Loading…
Loading…
Tender Value
₹77.1 L
EMD Value
₹1.5 L
Closing Date
8 Jul 2026, 6:00 pm3d left
Executive Engineer
BC Road Jammu
As refer BOQ
2026_PHE_313970_3
e-NIT No. 10 of 2026-27
Open Tender
Civil Works
45 days
BC Road Jammu
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
Executive Engineer
₹1.5 L
B.C. Road Jammu
29 Jun 2026
29 Jun 2026
9 Jul 2026
29 Jun 2026
8 Jul 2026
1 Jul 2026
30 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing cement concrete manually/by mechanical means includingdisposal of material within 50 meters lead as per direction of Engineer-in-charge: 1:3:6 richer mix | 17.1 | cum | 1,725.2 | ₹29,500.92 |
| 2 | Demolishing brick work manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material with in 50 meters lead as per direction of Engineer-in-charge: | 13.61 | cum | 1,458.45 | ₹19,849.5 |
| 3 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 min width) and for shafts, wells, cesspitsand the like not exceeding 10 sqm on plan, including dressing of sides andrammingofbottoms liftupto 1.5m, including getting out excavated earth and disposal of surplus excavatedearthas directed | 1,846.31 | cum | 479.3 | ₹8,84,936.38 |
| 4 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas(exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) includingdisposal of excavated earth lead upto 50meters and lift upto 1.5 m,as directed by Engineer-in-Charge. | 147 | M³ | 187.3 | ₹27,533.1 |
| 5 | Supply of Wire Mesh Crate including carriage from nearest soource of site | 21 | No. | 5,200 | ₹1,09,200 |
| 6 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of Centering & Shuttering (All work upto Plinth Level with 1:4:8 (1 Cement : 4 Sand : 8 Graded stone agg) upto 40 mm | 28.82 | cum | 5,202.9 | ₹1,49,947.58 |
| 7 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of Centering & Shuttering (All work upto Plinth Level with 1:3:6 (1 Cement : 3 Sand : 6 Graded stone agg) upto 20 mm | 139.05 | cum | 5,673.4 | ₹7,88,886.27 |
| 8 | Centring and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns | 845.04 | Sqm | 286.35 | ₹2,41,977.2 |
| 9 | Centring and shuttering including strutting, propping etc. and removal of form work for: Retaining walls, return walls, walls (any thickness) including attached pilasters buttresses, plinth and string course fillets, kerbs and steps etc. | 173.22 | Sqm | 628.95 | ₹1,08,946.72 |
| 10 | Brick work with common burnt clay F.P.S. (non-modualar) bricks of class designation 7.5 in foundation and plinth in Cement mortar 1:6 (1 cement :6 coarse sand) | 5.44 | cum | 7,571.55 | ₹41,189.23 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.86 MB
BOQ_1016373.xls
BOQ • 0.34 MB
10.pdf
PDF • 0.36 MB
Download all tender documents and submit your bid