| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.9 LAccepted-Finance | ₹6.9 L | L1 | Accepted-Finance L1 |
| 2 | L2₹8.7 L+₹1.7 L (25.2%)Rejected-Finance | ₹8.7 L+₹1.7 L (25.2%) | L2 | Rejected-Finance L2 |
| 3 | L3₹8.9 L+₹1.9 L (28.0%)Rejected-Finance A R AND M O ON VARIOUS ROAD IN SECTION NALAGARH 1 UNDER NALAGARH SUB DIVISION SH HIRING OF JCB | ₹8.9 L+₹1.9 L (28.0%) | L3 | Rejected-Finance L3 |
| 4 | L4₹10.5 L+₹3.6 L (51.8%)Rejected-Finance OPPOSITE WINSON TEXTILE MILL SAI ROAD BADDI DISTRICT SOLAN H P | ₹10.5 L+₹3.6 L (51.8%) | L4 | Rejected-Finance L4 |
| 5 | Rejected-Technical | - | - | Rejected-Technical Not eligible as per NIT Conditions |
| Sl No | Description | Qty | Unit | Manoj Kumar L3 | Arun Chaudhary L1 | M/S Bajrang Enterprises L4 | Rajinder Kumar Thakur L2 |
|---|---|---|---|---|---|---|---|
| 1.00 | Demoliton abelow G.L upto 1.50 mtrs depth incuding stacking of servicebale materials and disposal of un-serviceable materials within 20 mtrs lead and including cutting the necessasry reinforcement and separating from RCC /RB and to the entire satisfaction of the Engineer-in-charge. | 15.53 | Cum | 5,800 ₹90,074 | 5,300 ₹82,309 Lowest | 7,000 ₹1,08,710 | 5,700 ₹88,521 |
| 2.00 | Providing form work with steel plates 3.15mm thick welded with angle iron in frame 30x30x5mm so as to give a fair finish including centering shuttering, strutting and propping etc. with wooden battens and ballies, height of propping and centering below supporting floor two ceiling not exceeding 4 mtr and removal of the same for in-situ reinforced concrete and plain concrete working:- | - | - | - | - | - | - |
| 2.01 | Flat surfaces such as soffits of suspended floor landings and the like up to 200mm thickness and to the entire satisfaction of the Engineer-in-charge. | 122.71 | Sqmt | 620 ₹76,080.2 | 480 ₹58,900.8 Lowest | 1,000 ₹1,22,710 | 600 ₹73,626 |
| 2.02 | Edges of slab (long side) in all leads and lifts and to the enitre satisfaction of the Engineer-in-charge | 5.17 | Sqmt | 150 ₹775.5 | 100 ₹517 Lowest | 200 ₹1,034 | 140 ₹723.8 |
| 2.03 | Sides and soffits of beams, haunchings, cantilevers, girders, bressumers and lintels exceeding 1.00 mtr in depth in all leads and lifts and to the entire satisfaction of the Engineer-in-charge. | 73.62 | Sqmt | 590 ₹43,436.39 | 490 ₹36,074.29 Lowest | 800 ₹58,896.8 | 600 ₹44,172.6 |
| 3.00 | Providing and laying cement concrete 1:2:4 (1cement:2sand:4 graded stone aggregate 20mm nominal size) and curing complete excluding the cost of form work and reinforcement for reinforced concrete work in :- | - | - | - | - | - | - |
| 3.01 | Suspended floor roofs landing shelves and their supports balconies, beams girders bressumers and cantilevers up to floor two level. | 17.57 | Cum | 9,100 ₹1,59,887 | 8,300 ₹1,45,831 Lowest | 8,900 ₹1,56,373 | 9,000 ₹1,58,130 |
| 4.00 | Providing laying of tor steel reinforcement for RCC work including bending binding cutting and placing in position complete in all depths and heights and to the entire satisfaction of the Engineer-in-charge. | 1,581.67 | P/kg | 139 ₹2,19,852.13 | 90 ₹1,42,350.3 Lowest | 120 ₹1,89,800.4 | 130 ₹2,05,617.1 |
| 5.00 | 6mm thick cement plaster in CM 1:3 (1cement: 3sand) in all leads and lifts and to the enitre satisfaction of the Engineer-in-charge. | 122.7 | Sqmt | 212 ₹26,012.4 | 180 ₹22,086 Lowest | 230 ₹28,221 | 210 ₹25,767 |
| 6.00 | Repair of plaster in patches of 2.50 sqm and under and 10 to 15mm thick including cutting the patch in proper shape and replastering the surface with wall including disposal of rubbish to the dumping ground with in all leads and lifts and to the entire satisfaction of the Engineer-in-charge. | 57.9 | Sqmt | 490 ₹28,371 | 380 ₹22,002 Lowest | 520 ₹30,108 | 500 ₹28,950 |
Tender Value
₹7.3 L
EMD Value
₹14,660
Closing Date
15 Jul 2026, 3:00 pmClosed
EE JSV Division Jagatkhana
EE JSV Division Jagatkhana
(SH. Demolition, reconstruction of RCC slab 1st Floor JSV Sub-Division Bassi and white washing/painting of the Sub-Divisional building).
2026_HPIPH_138182_1
NIT 4402-4501 dt 04.07.2026
Open Tender
Repair and Maintenance Works
Item Rate
60 days
Bassi
Please refer Tender documents.
3 documents required · 3 mandatory
₹350
Yes
₹14,660
Yes
30 Jul 2026
6 Jul 2026
15 Jul 2026
6 Jul 2026
15 Jul 2026
6 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demoliton abelow G.L upto 1.50 mtrs depth incuding stacking of servicebale materials and disposal of un-serviceable materials within 20 mtrs lead and including cutting the necessasry reinforcement and separating from RCC /RB and to the entire satisfaction of the Engineer-in-charge. | 15.53 | Cum | 100 | ₹1,553 |
| 2 | Providing form work with steel plates 3.15mm thick welded with angle iron in frame 30x30x5mm so as to give a fair finish including centering shuttering, strutting and propping etc. with wooden battens and ballies, height of propping and centering below supporting floor two ceiling not exceeding 4 mtr and removal of the same for in-situ reinforced concrete and plain concrete working:- | - | - | 100 | - |
| 2.01 | Flat surfaces such as soffits of suspended floor landings and the like up to 200mm thickness and to the entire satisfaction of the Engineer-in-charge. | 122.71 | Sqmt | 100 | ₹12,271 |
| 2.02 | Edges of slab (long side) in all leads and lifts and to the enitre satisfaction of the Engineer-in-charge | 5.17 | Sqmt | 100 | ₹517 |
| 2.03 | Sides and soffits of beams, haunchings, cantilevers, girders, bressumers and lintels exceeding 1.00 mtr in depth in all leads and lifts and to the entire satisfaction of the Engineer-in-charge. | 0.4 | Sqmt | 100 | ₹39.9 |
| 3 | Providing and laying cement concrete 1:2:4 (1cement:2sand:4 graded stone aggregate 20mm nominal size) and curing complete excluding the cost of form work and reinforcement for reinforced concrete work in :- | - | - | 100 | - |
| 3.01 | Suspended floor roofs landing shelves and their supports balconies, beams girders bressumers and cantilevers up to floor two level. | 17.57 | Cum | 100 | ₹1,757 |
| 4 | Providing laying of tor steel reinforcement for RCC work including bending binding cutting and placing in position complete in all depths and heights and to the entire satisfaction of the Engineer-in-charge. | 1,581.67 | P/kg | 100 | ₹1,58,167 |
| 5 | 6mm thick cement plaster in CM 1:3 (1cement: 3sand) in all leads and lifts and to the enitre satisfaction of the Engineer-in-charge. | 122.7 | Sqmt | 100 | ₹12,270 |
| 6 | Repair of plaster in patches of 2.50 sqm and under and 10 to 15mm thick including cutting the patch in proper shape and replastering the surface with wall including disposal of rubbish to the dumping ground with in all leads and lifts and to the entire satisfaction of the Engineer-in-charge. | 57.9 | Sqmt | 100 | ₹5,790 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.52 MB
PWD8.pdf
Tender Documents • 1.42 MB
PWD6.pdf
Tender Documents • 0.68 MB
TC.pdf
Additional Documents • 0.46 MB
BOQ_204667.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .