Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Rejected-Technical | Rejected-Technical TECHNICAL SPECIFICATION FOUND NOT OK |
Tender Value
Refer Docs
EMD Value
₹18,000
Closing Date
19 Sept 2023, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE EDC BHADOHI
OFFFICE OF SE EDC BHADOHI
WORK FOR ESTABLISHMENT OF 11/0.4 KV DISTRIBUTION TRANFORMER AND CAPACITY ENHANCEMENT OF OVERLOADED TRANSFORMER UNDER JURISDICTION OF EDD I BHADOHI IN AVAILABILITY OF ADITIONAL FUND IN B.P. 2023-24
2023_PVVNV_833038_1
50/EDC(BH)/2023-24
Open Tender
Electrical Works
Lump-sum
210 days
BHADOHI
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,540
EE EDD I BHAOHI
₹18,000
3 Oct 2023
28 Aug 2023
20 Sept 2023
28 Aug 2023
19 Sept 2023
28 Aug 2023
Amount
Supply of Decentralised materials by contractor for Capacity Enhancment of 11/0.4 kv Sub-station and Construction of 11/0.4 kv Sub-station. Note- Consumables Materials (Nut and bolt) which is given by contractor.
F Breacket with nut&bolt
Clamp for Channel
Alluminium Lugs for TF as per requirment
Cartage and Errection OF WORK Note:- All Centralised Materials Provided by the Department at store.
Carriage of 8.5 Mtr Long PCC Pole from store to site (According to Estimate) with lodding and unlodding.
Errection of 8.5 Mtr Long PCC Pole with all fitting as per respo.
Carriage of 25 KVA TF from Store to site (According to Estimate) with lodding and unlodding.
Installation of 25 KVA TF with all fitting as per respo and Energisation with connecting to 11 kv line.
Receive Back of 10 KVA TF from Site (According to Estimate) to Store bhadohi as per estimate.
Receive Back of 16 KVA TF from Site (According to Estimate) to Store bhadohi as per estimate.
Carriage of 63 KVA TF from Store to site (According to Estimate) with lodding and unlodding.
Installation of 63 KVA TF with all fitting as per respo and Energisation with connecting to 11 kv line.
Receive Back of 25 KVA TF from Site (According to Estimate) to Store bhadohi as per estimate.
Carriage of 100 KVA TF from Store to site (According to Estimate) with lodding and unlodding.
Installation of 100 KVA TF with all fitting as per respo and Engergisation with connecting to 11 kv line.
Receive Back of 63 KVA TF from Site (According to Estimate) to Store bhadohi as per estimate.
Carriage of 250 KVA TF from Store to site (According to Estimate) with lodding and unlodding.
Installation of 250 KVA TF with all fitting as per respo and Energisation with connecting to 11 kv line.
Receive Back of 100 KVA TF from Site (According to Estimate) to Store bhadohi as per estimate.
Carriage of 400 KVA TF from Store to site (According to Estimate) with lodding and unlodding.
Installation of 400 KVA TF with all fitting as per respo and Energisation with connecting to 11 kv line.
Receive Back of 250 KVA TF from Site (According to Estimate) to Store bhadohi as per estimate.
Carriage of ACSR Weasol Conductor from store to site (According to Estimate) with lodding and unlodding.
Errection/Laying of ACSR Weasol Conductor with all fitting as per respo Norms
Carriage of all other Centralised materials from store to site (as per estimate) with lodding and unlodding and Errection/Installation/laying with all fitting as per requirement. 200 Mtr LT XLPE cable 1x400, 420 Mtr LT XLPE cable 1x240, 420 Mtr 11 kv XLPE Cable 3x120 sq mm, 210 Mtr of 3x150 sq mm LT XLPE cable, 620 Mtr AB Cable 3x120 sqmm , 80 Mtr LT XLPE Cable 3.5x70 sqmm, 40 Mtr LT XLPE Cable 3.5x150 sqmm, 70 No. of Stay Complete, 156 No of Disc insulator with fitting, 231 No of Pin Insulator with pin, 53 No of Dropper channel, 27 No. of Top channel, 54 No of Sub-station base, 79 No Of Earthing Complete, 6 No of Fuse Set, 6 No of T-Off Channel , 4 no of V Type Cross Arm.
Construction of Plinth for 250 KVA with all required material as per respo Norms
Concreting/Grouting of PCC pole as per respo.
Concreting/Grouting of stay as per respo.
PRABHAT ENTERPRISES
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .