Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.4 LAccepted-AOC | L1 | Accepted-AOC Being lowest bidder and reasonable | |
| 2 | L2₹25.2 L+₹80,190 (3.28%)Rejected-AOC | L2 | Rejected-AOC Not being lowest bidder | |
| 3 | L3₹25.5 L+₹1.1 L (4.50%)Rejected-AOC NO 228 3RD CROSS HRBR 3RD BLOCK NEAR JALVAYU VIHAR WEST GATE BANGALORE 560043 | BENGALURU URBAN | KARNATAKA | 560043 | L3 | Rejected-AOC Not being lowest bidder | |
| 4 | L4₹29.1 L+₹4.7 L (19.1%)Rejected-AOC | L4 | Rejected-AOC Not being lowest bidder | |
| 5 | L5₹29.4 L+₹5.0 L (20.3%)Rejected-AOC NO 3 JANI JAN KHAN ROAD 1ST LANE ROYAPETTAH CHENNAI 600 014 | CHENNAI | CHENNAI | TAMIL NADU | 600014 | L5 | Rejected-AOC Not being lowest bidder |
Tender Value
Refer Docs
EMD Value
₹63,000
Closing Date
6 Apr 2021, 6:00 pmClosed
GE I R nd D West Bengaluru
GARRISON ENGINEER I R nd D WEST BANGALORE DRDO COMPLEX CV RAMAN NAGAR BANGALORE
OUTSOURCING OF SERVICES FOR SECURITY AND LOGISTIC INSTALLATIONS UNDER GE(I) RndD (WEST) BENGALURU
2021_MES_427748_1
GE(I) R ND D (WEST)/BAN/70 OF 2020-21 8868E8
Open Tender
Manpower Supply
Item Rate
330 days
Bengaluru
Class and Category as per NIT
8 documents required · 8 mandatory
₹500
GE I R nd D West Bengaluru
₹63,000
Yes
17 May 2021
8 Mar 2021
12 Apr 2021
9 Mar 2021
6 Apr 2021
24 Mar 2021
9 Mar 2021 - 23 Mar 2021
Amount
Providing services for security of MES offices, yards, installations and buildings including providing requisite tools, plants, equipments, safety gear, etc. and carrying out other related works as per the instructions/ directions of Engineer-in-Charge on all the days of calendar month including Sundays and Holidays in three shifts per day (1st Shift from 0600 Hours to 1400 Hours, 2nd Shift from 1400 Hours to 2200 Hours and 3rd Shift from 2200 Hours to 0600 Hours) by deploying Chowkidars at locations mentioned here-in-after, complete all as specified and directed. Note: The locations and shift timings shall be as under :- i) Office complex of GE (I) R&D West - 3 Shifts with Chowkidar -1 No per shift (i.e., 3 Nos per day), ii) BSO complex of GE (I) R&D West - 3 Shifts with Chowkidar -1 No per shift (i.e, 3 Nos per day), iii) Office complexes of AGE B/R-III R&D (West) & AGE E/M R&D (West), Chowkidar - 1 No, per shift (i.e, 3 Nos per day) iv) The rates quoted by the Contractor / firm shall not be less than minimum wages as notified by Govt Of India / State Govt / Local body whichever is higher. In case the rates quoted are less than the minimum wages as notified by the Govt of india / State Govt / Local body whichever is higher. v) Tenderer shall arrange insurance to his work-men and relevant proofs of the same shall be submitted to the department as and when demanded, the cost for same shall deemed to be included in the rate quoted. Responsibility of compliance of labour regulations, EPF, ESIC, Bonus, GST, Cess and other levies payable and other related Acts in force lies with the tenderer and strictly adhered to by the contractor. The Contractor shall produce proof of wages, EPF, ESIC, Bonus, GST, Cess paid against the respective workmen while claiming payments.
Notes to Sl Item No 1 (Contd.,) vi) Provisions of statutory laws relating to minimum wages, EPF, EDLI, ESIC, Bonus, GST, Cess & other levies payable shall be strictly adhered to by the contractor. Attention is also drawn to minimum fair wages payable as notified (time to time) by Govt Of India / State Govt / Local body whichever is higher, including all taxes as applicable and quote their rates. Contractor shall not have any claim on account of misunderstanding / under quoting in this regards. The Contractor shall produce proof of wages, EPF, ESIC, Bonus paid against the respective workmen while claiming payments. vii) Contractor’s attention is invited to Labour Wages Act with regards to payment of wages to the individuals engaged under this work. Contractor shall make the payments to their staff / employees by Cheque or through NEFT in their Bank Account, and the particulars of same shall be submitted to the department while claiming any payment. No payments will be made, unless proof of payment of wages through bank account is submitted by the Contractor/firm while claiming bills. (viii) Absent from duty is not permissible as services are essential in nature. In case of non-availability at any point of time, recovery will be made at double the proportional rate quoted by the Contractor. Decision of Accepting Officer will be final, conclusive and binding in this regards.
Solar Electricals and Electronics
S SELVALAKSHMI ENGINEER AND CONTRACTOR
Pacific Enterprises
SRI LAKSHMI ASSOCIATES
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .