Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹1.5 CrAccepted-AOC | ₹1.5 Cr | L-1 | Accepted-AOC Found Lowest one |
| 2 | L-2₹1.6 CrRejected-Finance VPO TEHSIL JAWALI DISTT KANGRA HP | KANGRA | HIMACHAL PRADESH | 175013 | ₹1.6 Cr | L-2 | Rejected-Finance High rate quoted |
| 3 | L-3₹1.7 CrRejected-Finance R O VILLAGE DADOH PO DHABAN TEHSIL BALH DISTRICT MANDI HP 175027 | MANDI | HIMACHAL PRADESH | 175027 | ₹1.7 Cr | L-3 | Rejected-Finance High rate quoted |
| 4 | L-4₹1.7 CrRejected-Finance | ₹1.7 Cr | L-4 | Rejected-Finance High rate quoted |
| 5 | L-5₹1.7 CrRejected-Finance | ₹1.7 Cr | L-5 | Rejected-Finance High rate quoted |
| Sl No | Description | Qty | Unit | ANIL KUMAR VASHISHT(GOVT, CONTRACTOR) L4 | gagan ohri L5 | GANTANTAR THAKUR L6 | MOHAMMAD SALMAN L3 | MADAN KATOCH L2 | Saurabh Vasudeva L1 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavation in drain and channels etc. in all kinds of soil such as pick work,jumper work,blasting work soft and hard rock and saturated soil including dressing of sides and beds and disposing of excavated earth within all leads and lifts as per the direction of Engineer-in-charge. | 1,453.83 | Cubic metre | 275 ₹4.0 L | 350 ₹5.1 L | 600 ₹8.7 L | 300 ₹4.4 L | 300 ₹4.4 L | 280 ₹4.1 L |
| 2.00 | Dressing of bed and preparation of sub-grade for stone lining in all kinds of soil within all leads and lifts as per the direction of Engineer-in-charge. | 1,264.2 | Square metre | 30 ₹37,926 | 40 ₹50,568 | 10 ₹12,642 | 90 ₹1.1 L | 55 ₹69,531 | 50 ₹63,210 |
| 3.00 | Excavation in foundation trenches etc.in earth work in all kinds of soil such as pick work,jumper work,blasting in soft and hard rock and chiselling work including saturated soil slushy soil and under floor upto all depth and stacking the excavated soil not more than 3 metre clear from the edge of excavation and then returning the stacked soil in 15 centimetre (Fifteen centimetre) layer when required into plinth sides of foundation etc.consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth as directed by the Engineer-in-charge within all leads and lifts. | 1,230.59 | Cubic metre | 390 ₹4.8 L | 350 ₹4.3 L | 650 ₹8.0 L | 300 ₹3.7 L | 325 ₹4.0 L | 400 ₹4.9 L |
| 4.00 | Providing and laying cement concrete 1:4:8 (One cement is to four sand is to eight graded stone aggregate 40 milimetre nominal size) and curing complete excluding the cost of form work in foundation and plinth within all leads and lifts as per the direction of Engineer-in-charge | 137.98 | Cubic metre | 6,175 ₹8.5 L | 6,000 ₹8.3 L | 6,400 ₹8.8 L | 5,500 ₹7.6 L | 5,500 ₹7.6 L | 4,780 ₹6.6 L |
| 5.00Providing and laying cement concrete 1:1.5:3 (One cement is to One and half sand is to three graded stone aggregate 20 milimetre nominal size) and curing complete excluding the cost of form work and reinforcement for reinforced cement concrete work in:- | |||||||||
| 6.00 | Foundation,footings bases of column and the like mass concrete within all leads and lifts as per the direction of Engineer-in-charge. | 212.34 | Cubic metre | 8,400 ₹17.8 L | 7,500 ₹15.9 L | 8,400 ₹17.8 L | 7,500 ₹15.9 L | 8,500 ₹18.0 L | 6,950 ₹14.8 L |
| 7.00 | Walls (any thickness) butt not less then 0.10 metre thickness) attached pillasters, buttresses, plinth and string courses etc. from top of foundation up to floor two level with in all leads and lifts as per the direction of Engineer-in-charge. | 284.66 | Cubic metre | 8,950 ₹25.5 L | 8,000 ₹22.8 L | 9,000 ₹25.6 L | 7,500 ₹21.3 L | 8,500 ₹24.2 L | 6,950 ₹19.8 L |
| 8.00Providing form work with steel plates 3.15 milimetre thick welded with angle iron in frame 30x30x5 milimetre so as to give a fair finish including centring,shuttering,strutting and propping etc.with wooden battens ballies,height of propping and centring below supporting floor two ceiling not exceeding 4 metre and removal of the same for in-situ-reinforced concrete and plain concrete work in:- | |||||||||
| 9.00 | Vertical surfaces such as walls(any thickness)partitions walls and the like including attached pillasters,buttreses plinth string courses and the like within all leads and lifts as per the direction of Engineer-in-charge. | 3,673.48 | Square metre | 295 ₹10.8 L | 350 ₹12.9 L | 200 ₹7.3 L | 300 ₹11.0 L | 199 ₹7.3 L | 200 ₹7.3 L |
| 10.00 | Providing and laying mild steel/tor steel reinforcement for reinforced cement concrete work including bending binding and placing in position complete upto floor two level within all leads and lifts as per the direction of Engineer-in-charge. | 18,731.66 | Killo gramme | 86 ₹16.1 L | 90 ₹16.9 L | 92 ₹17.2 L | 89 ₹16.7 L | 84 ₹15.7 L | 85 ₹15.9 L |
Tender Value
₹2.0 Cr
EMD Value
₹2.8 L
Closing Date
21 Nov 2025, 5:00 pmClosed
EXECUTIVE ENGINEER
JAL SHAKTI DIVISION PALAMPUR
Providing Laying and jointing of HDPE pipe 355mm dia at RD 350 to 2200 1850 Rmt, C o Nallah Crossing 1 No. and RCC Kuhl at RD 2200 to 3042.80 842.80 Rmt FIS Mian Fateh Chand Kuhl
2025_HPIPH_120323_1
HP IPH 7018-7063 DATED 12.11.2025
Open Tender
Civil Works
365 days
PALAMPUR
Please refer Tender documents.
9 documents required · 9 mandatory
₹5,000
EXECUTIVE ENGINEER
₹2.8 L
13 Mar 2026
12 Nov 2025
22 Nov 2025
12 Nov 2025
21 Nov 2025
12 Nov 2025
Amount
Excavation in drain and channels etc. in all kinds of soil such as pick work,jumper work,blasting work soft and hard rock and saturated soil including dressing of sides and beds and disposing of excavated earth within all leads and lifts as per the direction of Engineer-in-charge.
Dressing of bed and preparation of sub-grade for stone lining in all kinds of soil within all leads and lifts as per the direction of Engineer-in-charge.
Excavation in foundation trenches etc.in earth work in all kinds of soil such as pick work,jumper work,blasting in soft and hard rock and chiselling work including saturated soil slushy soil and under floor upto all depth and stacking the excavated soil not more than 3 metre clear from the edge of excavation and then returning the stacked soil in 15 centimetre (Fifteen centimetre) layer when required into plinth sides of foundation etc.consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth as directed by the Engineer-in-charge within all leads and lifts.
Providing and laying cement concrete 1:4:8 (One cement is to four sand is to eight graded stone aggregate 40 milimetre nominal size) and curing complete excluding the cost of form work in foundation and plinth within all leads and lifts as per the direction of Engineer-in-charge
Providing and laying cement concrete 1:1.5:3 (One cement is to One and half sand is to three graded stone aggregate 20 milimetre nominal size) and curing complete excluding the cost of form work and reinforcement for reinforced cement concrete work in:-
Foundation,footings bases of column and the like mass concrete within all leads and lifts as per the direction of Engineer-in-charge.
Walls (any thickness) butt not less then 0.10 metre thickness) attached pillasters, buttresses, plinth and string courses etc. from top of foundation up to floor two level with in all leads and lifts as per the direction of Engineer-in-charge.
Providing form work with steel plates 3.15 milimetre thick welded with angle iron in frame 30x30x5 milimetre so as to give a fair finish including centring,shuttering,strutting and propping etc.with wooden battens ballies,height of propping and centring below supporting floor two ceiling not exceeding 4 metre and removal of the same for in-situ-reinforced concrete and plain concrete work in:-
Vertical surfaces such as walls(any thickness)partitions walls and the like including attached pillasters,buttreses plinth string courses and the like within all leads and lifts as per the direction of Engineer-in-charge.
Providing and laying mild steel/tor steel reinforcement for reinforced cement concrete work including bending binding and placing in position complete upto floor two level within all leads and lifts as per the direction of Engineer-in-charge.
Steel work welded in built up sections,trusses and framed work including cutting,hoisting and fixing in position and applying a priming coat of red lead paint in gratings,framed guard bars,ladders,railing,brackets and similar type of work within all leads and lifts as per the direction of Engineer-in-charge.
Provision for clamps and holding down bolt complete in all respect within all leads and lifts as per the direction of Engineer-in-charge.
Providing , Laying, jointing, testing and commissioning of HDPE (High Density Polyethylene pipes) of following diametre and class confirmng to IS 4984-1995 with fusion welding process including all necessary fittings, Tees & Bends of all degree in all leads and lifts to the entire satisfacton of Engineer-in-charge.( Earth work in trenches to be measured and paid separatly)
a) 355 milimetre dia.
MADAN KATOCH (BID ID -584352)
MOHAMMAD SALMAN (BID ID -584549)
ANIL KUMAR VASHISHT(GOVT, CONTRACTOR) (BID ID -582587)
gagan ohri (BID ID -584389)
GANTANTAR THAKUR (BID ID -584442)
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.36 MB
Form6.pdf
Tender Documents • 0.36 MB
Form8.pdf
Tender Documents • 1.15 MB
Termsandconditions.pdf
Tender Documents • 0.08 MB
Leadchart.pdf
Tender Documents • 0.29 MB
BOQ_176266.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid