Tender Value
₹5.6 Cr
EMD Value
₹5.6 L
Closing Date
31 Jan 2026, 10:30 pmClosed
Karnataka Neeravari Nigam Limited
Aishwarya
REHABILITATION AND IMPROVEMENT WORKS TO EMBANKMENT, TEMPLATE, RADIAL GATES, OLD MODEL ROOM AND DG SET OF KARANJA DAM UNDER WORLD BANK AIDED DRIP II Package I
KNNL/2025-26/DA/WORK_INDENT3764
KNNL/2025-26/DA/WORK_INDENT3764
Open
Dam and Allied works
Two Tender Document System(Two Cover)
KNNL Division KPC Div No 1 Bidar
21 documents required · 21 mandatory
General construction Experience Experience under construction contracts that is Construction of RCC drains for at least the last seven years, starting 1st April 2018
Specific Construction and Contract Management Experience A minimum number of similar contracts that is Construction of RCC drains of minimum value that have been satisfactorily and substantially completed between 2018 19 to 2024 25 a One Contract each of minimum value of Rs. 449.50 Lakhs 80 percent of the estimated value of contract b Two Contract each of minimum value of Rs. 337.20 Lakhs 60percent of the estimated value of contract c Three Contract each of minimum value of Rs. 224.80 Lakhs 40percent of the estimated value of contract
For the above and any other contracts substantially completed and under implementation as prime contractor, between 2018 19 to 2024 25, a minimum construction experience in the following key activities successfully completed in any one year of last 7 years1Earthwork/Embankment/Casing to Embankment 9404.50 cum .2PCC/ RCC/CC pavement 2875.30cum3.Reinforcement Steel 111.80 MT usually 80percent of the expected peak rate of construction
Bidders who meet the minimum qualification criteria will be qualified only if their available bid capacity for construction work is equal to or more than the total bid value of the work. The available bid capacity will be calculated as under Assessed Available bid capacity AxNx1.5-B
Financial Aspects Bidder shall demonstrate that it has access to, or has available liquid assets, unencumbered real assets, lines of credit, and other financial means independent of any contractual advance payment sufficient to meet the construction cash flow requirements estimated as Rs. 140.50 Lakhs about 3 months cashflow at peak construction period for the subject contracts net of the Bidders other commitments
Average Annual construction Turnover Minimum average construction turnover of Rs. 1123.90 Lakhs (the amount stated should normally not be less than twice the estimated annual turnover or cash flow in the proposed works contract) calculated as total certified payments received for contracts in progress and/or completed within the last seven financial years divided by 7 years from 2018 19 to 2024 25Note The construction cash flow requirement should be certified by Bank Nationalized or Scheduled Bank in India in form 3.3
Bidders financial position and prospective long-term profitability sound according to criteria established in 3.1 below and assuming that all pending litigation will be resolved against the Bidder
EPF registration certificate with paid challans to be enclosed
GST registration certificate to be enclosed
The Bidder must demonstrate that it will have suitably qualified and in adequate number minimum Key Personnel Construction Manager 1 Site Engineer 2 Quality Control Engineer 1 Site Engineer 1 Environment and Social Expert Need Based Consent letter to be submitted by the Key Personnels
The Bidder must demonstrate that it will have access to the key Contractors equipment listed Transit Mixer 2 Dumper or Tipper 4 Hydraulic Excavator 2 Vibratory roller 2 Grader or Paver 1 Water Tanker for Curing and Watering 1 Quality Control Lab 1 Equipments required are own
Nationality in accordance with ITB 4.4
No conflicts of interest in accordance with ITB 4.2
Contractors should be registered as KPWD Class-1 Civil Contractors
Not having been excluded as a result of prohibition in the Borrowers country laws or official regulations against commercial relations with the Bidders country, or by an act of compliance with UN Security Council resolution, both in accordance with ITB 4.8 and Section V.
Not having been declared ineligible by the Bank, as described in ITB 4.5.
State-owned enterprise or institution of the Borrower country :Meets conditions of ITB 4.6
Non-performance of a contract did not occur as a result of contractor default since 1stApril2017
Not under suspension based on execution of a Bid/ Proposal Securing Declaration pursuant to ITB 4.7 or withdrawal of the Bid pursuant ITB 19.9
No consistent history of court/arbitral award decisions against the Bidder since 1stApril2017
Declaration Environmetal and social ES Past performance Declare any civil work contracts that have been suspended or terminated and or performance security called by an employer for reasons of breach of environmental or social including Sexual Exploitation, and Assault contractual obligations in the past Seven years
₹5,000
₹5.6 L
1 Jan 2026
1 Jan 2026
2 Feb 2026
12 Jan 2026
12 Jan 2026
REHABILITATION AND IMPROVEMENT WORKS TO EMBANKMENT, TEMPLATE, RADIAL GATES, OLD MODEL ROOM AND DG SET OF KARANJA DAM UNDER WORLD BANK AIDED DRIP II (Package I)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
Karanja DRIP 2 Tender Notification.docx
Others - Tender Notification Final • 0.08 MB
DRIP FINAL Bid Document Dec.docx
Tender Document • 1.02 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .