Tender Value
₹22.2 L
EMD Value
₹23,000
Closing Date
11 Jun 2026, 6:00 pm6d left
Executive Engineer, Und Irrigation Division, Jamnagar
BIG CHECKDAM Construction of Checkdam near Ramshibhai Rajabhai Dodiya Land on Local river Gapatiya at village Nana Khadba in Lalpur Taluka of Jamnagar District. (Second Attempt)
309087
04 of 2026-27
Open
Civil Works
Jamnagar
7 documents required · 7 mandatory
₹900
EXECUTIVE ENGINEER UND IRRIGATION DIVISION JAMNAGAR
₹23,000
27 May 2026
27 May 2026
27 May 2026
11 Jun 2026
27 May 2026
BILL OF QUANTITIES
(A) Percentage Rate Tender (Up to INR 10 Cr.)
Name of work : BIG CHECKDAM
Construction of Checkdam near Ramshibhai Rajabhai Dodiya Land
on Local river Gapatiya at village Nana Khadba in Lalpur Taluka of
Jamnagar District. (Second Attempt)
Item Description of Item (with brief Quantity Unit Rate In Amount
No. specification and reference to book of figures
specifications)
1(a) Excavation in all sort of strata and 380.00 Cum. 79.00
formations incl. depositing the unuseful
excavated stuff as and where directed
incl. sorting and stacking useful materials
as directed upto 200 mt lead and all lift
etc. complete incl. dewatering.
(A) IN OVER BURDEN HARD MURRUM.
1(b) (B) IN SOFT ROCK 345.00 Cum. 176.00
1(c) (C) IN HARD ROCK 135.00 Cum. 590.00
2 Drilling 25mm dia. holes at distant as 180.00 Rmt. 252.00
specified upto 3.00 mt. depth in
checkdam foundation and fixing anchor
bars of specified diameter with cement
grout including cleaning holes as
directed etc. (Excluding cost of Bars)
3 Providing, cutting, bending, binding and 3.40 M.T. 76574.00
fixing in position as per drawing TMT
BAR, reinforcement for R.C.C. works and
anchor bars incl cost of black annealed
16 to 18 BWG M.S.. Wire etc. complete
with all lead and lift. (B) Fe-500
4 Prov. & Laying in position cement 450.00 Cum. 3423.00
concrete using cement , sand and
crushed metal coarse aggregate by mass
and machine mix for PCC/RCC including
necessary formworks compaction by
vibrator, curing as directed with all lead
& lift etc complete.(Excluding cost of
steel) FOR .BODY WALL, APRON,
TRAINING WALL, SIDE WALL, SPLAY
WALL, KEY WALL, CUT OF WALL ETC.
4/C) Controlled Concrete Grade M-15 &
5 Providing & fixing in position 100/110 15.00 Rmt. 358.00
mm dia PVC Pipe weep holes in the
retaining walls / side wall / abt. etc.
6 Earthwork / Back filling with selected 270.00 Cum. 141.00
earth brought from out side borrow area
or from excavated useful material
including watering ramming, compaction
with pneumatic temping and all lead and
lift etc. complete.
Item Description of Item (with brief Quantity Unit Rate In Amount
No. specification and reference to book of figures
specifications)
7 Providing & laying graded filters of sand, 30.00 Cum. 530.00
gravel / metal and over size metal (100
to 150 mm) behind the retaining wall &
wing walls as directed as per approved
drawing with all lead and lifts etc.
8 Providing and laying dry rubble stone 100.00 Sqmt. 253.00
pitching without base, inverted graded
filter/Murrum bedding and header stone
including hand packing & trimming &
dressing slopes etc. complete.
(b) 23 cms thick stone pitching.
9 Providing and fixing in position white 1.00 No. 1350.00
plate of size 45 x 45 x 1.8 cms including
engraving. The letters as per drawing /
directed etc. complete.
10 Providing and laying STONE 15 150.00 Cum. 765.00
LOANCHING APRON by using 50% stone
which having weighing not less than
Kg or as specified incl. hand packing and
filling the interstices by spouls etc.
complete with all lead and lift.
I am/we are willing to carry out the work at ____________________ % below/above percent
(Should be written in figures and words) of the estimated rates mentioned above. Amount of
My/Our tender works out as under :-
Estimated Amount Rs. 22,17,191=60 Estimated Amount Rs. 22,17,191=60
Put to Tender Rs. Put to Tender Rs.
Deduct _______% Below Rs. __________ Add _______% Above Rs. __________
Net Rs. Net Rs.
(Rupees in words) ________________________ (Rupees in words) ________________________
1. The Contractor shall exhibit a board with detailed specification and details of work as
directed by the Engineer-In-Charge for which no extra payment shall be made.
2. The labour cess will be deducted as per prevailing rules i.e.1% of the work done.
3. GST and Income tax TDS will be deducted at a source while making payments of bills
4. In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per
Govt.G.R.:PRC-10/2017CementConsumption/16/CDate:11/05/2017as stated in S.O.R.
therefore in R.C.C. items where there is a change as per actual mix design the cost of
difference of cement consumption have been deducted from the rate of original item at the
rate of input rate mentioned in all the tender.
5. The rates to be quoted by the contractor must be inclusive of all duties, taxes, and other
levies except GST payable by the contractor under the contract.
Signature of Contractor Executive Engineer
Und Irrigation Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
3.pdf
BOQ.pdf
Tender Notice No.4.pdf
Download all tender documents and submit your bid