| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹2.3 LAccepted-AOC | L-1 | Accepted-AOC Being the lowest bidder | |
| 2 | L-2₹2.7 L+₹37,096 (16.1%)Rejected-AOC | L-2 | Rejected-AOC Being other than the lowest bidder | |
| 3 | L-3₹2.8 L+₹49,000 (21.2%)Rejected-AOC 122 122 AVAS VIKAS CIVIL LINES CIVIL LINES BAREILLY UTTAR PRADESH 243001 | BAREILLY | UTTAR PRADESH | 243001 | L-3 | Rejected-AOC Being other than the lowest bidder | |
| 4 | L-4₹2.8 L+₹53,000 (22.9%)Rejected-AOC 96 KUNWAR COMPLEX CIVIL LINES BAREILLY UTTAR PRADESH 243001 | BAREILLY | UTTAR PRADESH | 243001 | L-4 | Rejected-AOC Being other than the lowest bidder | |
| 5 | L-5₹3.0 L+₹65,000 (28.1%)Rejected-AOC | L-5 | Rejected-AOC Being other than the lowest bidder |
Tender Value
Refer Docs
Closing Date
19 Sept 2020, 6:00 pmClosed
Maj Kapil Dev
GARRISON ENGINEER (PROJECT) MILITARY ENGINEER SERVICES SHAHJAHANPUR ROAD BAREILLY-243001
JOB WORK ORDER FOR OUTSOURCING OF CONSULTANCY FOR PROVN OF 0.5MW ROOF TOP BASED SOLAR POWER PLANT AT BAREILLY
2020_MES_368105_2
3101/QTN/JO/01/20-21/E3
Open Tender
Job Works
Lump-sum
30 days
GE (PROJECT) BAREILLY
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
Exempted
28 Sept 2020
5 Sept 2020
21 Sept 2020
5 Sept 2020
19 Sept 2020
7 Sept 2020
5 Sept 2020 - 6 Sept 2020
Comprehensive consultancyfor preparation and assistance in finilisation of tender for contract including recce of site, finalization of suitability of site chosen, collection of preliminary data, roof top shadow analysis, design of all components of SPV power plant, preparation of drawings, preparation of BOQ, schematic diagram along with rate analysis & its supporting details, engineering of half Mega Watt peak roof top AC solar photovoltaic plant at Bareilly in Time line as given in Annexure A1 with following details :- Tendering, order placement. : Consultant will conduct post Adm Approval planning and prepare detailed project report along with tender for main contract based on the broad parameters of Approximate Estimate forming part of Adm Approval and recce of site. The details will included but not be limited to items at Annexure A2 and will form part of Detailed Project Report, ensuring inclusion of all item as per MNRE/GoI policy stipulations E-in-C Br policy, SERC for metring, grid connectivity, and other laid down norms for construction of 11 KV switch yard, especially with respect to domestic content requirement (DCR). Note : Consultant shall also provide assistance after receipt of tender of technical bd. They will provide technically qualified engineer at HQ CE Bareilly Zone till the acceptance of tender. (i) Site survey and collection of requisite preliminary data. (ii) Analysis of electric power distribution from the sub station and power consumption. (iii) Analysis of roof top shadow free area available at site. (iv) Design of all components of system and preperation of detailed BOQ. (v) Preparation of design and drawings. (vi) Code requirement & statutory requirement. (vii) Interface requirement. (viii) Operability with maintainability. (ix) Adequacy of Design to meet functional and Guaranteed. Annexure A1 : Anticipated timelines/milestones fro different activities of Project Management Consultancy. Annexure A2 : List of works/items to be mandatorily included in DPR and tender. Note Estimated Cost : Rs 2,84,000.00 Chargeable code head : 01/902/33 Authority : HQ CEBZ letter No 824223/BLY/61/E2(Plg) dated 19 Jun 2020
NRR POWER SOLUTION PVT LTD
GREENAGE INDIA RESOURCES PRIVATE LIMITED
MONIKA OFFICE AUTOMATION
ECO LIGHT TECHNOLOGIES
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .