Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹2.4 L+₹44,307.09 (22.2%)Rejected-AOC | L2 | Rejected-AOC L2 |
Tender Value
₹2.0 L
EMD Value
₹5,019
Closing Date
26 Jun 2023, 5:00 pmClosed
Assistant Executive Engineer
PWD Buildings Subdivision Kannur
Central Prison and Correctional Home, Kannur-Reconstruction of damaged compound wall at central prison Kannur
2023_PWD_582094_1
PWD/BLDG/13758/2023-24
Open Tender
Civil Works - Buildings
Item Rate
180 days
Kannur
Please refer Tender documents.
7 documents required · 7 mandatory
₹555
Yes
₹5,019
Yes
8 Aug 2023
15 Jun 2023
30 Jun 2023
15 Jun 2023
26 Jun 2023
15 Jun 2023
Amount
Detailed Estimate
15.10.2:Dismantling dressed stone work ashlar face stone work, marble work or precast concrete work manually / by mechanical means including stacking of serviceable and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge:In cement mortar
15.9.2:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In cement mortar
OD34765/2023-2024:Random rubble masonry with Departmental hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 150 landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) : 3 graded stone aggregate 20 mm nominal size).
5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
5.22A.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo - Mechanically Treated bars of grade Fe-500D or more
OD90929/2022-2023:Laterate masonry with nearly dressed stone of size 35x20x20cm or nearst size in cement mortar 1:6 for super structure above plinth level to floor two level including all cost of material .labor etc
OD34766/2023-2024:Laterate massonry with nearly dressed Departmental Laterate stone of size 35x20x20 cm of nearst size in cement mortar for super structre above plinth level to floor two level including all cost of material ,labours etc
13.4.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 coarse sand)
K P ANISH BABU
Bidder Name
K P ANISH BABU
C Dileep Kumar
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_859652.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .