Tender Value
₹8.0 L
EMD Value
₹8,000
Closing Date
8 Apr 2026, 5:00 pmClosed
Similar tender results from the same govt authority in the past 3 years.
Deputy Executive Engineer, Irrigation Sub Division,Una
Cleaning of Downstream side gutter and Cleaning Pine and Slushy Soil at Downstream gorge Portion of Machchhundri irrigation Scheme.
291582
Tender Notice No 5 of 2025-26
Open
Civil - All
Gir Somnath
6 documents required · 6 mandatory
₹900
Executive Engineer, Gir Somnath Irrigation Division,Veraval
₹8,000
30 Mar 2026
30 Mar 2026
30 Mar 2026
8 Apr 2026
30 Mar 2026
BILL OF QUANTITIES
(A) Percentage Rate Tender (Up to INR 50 Cr. )
Item Description of Item (with brief Quantity Unit Rate In Amount
No specification and reference to book figures
of specifications)
1 Cutting & removing green water grass 19649.00 Sqmt 19.70
(pine ) with silt under slushy condition
from canal bed or bucket including
dispose off and cleaning the surface
including removal of silt, debris etc for
all lead & lift etc complete as directed.
2 Clearing slushy soil and mud including 4836.30 Cum 85.00
silt, boulders, grass etc ,from canal bed
depositing under water Lifting out the
same from deep canal section by
mechanical means or other equipment
,including depositing the lifted
material in spoil bank as & where
directed for lead up to 30 mt. etc
complete. (a) Depth 3.0 to 6.00 mt.
I/We am/are willing to carry out the work at… % above/below percent (Should be written
in figures and words) of the estimated rate mentioned above. Amount of my /our tender works out
Estimated amount put to tender Estimated amount put to tender
Deduct………% below Add………% Above
In words In words
(B) For Item Rate Tender (For above INR 10 Cr.):
Item Description of Item Quantity Unit Rate Amount
No (with brief specification
and reference to book of In In
specifications) figures Words
(A) Total Tendered Amount
(B) Rebate on above tendered amount (if any) % (in figure) ……………………………… (in
(C)Net Tendered Amount (A-B) (in figure) ………………………………
1 The Contractor shall exhibit a board with detailed specification and details of work as directed
by the Engineer-In-Charge for which no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.:
No. MIS 102010/17/K1, dtd. 30/07/2018 as stated in S.O.R. therefore in R.C.C. items where there
is a change as per actual mix design the cost of difference of cement consumption have been
deducted from the rate of original item at the rate of input rate mentioned in all the tender.
Signature of Contractor Deputy Executive Engineer,
Irrigation Sub Division,
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
3.Cle.DownStream Machhundri Tender.pdf
3.BOQ.pdf
3.Tender Notice No 5 of 2025-26.pdf
Download all tender documents and submit your bid