Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹6.2 LAdmitted-Finance | -25.00% | ₹6.2 L | L1 | Admitted-Finance |
| 2 | L2₹7.7 L+₹1.4 L (22.7%)Admitted-Finance | -7.99% | ₹7.7 L+₹1.4 L (22.7%) | L2 | Admitted-Finance |
| 3 | L3₹7.7 L+₹1.5 L (23.5%)Admitted-Finance | -7.36% | ₹7.7 L+₹1.5 L (23.5%) | L3 | Admitted-Finance |
Tender Value
₹8.3 L
EMD Value
₹16,650
Closing Date
19 Aug 2026, 6:00 pmClosed
Executive Engineer REW Samba
Office of the Executive Engineer REW Samba
Please refer as per BOQ
2026_RDPR_319883_1
55 REW Samba of 2026-27, Dated 07.08.2026
Open Tender
Civil Works
Percentage
Ramgarh
Please refer as per Tender documents.
3 documents required · 3 mandatory
₹600
Executive Engineer REW Samba
₹16,650
19 Sept 2026
7 Aug 2026
20 Aug 2026
7 Aug 2026
19 Aug 2026
7 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: | 93.76 | Cum | 479 | ₹44,911.04 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 6.89 | Cum | 4,826.5 | ₹33,254.59 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 20.66 | Cum | 5,733.6 | ₹1,18,456.18 |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form work for Foundations, footings, bases for columns | 122.51 | sqm | 286.35 | ₹35,080.74 |
| 5 | Honey-comb brick work 10/11.4 cm thick with common burnt clay (non-modular) bricks of class designation 75 in superstructure above plinth level upto floor five level in cement mortar 1:4 (1 cement : 4 coarse sand) including curing complete | 40.5 | Sqm | 713.1 | ₹28,880.55 |
| 6 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 infoundation and plinth including curing in Cement mortar 1:6 ( 1 cement : 6 coarse sand) | 55.13 | Cum | 7,571.55 | ₹4,17,419.55 |
| 7 | 12mm Cement plaster of mix 1 : 6 ( 1 cement : 6 fine sand) | 414.9 | Sqm | 266 | ₹1,10,363.4 |
| 8 | Carrige of Sand, Bajri, Stone Aggregates average lead of 10km | 56.4 | Cum | 279.04 | ₹15,737.86 |
| 9 | Carriage of Bricks for average lead of 10km | 26,220 | Nos | 0.54 | ₹14,035.57 |
| 10 | Provision for Painting LMR | 15 | nos | 1,000 | ₹15,000 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.88 MB
BOQ_1061132.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .