 Amp)
Voltmeter (0 – 600 V)
Frequency meter (45 – 55 HZ)
Calibrate all meters in both MSB. Calibration Certificate to be provided.
METER DESCRIPTION RANGE MSB(P) QTY MSB(S) QTY
Voltmeter (0 – 300 V) 01 01
Voltmeter (0 – 600 V) 04 05
Insulation meter 0 - ∞MὨ 03 03
Ammeter (0 – 5000 A) 03 03
Ammeter (0 – 3000 A) 07 06
KW tmeter (-150 to 500 KW) 03 04
KW tmeter (-2875 to +2875 KW) 01 02
Frequency tmeter (44 - 55 Hz) 04 05
Synchroscope …. 03 04
PF meter (-0.5 to 1 to+0.5) 03 04
TRANSFORMERS (99KVA-02 NO, 40KVA- 01NO.) 415/230V, 3-PHASE, M/S MARINE ELECTRICAL
Overhaul the transformers (99 KVA -02 Nos windings to be applied with air drying varnish. Post overhauling, transformers are to be proved for satisfactory operation.
Overhaul the transformers (40 KVA – 01 No), windings to be applied with air drying varnish. Post overhauling, transformers are to be proved for satisfactory operation.
SHORE CONNECTION BOX (415V, 3-PHASE, 800A)- 02 No., M/S MARINE ELECTRICALS
Overhauling of 02 no shore connection box and 01 no shore bus bar panel to be carried out. Job includes following; a) Undertake CIT of MCCB-800A b) Renew insulator bushings of bus bar.
Calibration of following meters to be carried out and Calibration Certificate to be provided.
Voltmeter (0-500V)
Ammeter (0-1000A)
KWH meter
Phase sequence meter
INTERRING STABILIZER –02 NO, M/S RRMI (INPUT 230 V,AC)
Following tests to be carried out as per manual :- (a) 04 different tests for check of the stabilizer logic. (b) Arbitrary periods of roll (10, 15, 20 and 30 sec) to be checked for pneumatic valve and stabilizer valves. (c) RS Test for check of Roll sensor to be carried out.
INCINERATOR, M/S TEAMTEC, QTY-01 NO
Incinerator non-operational view suspected defective PLC and system not getting switched-on. Incinerator to be overhauled. Defect to be rectified and system to be proved with correct operation of following alarms. List of alarms: - (a) Flue gas temp. High. (b) Combustion chamber temp. high & low (c) Diesel oil temp high &low (d) Door not closed (e) Motor overload (f) Low and high voltage (g) Low sludge pressure (h) Sludge tank temp. high (j) Low level sludge tank (k) Diesel oil press. Low
ELECTRIC SIREN M/S ZETFONE
Overhauling of electric siren motor (415 V AC, 3-Phase, 50 HZ, 5.5 KW) and control panel to be carried out. System to be proved for satisfactory operation. (Mat & Spares contractor supply)
AIR WHISTLE – 01 NO. M/S KOCKUM SONIC
Overhauling of air whistle and control panel to be carried out. System to be proved for satisfactory operation. (Mat & Spares contractor supply)
FI-FI control panel to be overhauled. Overhauling includes calibration of OLR (3RV 1011-1 DA10, 2.2 A to 3.2 A, Qty-02 Nos and functional checks of Fi-Fi system in remote and fixed operator panel. Calibration certificate to be provided. (All items contractor supply).
REMOTE OPERATED SOLENOID VALVE & RELAY PANEL (M/S ROTEX)
Pneumatic remote operated solenoid valve relay panel to be overhauled. The overhaul includes checking relays & solenoids with pneumatic valves. Calibration of OLR (0.4-0.63A, TR2M,) to be carried out. Calibration certificate to be provided.
Overhauling of control panel
Checking of relays & solenoids with pneumatic valves
Calibration of OLR (0.4-0.63A, TR2M)
Overhauling of following ventilation fan motors alongwith blowers to be carried out as per instruction mentioned in technical requirement.
Name of Motor Specification Location
Supply Fan S-2A 415 V, 11 KW MER (P)
Supply Fan S-2B 415 V, 11 KW MER (S)
Supply Fan S-3A 415 V, 30 KW AER (P)
Supply Fan S-3B 415 V, 30 KW AER (S)
Overhauling of following ventilation fan starter panels to be carried out as per instruction mentioned in technical requirement. Calibration of over load Relay to be carried out. Calibration certificate to be provided. (All items contractor supply)
Name of Motor Specification Location OLR Details
Supply Fan S-2A 415 V, 11 KW MER (P) LRD 22 (16-24A)
Supply Fan S-2B 415 V, 11 KW MER (S) LRD 22 (16-24A)
Supply Fan S-3A 415 V, 30 KW AER (P) LR2D33 (48-65A)
Supply Fan S-3B 415 V, 30 KW AER (S) LR2D33 (48-65A)
Following exhaust ventilation fans are defective. Same to be renewed as per sample. In way job includes removal & refitment of paneling and trunking. (Spares and material contractor Supply)
FM -200 Room (415V 0.37 KW)
Galley (415 V 1.0 KW)
12 Sailor washroom (415V 0.37 KW)
Overhauling of following motors to be carried out as per instruction mentioned in technical requirement. (Spares contractor Supply)
Name of Motor Specification Make
FW LT circulating pump Motor for DA & 415V,3-Phase, 50 Hz, 15 KW M/s Brook Crompton ME ( LT-1,2,3 & 4)
FW LT circulating pump motor (Back up) 415V,3-Phase, 50 Hz, 22 KW M/s MEZ
ME & DA SW cooling Pump Motor 415V,3-Phase, 50 Hz, 15 KW M/s Brook Crompton
Following Starter Panels (M/s Marine Electricals) to be overhauled as per instruction mentioned in technical requirement. Overload relays (16-24 Amp) to be calibrated and Calibration certificate to be provided.
Name of Control Panel
FW LT Circulating pump Motor (Back up)
FW LT circulating pump Motor for DA & ME (LT-1,2,3 & 4)
ME & DA SW cooling Pump Motor
Overload relays (16-24 Amp)
GALLEY OVEN-02 NO. M/S DENKI
Overhauling of electric ovens to be carried out. Overhauling includes the following:- (a) Examine contactors for carbon deposition and pitting. (b) Check Insulation of control transformer, power supply wiring. (c) Renew all heat proof cables of oven terminal to hotplate terminal posts along with porcelain sleeves from terminal post to hot plate terminal. (d) Check and prove function of thermostat. (Mat &Spares contractor supply)
HOT PLATE (GALLEY EQUIPMENT) MAKE: M/S DENKI
Following defects observed in hot plate range :-
Insulation of heat proof cable pertaining to hot plates found low (approx. length : 50 mtr) to be renewed with 06 no. ceramic connectors.
Heat proof Single core control cable from JB to main terminal deteriorated. Same to be renewed. (approx. length: 15 mtrs).
Renewal of rotary switch
300 LTRS HOT WATER CALORIFIER, M/S DENKI QTY - 02 no. (Location- AC Compartment)
Undertake the following routines:- (a) De-scale the heater. (b) Test heater, thermostat for proper insulation resistance etc. (c) Fill water, ensure all parts are watertight and leak proof. (d) Overhaul 02 no. control panel. (e) Clean and paint all parts necessary to prevent rusting. (f) Use new packing, gasket, washers while refitting the apparatus plate, pipe connections. (g) Ensure all electrical components are fixed correctly and wiring connections are appropriate as per terminal markings. (h) Renew Earthing strip. (j) Check the insulation resistance of complete unit including control panel before commissioning of Calorifier.
Hot water circulating Pump (monoblock) along with motor (415V, 3-phase, 50 Hz, 0.37KW, M/s Garbaino, Italy) to be overhauled as per instruction mentioned in technical requirement. (Bearing No 6201-ZZ/C3).
DRYING TUMBLER CONTROL PANEL &MOTOR M/S STEFAB INDUSTRIES LTD,
Drying Tumbler Motor (415 V, 3-ph, 1.5 KW, 02 no.) to be overhauled as per instruction mentioned in technical requirement. (Bearing no- 6204 C3)
Drying Tumbler Control Panel to be overhauled as per instruction mentioned in technical requirement. Calibration of 02 no. over-load relays (TDR, 18 A – 25 A) to be carried out. Calibration certificate to be provided. (Spares contractor Supply)
Washer Extractor Motor (415V, 3-Ph, 7.5 KW) to be overhauled. Check electromagnetic clutch's gap and ensure it is not more than 0.5 mm. Replace V-belt. (Bearing No – 6306 - ZZ & 6208 - ZZ) (Spares contractor supply)
Laundry Washer Extractor control panel to be overhauled as per instruction mentioned in technical reuirement. (Spares contractor Supply)
WATER TIGHT SLIDING DOOR (MAKE: GODREJ), QTY-10 NO.
Control panel of watertight sliding door to be overhauled and system to be proved for satisfactory operation.
WATER MIST SYSTEM (M/s GRUNDFOSS, HUNGARY)
Motor (415V, 3-Phase, 5 KW) to be Overhauled as per instruction mentioned in technical requirement.
Starter Panel (at ASP) and Control Panel in DCHQ to be overhauled as per per instruction mentioned in technical requirement. In addition to this calibration of O/L relay and activation of water mist system from all the 07 locations to be proved.
FOAM LIQUID TRANSFER PUMP MOTOR (M/S GRUNDFOSS)
Overhauling of Motor (415V, 3-Phase, 7.5KW) to be carried out as per instruction mentioned in technical requirement. (Bearing No 6206-Z& 2308B).
Overhauling of 02 in no Starter panel to be carried out as per instruction mentioned in technical requirement. Calibrate over load Relay (16 -24A, LRD-22). Calibration certificate to be provided. (Spare contractor supply)
BALLAST PUMP MOTOR & CONTROL PANEL (55 KW, 415V, 3-PHASE)–02 NO.M/s CROMPTON/MARINE ELECTRICALS
Overhauling of ballast pump motors (415V, 3-phase, 50 Hz, 55KW, M/s Brook Crompton, T-DF250M2) to be carried out as per instruction mentioned in technical requirement. (Bearing No-6313C3)
Overhauling of starter panels (M/s Marine Electrical) to be carried out as per instruction mentioned in technical requirement.
Calibration of following to be carried out and Calibration certificate to be provided.
Over load Relay (48-65A, LRD-3359)
Ammeter (0-150A/900A)
HELO HANGAR WINCH (M/s SEW-EURODRIVE)
Helo Hangar Winch Motor (415V, 3-phase, 50Hz, 4KW) to be overhauled as per instruction mentioned in technical requirement. (Bearing No 6309-ZZ & 6305-ZZ)
Helo Hangar Door motor (415V, 3-phase, 50Hz, 2KW) to be overhauled as per instruction mentioned in technical requirement. (Bearing No- 6303-ZZ & 6302-ZZ).
Following to be overhauled and proved for satisfactory operation:-
Control Panel of Helo Hangar Winch Motor
Control panel of Helo Hangar Door Motor
Check upper & lower limit switch (05 no.) for operation of motor cut-off/cut-in. Calibration Certificate to be provided. (Spares contractor Supply)
HELO STARTING RECTIFIER, M/S AUTOMATIC ELECTRONIC CONTROLS
Calibration of following Meters to be carried out. Calibration Certificate to be provided.
Voltmeter (0-500V)
Ammeter (0-1500A)
BME LUB OIL PRIMING PUMP MOTOR (415V, 50HZ, 3-PHASE, 5.5 KW)
Overhauling of Motors (415V, 3-Phase, 50 Hz, 5.5 KW) of both Main Engine lub oil priming pumps to be carried out as per instruction mentioned in technical requirement.
GENERAL LIGHTING SYSTEM (230 V AC)
Weather deck switch sockets (230 V AC, 15 Amps) of ceremonial lights deteriorated and defective. Same to be renewed as per sample. (Material & spare contractor supply)
Weather deck general light fittings deteriorated and causing water ingress. Same to be renewed. In way job includes fabrication of bracket (Mat: MS) and fitment of light fittings. (Spare CG supply)
POWER DISTRIBUTION AND LIGHTING DISTRIBUTION BOARD(415V, 3-PHASE)
Panel locking mechanism of power distribution panel and lighting distribution panel defective. Same to be renewed as per sample.
WINDOW WIPERS, MAKE- M/S JUNG-A MARINE
Overhauling of window wiper motors with accessories to be carried out and all wiper blades to be renewed as per sample.
Space heaters of window wiper system defective. Same to be renewed as per sample. System to be proved for satisfactory operation. In way job includes removal of toughened glass of LSO & bridge.
TVRO SYSTEM, M/S KNS
Laying of 04 no. RF cables (Approx length – 30 mtrs each) from SRE to SO’s cabins to be carried out. In way job includes opening of bulk-head panels, re-fitment and securing of RF cables. (Material & Spares contractor supply)
HELO TALKBACK SYSTEM (MAKE: M/S VINGTOR STEENHANS)
Complete overhauling of Helo talkback system including Central Command Unit ETB-5 and PSU (SPS-4) to be carried out and proved for satisfactory operation from all four positions. To be undertaken through PAC firm. Overhauling includes following:- (a) 01 in no. station talkback (STB-3) (b) 02 in no. station talkback (STB-5)
Provision of recording system with Milking facility for all Helo communication equipment at LSO Cabin. Authority-CGHQ letter TS/300/63/MF/PCV dated 06 Jul 23.
Marinecraft Engineers Pvt. Ltd.
INDAUST MARITIME PVT LTD
Bidder Name
VOYAGER MARINE SERVICES INDIA PRIVATE LIMITED
INDAUST MARITIME PVT LTD
Marinecraft Engineers Pvt. Ltd.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .