| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.7 LAccepted-AOC BAROJ ROAD SHAKTI NAGAR COLONY DISTRICT BIJNOR | BIJNOR | BIJNOR | UTTAR PRADESH | L1 | Accepted-AOC Agreement10/EE/2022-23 | |
| 2 | L2₹17.9 L+₹14,884.90 (0.84%)Rejected-Finance PLEASE PROVIDE THE DOCUMENT CONTAINING THE ADDRESS | NEW DELHI | DELHI | 110001 | L2 | Rejected-Finance L2 |
Tender Value
₹18 L
EMD Value
₹36,000
Closing Date
28 Dec 2021, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EXECUTIVE ENGINEER
MGCCD-3 AMROHA
LOT 27 Construction Of V.R.B Cum Fall at km 3.800 of Jatpura Minor OF M.G.C STAGE-II
2021_UPIDC_661701_27
03/EE/2021-22
Open Tender
Civil Works - Canal
Item Rate
90 days
AMROHA
Please refer Tender documents.
2 documents required · 2 mandatory
₹854
₹36,000
27 Sept 2022
22 Dec 2021
29 Dec 2021
22 Dec 2021
28 Dec 2021
22 Dec 2021
90 days
Amount
Earth work in excavation of foundation i/c lead upto 30.00m & lift upto 1.50m
Shuttering for P.C.C. including cost of material, labour and T&P etc complete.
Providing and Laying P.C.C.1:3:6 of Abutment including cost of material, labour and T&P etc complete.
Ist Class Brick work 1:4 C.M./including all cost of material, labour & T&P etc. complete.
Struck deep pointing in 1:2 csm i/c including cost of material, labouru and T&P etc. complete
C.C (M-20 grade) 1:1.5:3 with cost of material in wearing coat , AND CC BLOCK labour and T&P etc complete
Supplying and filling Coarse sand below c.c block including cost of all material, labour and T & P etc.
Supplying and filling Shingle(4-20 mm) below c.c block including cost of all material, labour and T&P
Supplying and filling Shingle(20-40 mm) below c.c block including cost of all material, labour and T&P
Providing and laying Ist class Brick on edge soiling 110 mm thick including cost of material, labour and T&P etc complete.
Shuttering for R.C.C including cost of material, labour and T&P etc Complete
Supplying and placing steel reinforcement for RCC work in including cost of material, labour of cutting, bending, binding and T&P etc Complete
RCC 1:1.5:3 in slab and cap including cost of material, labour of and T&P etc Complete
P.C.C.1:6:12 in back feeling of abutment including all cost of material, labour and T&P etccomplete.
S/F Drainage Spout P.V.C. 75 mm dia pipe including all cost of material, labour and T&P etc complete.
S/F 25 mm thick expansion joints i/c cost of material, labour and T&P etc complete.
S/Laying Tarfelt in 3- layers for Bearing slab i/c cost of material, labour and T&P etc complete.
S/Lwheel Guard stone including gcost of material, labour and T&P etc complete.
Earth work in Removing diversion with all lead & lift i/c all labour,T&P etc complete.
Dry brick pitching 230mm deep and 3m height i/c all labour,T&P etc complete.
Earth work in filling for making ramp i/c manual compation ramming, dressing surface to required levels & slope i/c all labour,T&P etc complete.
ABHAY SINGH
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .